RONALD DUGAN
Kempton, PA *****
Phone: 610-***-****
Mobile: 610-***-****
OBJECTIVE
To obtain a position within a company that will allow me to use my past experience, training,
and education to further the company’s ongoing success.
SUMMARY
Results-oriented Heavy/Highway Construction Estimator/Project Manager with proven ability to
facilitate success of complex multimillion-dollar construction project through the entire project
life-cycle. Extensive experience in effectively managing contracts with design, engineering
firms, subcontractors, and vendors. Skilled at executing additional revenue from PennDOT that
was not anticipated at contract acquisition. Recognized for attention to detail, organization skills,
and introducing different perspective to reducing operational costs.
TECHNICAL SKILLS
• MS Office - Excel, Word, Power Point, Outlook
• Primerva P6 and Microsoft Project Scheduling Software
• JD Edwards, HeavyBid, HeavyJob, and OnBase invoice tracking
• Construction Drawings and Specifications
• Construction Contract Documents
• AGTek Takeoff Software
• Basic Knowledge of Carlson Survey Software
PROFESSIONAL EXPERIENCE
HRI, Incorporated, Williamsport, PA 2007 – December 2012
Estimator/Project Manager
• Responsible for obtaining and managing an annual budget of 15 million dollars of
construction projects.
• Development of bid documents, review of contractor’s proposals, authoring of contract
scope of work, and negotiation.
• Scheduling: Responsible for preparing all Critical Path Network construction schedules.
• Meet with management staff to determine project needs and scope of work.
• Lead and participate in all aspects of construction with project area manager, project
superintendents, and foreman.
• Procurement and purchased all materials.
• Identified potential problems, took corrective action, and notified the proper level of
authority.
• Prepared documentation including all contract related correspondence.
• Negotiated and prepared all change order estimates.
• Responsible for conducting feasible cost-benefit studies and quantitative risk assessments
for growth into districts outside of our current operating areas.
• Implemented plans for the sustainable regeneration of revenue in areas outside of current
operations in order to ensure the company’s economic growth.
• Developed and implemented sustainable techniques for constructing all aspects of bridge
construction which reduced operational costs.
• Responsible for generating all sub-contracts and purchase orders for each project.
United Steel Workers Union, Wilkes-Barre, PA 2004 – 2007
Ahern & Associates, Inc., South Charleston WV 2006 – 2007
Project Site Superintendent
• Manage projects ranging from 500 thousand to 6 million.
• Coordination, cost tracking, and task scheduling of subcontractors. Perform monthly
review of subcontractor requisitions for actual work in place.
• Manage 2 to 4 foreman.
• Scheduling of subcontractors, labor, equipment, and materials.
• Meet with Project Managers and General Superintendent to determine project needs and
scope of work.
• Interface with the owner of the project and coordinate weekly status meetings to discuss
progress, risks, design changes, and problem resolution.
• Coordinate with corporate safety manager to ensure compliance of federal (OSHA), state,
and local safety regulations.
• Ensure that each project is scheduled accordingly in order to complete the project on time
and within budget.
• Oversee all daily activities of construction.
No.1 Contracting, Ashley, PA, 2004 – 2006
Foreman
• Managed 7 to 10 individuals in the construction of 4 multi-span bridges and
approximately 3 miles of a new 4 lane highway.
• Responsible for scheduling labor, equipment, and materials.
• Meet with the owner on a bi-weekly basis to discuss the progress of the projects and
determine any risks that may be forth coming.
• Complete all documentation associated with the construction of the project.
• Complete all phases of construction on time and within budget.
Barletta Materials & Construction Company, Hazelton, PA, 1995 – 2004
Foreman
• Began as a general labor, worked my way up the ladder and became a night shift
foreman.
• Managed 7 to 10 individuals on a 750,000 CY rock cut project.
• Was responsible for leading a crew of 5 individuals for the re-construction of all concrete
items and the installation of storm water pipe and inlets for approximately 4 miles of a 4
lane highway.
• Assisted in all aspects of roadway construction work.
EDUCATATION
Villanova University, Villanova, PA 2007 – 2008
Project Management
Kaplan University, Chicago, IL 2004 – 2006
Business Management
Lehigh Carbon Community College, Allentown, PA 2000 – 2001
Business Management
REFRENCES
Jack Walsh (Highway Construction Superintendent)
6 Buckingham Heights
Moscow, PA 18441
Phone: 570-***-****
Timothy Waldman (Heavy/Highway Construction Manager)
3485 West Fourth Street
Williamsport, PA 17701
Phone: 570-***-****
John Thomas (General Construction Manager)
1314 East Broad St.
Tamaqua, PA 18252
Phone: 570-***-****