Post Job Free
Sign in

Quality Control Engineer

Location:
Las Vegas, NV, 89142
Salary:
Negotiable
Posted:
June 01, 2013

Contact this candidate

Resume:

Oscar M. Ledezma

**** ***** ****** ***

Las Vegas, NV 89142

702-***-**** or (702) 702-***-****

abwwjf@r.postjobfree.com

[pic]

Objective

Seeking employment as an Assistant Plant Manager or Production Supervisor utilizing

20+ years of experience.

Skills and Abilities

20+ years experience in Industrial Production and Manufacturing. (DELPHI PACKARD

ELECTRIC)

Proficient with overseeing large manufacturing plants ensuring efficient and quality

production of products.

Strengths in engineering, quality control, production and lean manufacturing

Experienced with manufacturing harnesses for both automotive and household appliance

industries.

Experienced with closing and relocating an Ohio plant to Mexico handling all the

logistics.

Bilingual English/Spanish (fluent - reads, writes and speaks both languages).

Computer Skills: MS Office - MS Word, MS Excel, MS Outlook.

Education

Bachelor of Industrial Engineer of Production - Inst. Juarez, Mexico

Technology

Relevant Experience

PaveStone (via RoLinc Staffing)

10/2012 - 01/2013

Process Technician

Las Vegas, Nevada

Responsible for quality control and for implementing

effective processes.

04/2011 - 09/2011

Polywest

Packager Las Vegas, Nevada

Handle and package plastic bags and reduce down time of

the machine. Make minimal repairs to equipment. Trained

new operators and reduce waste of raw material.

Linkus 01/2011 - 04/2011

Installer / Technician Las Vegas, Nevada

Installer of wire & cable for the installation of DISH

satellite TV, phone & internet services.

Grand Products Nevada 12/2006 - 01/2009

Process Engineer Las Vegas, Nevada

Supported production and development design fabrication

in a flexible manufacturing environment for the gaming

industry. Developed processes of documentation and work

instructions, assisted with training of new personnel and

new products. Recommended and implemented continuous

improvement for quality and productivity. Developed first

pieces (prototypes), prepared quotes and new

manufacturing equipment for production readiness (cell

design). Developed production standards; actualized the

BOM of each product. Developed fixtures and poka yoke in

all aspects of the process and tooling. Harnessed

electronic boards.

Oscar M. Ledezma (Pg. 2) 06/2006 - 11/2006

Sternschnuppe

Lead Technician Las Vegas, Nevada

Implemented a work cell, which, improved productivity,

quality, and delivery of the gaming dashboards. Developed

boards to manufacture harnesses and trained other

technicians on how to interpret the harnesses prints.

Manufactured and tested the coin bolts and assembled slot

machines.

Rent-A-Center 01/2005 - 06/2006

Account Sales Manager Las Vegas, Nevada

Responsible for greeting and assisting customers with

selections, generated computer contracts and assisted

with deliveries as needed. Made collection calls and

payment arrangements. Posted payments (cash, debit/credit

cards and checks), prepared daily deposits and did bank

runs.

Lift All Co. 07/2004 - 09/2004

Plant Manager Las Vegas, Nevada

Supervised and coordinated 16 production workers.

Prepared production forecasts (short, medium and long

term), calculated the quantity of workers needed and

assured manufacturing procedures and policies were

followed. Continually improved the processes and systems.

Verified employee hours daily for payroll.

Via Systems 07/2003 - 06/2004

Process & Manufacturing Engineer Juarez, Mexico

This company fabricated harnesses for household

appliances and employed 1200 employees. Responsible for

relocating the business from Ohio to CD, Juarez, Mexico

with minimum downtime. Designed and installed equipment

and lines and developed methods and systems of work. Did

lay out development and participated in the ISO 9002

event. Did visual controls installation and calculation

of product standards.

Owner / Operator 05/2000 - 07/2003

Automotive Specialty Technician Juarez, Mexico

Started an automotive shop business, specializing in

alignments, balances, brakes, suspensions and steering.

Oversaw 3 mechanics and 2 helpers.

Delphi Packard 10/1980 - 05/2000

Lean Manufacturing Superintendent / Synchronized Mfg. Juarez, Mexico

This plant built automotive harnesses for GM. Supervised

and coordinated 800 direct reports, 85 indirect and 10

salaried employees. Held numerous positions and worked to

improve process, methods, systems and flow of the

material or information with all the areas of the plant

(i.e. maintenance, human resources, materials,

production, engineering, quality control, etc.) Made

production forecasts (short, medium and long term) as

well as calculations of persons needed according to

requirements. Assured the accomplishment of the system,

policies, procedures, and implemented strategies for

continuous improvement. Made projects of cost reduction

and budget administration, implemented the lead prep

system in the plant (cuts, press, and molding).

Synchronized manufacturer and improved process, methods,

and systems for better performance.



Contact this candidate