M ichael S. Rebellino, E. I.
**** * ********** ***. ***. 2 Pittsburgh, PA 15216
*********.*@***********.***.***
Registration/Certification
P rofessional Registrations and Certifications
State
Number
Date Exp.
Engineer Intern
current
CFR 1910.120, 40-Hour Health & Safety Training
current
Education: B.S. Civil Engineering, The Ohio State University, 2012 (GPA 3.6/4.0)
Work Experience:
1. Key Envi ronmental, I nc., Staff Engineer (07/23/12 – present)
2. The Ohio Depar tment of T ransportation, T raffic Engineer I n te rn
3. (06/2011 – 11/2011)
P rofessional Experience:
4. One year of experience in Civil and Environmental Engineering consulting
5. Conducted research to ensure projects adequately address all relative requirements and regulations
6. Prepared and assisted in the preparation of AutoCAD drawings for remedial design and land
development projects
7. Utilized HEC-RAS to analyze stream f low characteristics and to design a temporary culvert stream
crossing
8. Prepared and edited reports and permit documents
9. Performed oversight of field operations including drilling and soil sampling
10. Performed hydrology calculations for remedial design and land development projects in order to size
stormwater management appurtenances
11. Performed construction cost estimating and quantity takeoffs for remedial design and land
development projects
12. Performed pavement design calculations for multiple bulk distribution and warehouse facilities
P r ima ry R esponsibilities:
Staff Engineer responsible for the following:
13. Civil Engineering support for remedial design and land development projects
14. Research support for remedial design and land development projects
15. AutoCAD drawings and analysis
16. HEC-RAS analysis
17. Preparation and editing of reports and permit documents
18. Field oversight
19. Hydrology calculations
20. Construction cost estimating
21. Quantity takeoffs
22. Pavement design
M ichael S. Rebellino, Page 3
Staff Engineer
Former Manufactured Gas Plant (MGP): P rovided remedial design support to senior engineer for the
remediation of r iver sediments contaminated with polycyclic aromatic hydrocarbons (PAHs) and metals. Prepared
A utoCAD drawings including design revisions and drawings required for Notice of Intent (NOI) report. Provided
research support. Performed construction cost estimating. Completed hydrology calculations. Performed HEC-
RAS analysis to evaluate current stream f low characteristics and to subsequently design a temporary culvert
Role
Representative P rojects
P roject
Location
stream crossing. Prepared Design Calculations Binder. Edited NOI and Completion Report. Contributed to the
p reparation of Bid Package.
MA
Staff Engineer
Former MGP: P rovided remedial design support to senior engineer for remediation of subsurface soil
contaminated with non-aqueous phase liquid (NAPL); PAHs; and benzene, toluene, ethylbenzene, and xylenes
(BTEX). Prepared AutoCAD drawings including design revisions. Provided research support. Prepared or assisted
i n the preparation of the Erosion and Sediment Control Plan, Stormwater Pollution Prevention Plan,
Construction Contingency Plan, Quality Assurance Project Plan, and Citizen Participation Plan. Prepared
quantity takeoffs. Performed field oversight of drilling and soil sampling activities. Prepared Laboratory Work
O rders for soil samples. Contributed to preparation of Bid Package.
NY
Staff Engineer
P roperty Development of 11-lot Single-family Home Subdivision: P repared AutoCAD drawings including
single-family home layout, overall grading plan, roadway layout, piping network layout, and overall site plan.
Performed quantity takeoffs.
PA
Staff Engineer
P roperty Development of Self-Storage Facility Expansion: P repared conceptual grading and site plan for
p roposed layout of storage facility expansion. Performed quantity takeoffs and construction cost estimating.
PA
Staff Engineer
Test Pad Evaluation: A n exposed geomembrane liner was implemented as part of a final closure system at a fly
ash impoundment site. Performed site investigation and oversight of test pad evaluation.
WV
Staff Engineer
Former Wood T reating Facility: P repared Corrective Measures Implementation Work Plan (CMI-WP) for the
closure/remediation with controls planned for the site. Prepared design drawings to accompany CMI-WP and
a ttached Soil Management Plan, including Site Location Map, Existing Conditions, and Proposed Soil Cover
P lacement drawings.
TX
Staff Engineer
Bulk Distribution/Warehouse Facilities Pavement Design: Performed pavement design calculations for
replacement of asphaltic concrete pavements at multiple bulk distribution/warehouse facilities.
MD