Post Job Free
Sign in

Staff Engineer

Location:
Pittsburgh, PA, 15216
Posted:
May 30, 2013

Contact this candidate

Resume:

M ichael S. Rebellino, E. I.

**** * ********** ***. ***. 2 Pittsburgh, PA 15216

abwom4@r.postjobfree.com

330-***-****

Registration/Certification

P rofessional Registrations and Certifications

State

Number

Date Exp.

Engineer Intern

132**-*****

current

CFR 1910.120, 40-Hour Health & Safety Training

current

Education: B.S. Civil Engineering, The Ohio State University, 2012 (GPA 3.6/4.0)

Work Experience:

1. Key Envi ronmental, I nc., Staff Engineer (07/23/12 – present)

2. The Ohio Depar tment of T ransportation, T raffic Engineer I n te rn

3. (06/2011 – 11/2011)

P rofessional Experience:

4. One year of experience in Civil and Environmental Engineering consulting

5. Conducted research to ensure projects adequately address all relative requirements and regulations

6. Prepared and assisted in the preparation of AutoCAD drawings for remedial design and land

development projects

7. Utilized HEC-RAS to analyze stream f low characteristics and to design a temporary culvert stream

crossing

8. Prepared and edited reports and permit documents

9. Performed oversight of field operations including drilling and soil sampling

10. Performed hydrology calculations for remedial design and land development projects in order to size

stormwater management appurtenances

11. Performed construction cost estimating and quantity takeoffs for remedial design and land

development projects

12. Performed pavement design calculations for multiple bulk distribution and warehouse facilities

P r ima ry R esponsibilities:

Staff Engineer responsible for the following:

13. Civil Engineering support for remedial design and land development projects

14. Research support for remedial design and land development projects

15. AutoCAD drawings and analysis

16. HEC-RAS analysis

17. Preparation and editing of reports and permit documents

18. Field oversight

19. Hydrology calculations

20. Construction cost estimating

21. Quantity takeoffs

22. Pavement design

M ichael S. Rebellino, Page 3

Staff Engineer

Former Manufactured Gas Plant (MGP): P rovided remedial design support to senior engineer for the

remediation of r iver sediments contaminated with polycyclic aromatic hydrocarbons (PAHs) and metals. Prepared

A utoCAD drawings including design revisions and drawings required for Notice of Intent (NOI) report. Provided

research support. Performed construction cost estimating. Completed hydrology calculations. Performed HEC-

RAS analysis to evaluate current stream f low characteristics and to subsequently design a temporary culvert

Role

Representative P rojects

P roject

Location

stream crossing. Prepared Design Calculations Binder. Edited NOI and Completion Report. Contributed to the

p reparation of Bid Package.

MA

Staff Engineer

Former MGP: P rovided remedial design support to senior engineer for remediation of subsurface soil

contaminated with non-aqueous phase liquid (NAPL); PAHs; and benzene, toluene, ethylbenzene, and xylenes

(BTEX). Prepared AutoCAD drawings including design revisions. Provided research support. Prepared or assisted

i n the preparation of the Erosion and Sediment Control Plan, Stormwater Pollution Prevention Plan,

Construction Contingency Plan, Quality Assurance Project Plan, and Citizen Participation Plan. Prepared

quantity takeoffs. Performed field oversight of drilling and soil sampling activities. Prepared Laboratory Work

O rders for soil samples. Contributed to preparation of Bid Package.

NY

Staff Engineer

P roperty Development of 11-lot Single-family Home Subdivision: P repared AutoCAD drawings including

single-family home layout, overall grading plan, roadway layout, piping network layout, and overall site plan.

Performed quantity takeoffs.

PA

Staff Engineer

P roperty Development of Self-Storage Facility Expansion: P repared conceptual grading and site plan for

p roposed layout of storage facility expansion. Performed quantity takeoffs and construction cost estimating.

PA

Staff Engineer

Test Pad Evaluation: A n exposed geomembrane liner was implemented as part of a final closure system at a fly

ash impoundment site. Performed site investigation and oversight of test pad evaluation.

WV

Staff Engineer

Former Wood T reating Facility: P repared Corrective Measures Implementation Work Plan (CMI-WP) for the

closure/remediation with controls planned for the site. Prepared design drawings to accompany CMI-WP and

a ttached Soil Management Plan, including Site Location Map, Existing Conditions, and Proposed Soil Cover

P lacement drawings.

TX

Staff Engineer

Bulk Distribution/Warehouse Facilities Pavement Design: Performed pavement design calculations for

replacement of asphaltic concrete pavements at multiple bulk distribution/warehouse facilities.

MD



Contact this candidate