JOHN KUCHARSKI
Phone: 406-***-**** Email: ***********@*****.***
P R O J E C T S U P E R I N T E N D E N T
Date:
Dear Operations Manager,
I am exploring employment opportunities with your company and believe you will find my over 20 years of experience as
a Corporate/Industrial project superintendent, estimator, and master carpenter from a trade background. Specifically, I can
bring you highly developed talents troubleshooting and management projects valued at $50 Million USD. As a hands-on
team builder with solid leadership skills, I am certain I would make a valuable contribution to your company’s goals.
Previous Accomplishments Include:
Provided project management & coordination on diverse construction projects .
Handled construction drawings; ensured all documents accurately adhered to.
Managed up to 60 staff; provided training, development and co-ordination of these Disciplines : building
U.G. Utilities-Vaults-Manholes/Transitions, Deep Foundations, Augered Piling, Poured-in-place Structures
w/Foremost Forming Systems, Framing, Timber w/Mortise Joint, Structural steel w/Frame In-fill, Tube/Girt
System & Siding, Masonry Block w/Glu-Lam, aquatic parks, utilized on various projects.
Handled all purchasing and inventory responsibilities, for self-performed tasks.
Liaised with clients; gauged client needs; relayed information to construction team; ensured client
satisfaction with completed project.
Saved $(250,000.00) on major project, through proper resource coordination and
workflow streamlining techniques, and attention to detail.
My main focus is always on brainstorming and implementing innovative ideas. I am able to help streamline workflow to
maximize results while cutting significant budget costs. I am a dedicated employee that is always looking for methods to
increase productivity and efficiency, and I pride myself in an exceptional work ethic.
I look forward to the opportunity to speak with you in-person to discuss the “Fit” I may be for the needs of your
companies work-load; Thank you for your time and consideration.
Sincerely,
John Kurcharski
Enclosed Resume (2 pages)
JOHN KUCHARSKI
Phone: 406-***-**** Email: ***********@*****.***
P R O J E C T S U P E R I N T E N D E N T
High-caliber, skilled project management/superintendent professional, offering current knowledge of innovative
construction engineering techniques. An exceptional ability to foresee construction complications, quickly troubleshoot
problems and provide effective solutions and methods to ensure best use of company resources. A record of saving up to
$250,000 on major project through expert use of workflow streamlining methods. Exhibits hands-on positive leadership
and the ability to complete tasks on-time or ahead of schedule while meeting all specifications. Thrives in personnel
management; able to extract best performances from all staff. Project management experience supplemented by many
years of experience as a Project Manager/Superintendent /Estimator/Carpenter. Offering a comprehensive understanding of
construction industry coupled with superior leadership abilities.
P R O F E S S I O N A L E X P E R I E N C E Heavy Concrete
Swank Enterprise, Kalispell, Mt. / 6.3 yrs.
Project Superintendent 2001
Columbia Falls Waste & Water Treatment Plant, Columbia Fall, MT
Oversaw the addition and remodel of the plant. Project included building 2 Digesters, a Grit Removal Storage Building, a
Dissolved Air Flotation Tank; retro fitting the Air Blower system, rebuilding the Sludge Basin, retro-fitting the Aeration
Basins, retro-fitting the Chlorination Room. Modified and improved Control rooms in addition extensive underground
utility and power work, associated embeds, handrails and support structures.
• Managed team of 10- 20+ staff; ensured all staff able to efficiently and accurately complete tasks.
• Saved $ 300,000.00 for the contractor on major addition project; found innovative ways to successfully complete
project while working closely with mechanical and electrical Contractors.
• Liaised with officials; ensured all documents and permits in place for projects.
• Dealt with the time constraints utility lines that had to be turned over by a specific time.
Completed the one year, 3 Million USD project on time and earned a 10% Profit.
Brinderson Corporation, Costa Mesa, Ca. / 3 yr.
Project Superintendent
1983-1986
Coal Fired Heating Plant, Great Falls, MT.
Oversaw the construction of the 3 year, 33 Million USD project. Converted 68 buildings on base to low temperature hot
water system.
• Supervised all the civil/concrete trades and crane operators, augured piling, reinforcing steel, concrete formwork,
placement, surveying/ control, compaction/ density testing for all structural foundation
• Interfaced with Mechanical, Piping and electrical subcontractors with foundation’s progress.
• Interfaced with subcontractors and participated in weekly meetings, with architectural applications to Roof.
• In charge of 25 -57 workers.
• Assured all safety procedures were being followed at all times.
Project was completed on schedule and achieved more than 10% (expected) profit .
Completed concurrently during contract work, an additional $ 5,000,000.00 in U.G. Utility + Foundation work
on the Air Force Base.
Brinderson Corporation, Costa Mesa, Ca. / 2 yr.
General Foreman
1981-1983
Encina Waste Water Treatment Plant, Carlbad, CA
In charge of guiding the 2 Year, 31 Million USD project from start to finish. Project included inserting over 1000 imbeds
in Heavy reinforced concrete buildings, constructing a Digester, Carbon Towers, Grit Removal building, two Dissolved
Air Flotation Tanks, and Sludge Dewatering Building along with multiple manholes, vaults and U.G. effluent transitions.
Project’s success promoted me to the next project- “Coal Fired Heating Plant”.
Project earned more than 10% ( expected) Profit.
Completed the project before schedule and under budget!
Earlier Projects
• Swank Enterprise, Kalispell, Mt. / 6.3 yrs.
• Project Superintendent
• Kalispell Regional Medical Center, Kalispell, Mt.
2000 Consisted of a Structural Mezzanine/ Structural Steel + Reinforced Structural Concrete Deck for Cardio Work.
Budget: $ 100,000.00 Time: 4 Months Results: Completed on time and within budget.
•
• Swank Enterprise
• Project Superintendent
• Bigfork Post Office, Bigfork, Mt.
1997
Consisted of 16,000 Sq.ft. structural foundation, structural steel frame, wood and timber in-fill, divisions 1-16 with all
associated architectural applications, Site development and parking.
Budget: $ 1,100,000.00 Time: 13 months Results: Completed on time, and for expected profit
• Douglas Barnhardt, San Diego, Ca. / 2 yrs.
• General Foreman
• Thurgood Marshall Middle School, Poway, Ca.
1996
Built three 12,000 Sq.Ft. school Buildings., gymnasium, racquet courts, structural spread footings, grade beams, moment
frames, structural slabs, structural steel bolt templates, structural steel frame, and wood frame in-fill, with divisions 1-16
Budget: $50,000,000.00 Time: 1.5 year Results: finished on time, and met budget
JOHN KUCHARSKI
Phone: 406-***-**** Email: ***********@*****.***
P R O J E C T S U P E R I N T E N D E N T Summary of Projects
Howard Building Corp. / Los Angeles, CA. / 2.3 yrs. 2010
- 2012
Project Superintendent
Clarient/GE, Aliso Viejo, Ca. 2012
Cibola System, Orange, Ca. 2010- 2011
Swan Valley Log Homes / Somers, Mt. / 6 yrs. 2004 –
2009
Designer / Builder
Luxury Log Homes, Somers, MT. 2003-2009
Swank Enterprise / Kalispell, Mt. / 6.3 yrs. 1997 –
2003
Project Superintendent
Kalispell Aquatic Park, Kalispell, MT. 2003
Kandahar Lodge, Whitefish, MT. 2002
W.W. Treatment Plant, Columbia Falls, MT. 2001
• Flathead Travel Service, Kalispell, MT. 2000
Summit Athletic Facility, Kalispell MT. 2000
Ironhorse Resort, Whitefish, MT. 1999
Carquest, Kalispell, MT. 1998
Big Fork Post Office, Big Fork, MT. 1997
Douglas Barnhardt Constr. Co. / San Diego, Ca. / 2 yrs. 1995 -
1996
General Foreman
Thurgood Marshall Middle School, Poway, CA. 1996
Carlsbad High School, Carlsbad, CA. 1995
Kitchell Contractors Inc. / Irvine, Ca. / 4 yrs. 1981, 1988 / 1992 –
1994
Project Superintendent
Bakerfield Memorial Hospital, Bakerfields, CA. 1994
Scripps Psychiatric Ward, La Jolla, CA. 1993
Devereaux Foundation, Santa Barbara, CA. 1992
Anechoic Chamber, Torrance, CA. 1988
• Betty Ford CDRH-Hospital La Jolla, CA. 1981
JK Palmer Constr. Corp./ San Marcos, Ca. / 2 yrs. 1989 -
1991
Project Manager / President / Gen. Contractor
• 38 Unit Hud Project, San Diego, Ca. 1991
• Imperial School District Gymnasium, Imperial, CA. 1990
• Palomar College Computer Campus, San Marcos, Ca. 1989
Brinderson Corp. / Costa Mesa, Ca. / 5.5 yrs. 1981 – 1986,
1991
Project Superintendent
Anheuser Busch, Van Nuys, CA. 1991
Steam Heating Plant, Bremerton, WA. 1986
Coal Fired Heating Plants, Great Falls, MT. 1983-1986 (most successful)
Encina Waste Water Treatment Plant, Carlsbad, CA. 1981-1983
Kucharski Constr. Co. / Vista, Ca. / 2 yrs. 1979
– 1981
Project Manager / Owner / Gen. Contractor
• 38 Condeminiums, San Diego, Ca. 1981
• Shipke Residence, Carlsbad, Ca. 1980
• Egg Processing Plant, Lakeside, Ca. 1979
Trepte Constr. Co. / San Diego, Ca. / 1 yr.
1978
Journeyman Carpenter
Camp Pendleton Barracks, Camp Pendleton, CA. 1978
Bechtel Power Corp. / San Francisco, Ca. / 1 yr.
1977
Journeyman Carpenter
• San Onofre Nuclear Power Plant, San Clemente, CA. 1977
E. M. Penn Co. / Los Angeles, Ca. / 1 yr.
1976
Apprentice Carpenter
• Dixon Lake Water Treatment Plant, Escondido, CA. 1976
Century Southwest Constr. Co. / Van Nuys, Ca. / 1 yr.
1975
Apprentice Carpenter
• Multi- Apartment Complex, Oceanside, Ca. 1975
Magna Construction Co. / Carlsbad, Ca. / 2 yrs. 1973 -
1974
Apprentice Carpenter
• Built many track Homes in San Diego county for 2 yrs. 1974 – 1973
• Beginning of Construction Career
JOHN KUCHARSKI
CON’T Phone: 406-***-**** Email: ***********@*****.***
S U P E R I O R S T R E N G T H S
Monitoring Safety Site Project Management Sub-Trade Coordination
Sage/Timberline Estimating Blueprint Interpretation
• Site Communication
Carpentry ( All Phases ) Geometric/ Engineering/Principles Budget Management
Troubleshooting and Problem Solving Materials Mgmt. & Quantification Cost Reduction
U.G. Pipe Placement & Density Tests Cost Estimates & Sub-Quotes Workflow Streamlining
Structural Frames & Suspended Deck Team Building & Motivation
Deep Foundation, Vaults and Select Auger Piling
Fill
F O R M A L E D U C A T I O N
Journeyman of Apprenticeship – Carpentry Vocational Drafting Degree
Palomar College- San Marcos, CA. Mira Costa College- Oceanside, CA.
Sage/Timberline Estimating
Lake Tahoe, Ca.
P R O F E S S I O N A L D E V E L O P M E N T & C E R T I F I C AT I O N S
COURSES TICKETS
Safety Management Course Journeyman Carpenter Certified
Construction Safety Training Systems Course Confined Space and Respiratory Protection
Power Actuated Tools Safety Course 2012
Carpentry Form-setting, Framing, Timber, Truss, Finishes Aerial Work Platform Ground
Interpersonal Relations Course Heavy Construction Safety
Leadership Management
References :
1) Howard Building - Frank Treptow - 818-***-****
2) Studio SA - David Oh - 714-***-****
3) Swank Enterprises- Bob Meinhardt – 406-***-****
4) Cibola Systems - Benjamin Djou - 714-***-****