Denver, Co & So. California Regions 303-***-**** *********@*****.***

PRIMAVERA P6 SCHEDULER

SPECIALIZING IN CONSTRUCTION SCHEDULING, PROJECT PLANNING & COST CONTROL

ROFESSIONAL EXPERIENCE

P

P ASSION INTEGRITY C OMMITMENT

20 years’ experience in field construction; Military, Tennant Improvements, commercial, civil, plants, & residential.

14 years’ experience in IT network construction, network / technical support and system designs.

10 years’ experience in facility management; including sports venues, gyms, and office buildings.

10 years’ experience in field/project engineering; i.e. RFI, RFP, RFQ, PO, CO, logistics, document management.

9 years’ experience in scheduling, project planning and cost control.

8 years’ experience in project management/coordination includes system lifecycles, PMI: PMBOK, managing teams, writing scopes,

budgeting, estimating, and scheduling and contract management.

Experienced with the following software packages; MS Server 2008, Exchange 2010, Project 2003/2010, Visio 2010, Office 2003/2010,

Primavera P3, P5, P6, Contract Manager, AutoCAD, and adobe design packages.

CHEDULING / PROJECT PLANNING SUMMARY

S

Software Packages Analysis

Primavera P6, v7.0 & 8.2 Software – Expert Budget Analysis, Earned Value, CPI, SPI

MS Project 10 Intermediate Resource Analysis

Schedule Date Analysis

Critical Path & Multi Path Scheduling

Techniques

Special & Standard Reporting

CPM Scheduling

WBS Structure & Coding

Construction Applications

Activity Coding

Electrical

Cost Loading & Bucket Planning

Process Plant

Calender Management

WTP / WWTP

Advance Roles and Resource Assignments

Tennant Improvements

Resource Levelling

Information Technology Design

Multiple Project Management

Logic Diagrams

ROFESSIONAL EXPERIENCE

P

• Ludvik Electric Corporate Scheduler Dec 12 Present

• Mile High Youth Corps Manager of IT and Operations Apr 10 – Nov 12

• Summers Consulting IT Construction Project Manager Jan 09 – Apr 10

• Conception to Reality Construction Scheduler Oct 06 – Jan 09

• United Water Works Inc Project Manager / Scheduler Jun 05– Oct 06

• WSCI Inc. Project Engineer Jun 04 – Jun 05

• Aramark S&E Facility Services General Manager Jun 02 – Jun 04

• Engineered Ideas IT / Construction Contractor Feb 98 – Jun 02

ILITARY SUMMARY

M

• National Guard/Army Reserves SF/MP/ Army Corps of Engineering Mar 02 – Sept 12

• USMC Active/Reserves Engineer / Air Operations Feb 94 – Feb 02

EDUCATION AND DEVELOPMENT

• P6 – Advanced Certification, Monks Associates 2013

• P6 – Beginner Certification, Monks Associates 2013

• CPR / AED / 1st aid Certification, Emergency First Responder, Recertified 2012

• Construction Management Certification; Colorado State University, 2005

• B.A. in Industry Operations and Economics; Metro State College of Denver, 2004

ETAILED EXPERIENCE

D

Employer: Ludvik Electric, Lakewood, CO Dec 12 – Pres.

Role / Environment: Corporate Scheduler / Office & Field (Construction Sites).

• Used P6 to schedule electrical projects with values up to 150 million.

• Managed up to 20 projects w/multiple schedules at a time.

• Created new layouts and templates to improve efficiency.

• Complete schedule analysis for the legal team and various project management teams.

• Worked with partners and contractors on P6 schedules.

• Redesigned scheduling training materials.

• Organized and archived the P6 database.

• Trained fellow employees in scheduling process and best practices.

• Standard Scheduling Tasks;

o Created “what if” proposal schedules for estimating.

o Created “what if” man loading schedules for estimating.

o Created new baseline schedules w/ WBS that are cost and resource loaded.

o Tracked BL schedules and made sure the projects were on schedule, if not I let the PM know and created alternate

paths to ensure they stayed on track.

o Coded schedules for sorting and filter operations.

o Compared multiple schedules.

o Daily schedule analysis using, AOE charts, Gantt charts, and CPM tracking.

o Used reflection schedules to update schedules and implement changes.

o Created weekly, 3 week look ahead and monthly billing update schedules & reports.

o Documented all schedule deviations in the widow logs.

• Standard Analysis;

o Multi – Schedule Activity tracking.

o Schedule Date Analysis; to meet deliverables.

o Resource Analysis; Over allocation, inappropriate allocation and time durations.

o Budget Analysis; Cost control.

Employer: Mile High Youth Corps, Denver, CO Apr 10 – Oct 12

Role/Environment: Manager of Information Technology & Facility Operation / Office & Field (Project Sites)

• Promoted from project coordinator to project manager on Jan 2012.

• Responsible for project scope, schedule and budge on all projects.

• Over the past 2.5 years I managed the following projects from start to finish using PMP and SDLC techniques.

o Project 1: Assisted in the remodel of the MHYC HQ Building.

o Project 2: Created and developed multi site maintenance schedules.

o Project 3: Added 4 smart classrooms to the MHYC HQ building.

Project 4: Designed and Installed IT networks for Bryant St, Canosa Ct, HQ and Colorado Spgs locations.

o

Project 5: Upgraded from 3 to 6 servers during the server expansion & installation project.

o

Project 6: Developed the online wxWired program & wireless netbook system for the energy project team.

o

Project 7: Expanded the MHYC computer assets from 60 to 150 computers.

o

• Used standard scheduling techniques such as critical path method (CPM), program evaluation review technique (PERT) and

critical chain methods.

• Produced the following documentation for presentations; Gantt charts, activity on arrow (AOA) charts, activity on node

(AON) charts, progress graphs, excel and power point.

• Other relevant tasks;

o Designed a new vehicle maintenance program that increased checks and identified issues faster.

o Coordinates maintenance of physical plant and personal property at four locations.

o Resolved information technology, maintenance, vehicle, and other operation issues & requests.

o Coordinated the contractual services with vendors related to operation duties.

o Managed facility logistics and procurement, distribution and inventory control.

o Maintained accurate and timely inventory records and assist with inventory reconciliations.

o Coordinated the contractual services with vendors related to operation duties.

o Managed the safety of facilities including maintenance of alarm system, key schedules, assignment of

opening/closing duties, and periodic checks.

Employer: BridgeView IT (1099 contract), Lakewood, CO Jan 09 – Apr 10

Role/Environment: Consultant : Desktop support, inventory management / Office Setting.

• Responsible for Desktop support and inventory management.

Employer: Conception to Reality, Denver, CO Oct 06 – Jan 09

Role/Environment: Master Scheduler & Cost Control Specialist / Office & Field (Production Plants)

• Wrote master schedules for over 50 construction projects and assisted with all PM documentation.

• Utilized Primavera contract manager / P5 Software for building master schedules and logging scopes of work.

• Integrated all schedules and relevant information into contract manger.

• Applied cost control principles, work breakdown structure designs (Critical Path, Critical Chain, program evaluation review

technique PERT), and proper resource management to create realistic and cost effective schedules.

• Produced the following documentation for presentations; Gantt charts, activity on node (AON) charts, progress graphs, excel

and power point then gave presentations to the project managers on their schedules.

• Converted MS Project schedules to Primavera format for scheduling then reformatted them back for the vendors.

• As an owner representative for Pepsi accounts I worked on plant construction projects and research projects that related

directly to the development of new Pepsi products. Projects were valued from $50,000 – $50,000,000.

• As an R&D project manager I researched data, created budgets, wrote proposals, coordinated resources, field tested products,

and made recommendations.

• Worked with other project managers on retrofitting production lines and new plant construction.

• Assisted project engineers on their projects.

• Wrote RFI, RFQ and RFP, PO, CO, schedules and estimates for projects.

Employer: United Water Works, Denver, CO Jun 05 – Oct 06

Role / Environment: District Project Manager and Scheduler / Office & Field (Construction Sites).

• Recruited by United Water Works to be their regional manager for their new Colorado branch.

• Utilized Primavera and MS Software for building master schedules and logging scopes of work.

• I researched potential projects, requested specification books and other required bid information from government agencies

and project owners. Responsible for creating project scope, schedules, estimates and budget.

• Used the materials to developed bids using economic and negotiation techniques for potential projects then submitted the

completed bid packages and supporting documentation.

• Performed facility maintenance and coordinated with vendors on maintenance that was beyond my scope.

• Managed the buildings safety and security.

• Built the IT infrastructure and maintained the IT equipment.

Employer: Western Summit Constructor Inc., Denver, CO, Jun 04 – Jun 05

Role / Environment: Project Field Engineer / Office & Field (Construction Sites).

• Served as a project engineer for the Southwest Branch on the Fort Bliss WTP project.

• Used Primavera P3 to schedule, resource monitor, identify potential cost overruns, and re forecasting.

• Used Primavera Expedition to generate and track RFI’s, RFP’s, RFQ’s, purchase orders, change orders, submittals, back

charges, log drawings, and log daily weekly reports.

• Used P3 and Expedition, AutoCAD, and MS office 2003, to generate reports and forms.

• Transformed the forms in presentation format and then presented them to the team using power point.

• Wrote project scope for specific categories within construction projects.

• Interpreted prints & CAD drawings to complete quantitative take offs and estimates on materials.

• Reviewed the vendors and subcontractors submittals to ensure they met project specifications.

• Compiled project bid books and site books.

Employer: Aramark Sports & Entertainment, Denver, CO & Los Angeles, CA Jun 02 – Jun 04

Role / Environment: Facility Service General Manager / Stadium & Sports Venues.

• Worked as an intern then was promoted to General Manager of Facility Services seven months later.

• Sites included; Staples Center, Carson’s Olympic Training Center, Denver Coliseum & Red Rocks Park.

• Oversaw the logistics & supply chain including; purchasing, inventorying, issuing and reconciliations.

• Managed the staff by hiring, developing and training operations and management team members.

• Trained employees on safety and documented all “Safety Tool Kit “training sessions.

• IT System and Desktop Administration for local area.

• Conducted QA inspected the work of the employees and subcontractors.

• Scheduled daily operations, special projects that involved up to 200 union employees.

• Worked with and negotiated with the union on all grievances and contract disputes.

• Wrote proposals for work, and negotiated the terms and payment options.

• Generated sales by obtaining extra contracts with the LA Kings, LA Clippers and the X Games.

ILITARY EXPERIENCE

M

Employer: US Army Reserves, St. Louis, MO Sept 09 – Sept 12

Role / Environment: Army Corps of Engineering: Construction Engineer / Field Training & Prep

• Used systems development life cycle (SDLC) principles in decision making process.

• Used field engineering skills to read and interprets drawings, plans and specifications.

• Assisted in sawmill set up and operations.

• Performed millwright duties as the head saw operator.

• Used basic carpentry skills in building layouts, fabrication, framing, sheathing and roofing.

• Applied proper concrete curing methods.

• Installs flooring, walls, partitions, siding, roofing, doors, windows, stairs, and interior finishing.

• Repaired and renovated all types of structures and erects prefabricated buildings.

• Assisted in performance of combat engineer missions.

Employer: National Guard Reserves, Centennial, CO Mar 09 – Sept 09

Role / Environment: Military Police: Team Member / Field Training & Prep

• Military police training; Enforced military laws and regulations, controlled traffic and responding to emergencies.

• Theatre Internment Facility (TIF) training; Conducted area security, internment/resettlement manoeuvres, POW management,

and command mobility support.

Employer: National Guard Reserves, Centennial, CO Mar 02 – Mar 05

Role / Environment: Special Forces: Selection Training Det. / Field Training & Prep

• High paced/high stress field training in prep for selection and training school.

Employer: USMC Reserves, Denver, Co Feb 98 – Feb 02

Role / Environment: ROTC Training Det. Team Leader / Field and classroom training experiences.

• Trained with ROTC Units at the Colorado School of Mines and University of Colorado.

• Leadership development of younger ROTC students.

• Taught fellow students on military procedures and operations based on past experience.

Employer: USMC Active Duty, Okinawa, JPN / Beaufort, SC Feb 94 – Feb 98

Role / Environment: Airfield Construction & Operations Specialist / Office & Field

• Construction field superintendent on over 20 field projects; my duties included managed the lighting section, conducting site

surveys, lay out, installation and field maintenance operations.

• Design expeditionary AM 2 airfield facilities, provide field marker light (FML) systems for Marine Expeditionary Units

(MEUs), and conducted tactical/assault landing zone assessment surveys.

• As the airfield operations NCO I coordinated over 3600 sorties when they touched down on our airbase; coordination

included, field maintenance, aircraft parking, re fuelling, loading, and other logistics.

• Managed the Q/A logs and records section ensuring all maintenance for equipment was completed then logged correctly.

• Supervised the tool control program, made sure no tools were lost and everything was calibrated correctly.

• As a technician I employed, installed, operated, inspected, and repaired expeditionary airfield (EAF) systems. This included

arresting gear, visual landing aids, airfield AM 2 matting and accessories, EAF communications and airfield lighting and

marking systems.

• Operated, inspected, and maintained emergency arresting gear systems for high performance Naval and Marine Corps Tail

Hook aircraft.

• Worked on small gas and diesel retrieval system engines.



Contact this candidate