OSCAR HERRERA-TELLEZ
**********@*****.***
EXPERIENCE SUMMARY
Self-Motivated, diligent professional with full bilingual capabilities
(English/Spanish), with more than 30 years of progressive experience in the
construction arena holding high responsibility positions that include
Program Manager, Project Manager, Principal Engineer, Field Superintendent,
Construction Supervisor and Procurement Officer for projects amounting up
to 4 Billion US dollars that included country wide programs/projects in the
US, Mexico Central and South America. Construction projects include Mine
Infrastructure, Roads, Bridges, Water and Waste Water Treatment Plants,
Dams, Pipelines, Landfills, Aqueducts, Residential Housing, etc.
Knowledgeable and highly experienced in international procurement, long
term strategic planning, Quality Assurance/Quality Control, scheduling and
budget/disbursement management. Understanding of EPA environmental
regulations and international environmental guidelines that adds value to
construction management by making sure environmental obligations is
observed and environmental liability is reduced. Participated in numerous
World Bank, Inter-American Development Bank and North American Development
Bank projects.
EXPERTISE
. Excellent communication skills; able to interact with people of
diverse backgrounds and nationalities.
. Review final designs to determine project budgets, needs and
constrains.
. Prepare and actively manage project budgets and schedules.
. Ability to read and understand construction and environmental specs
and drawings.
. Review designs at 30%, 60% and 100%
. Handle entire project submittal process with
owners/architects/engineers.
. QA/QC on design and implementation.
. Review monthly payment applications.
. Validate Change Orders.
. Coordinate with Project Superintendents.
. Communicate with all stakeholders including contractors
EDUCATION
. University of Texas at El Paso / BS, Civil Engineering (1976)
. Universidad Iberoamericana / BS, Civil Engineering (1979)
CONTINUING EDUCATION
. PMP Candidate.
. Primavera (NAD Bank, San Antonio TX)
. Design of Waste Water Treatment Plants (UT Arlington)
. Utility Management Institute Modules (UIW /San Antonio, TX)
. Unit Prices and Project Management of Civil Works, Primavera Version
(An lisis de Precios Unitarios / Mexico)
. Vadose Zone Hydrology (Texas A&M)
. Unit Prices, man/hour and Materials (Costos y Presupuestos by
Peimbert, Mexico)
. Civil Engineering Project Status (PRISMA software, Mexico)
. Unit Prices and Estimates (PRISMA Software, M xico)
. Concrete for Foundations in Marsh Areas, (Instituto Mexicano del
Concreto)
. Rolled Concrete for Pavements, (Instituto Mexicano del Concreto)
. Construction Supervision (LULO Software, Venezuela)
. Lion Technology Inc. (Environmental Remediation Workshop)
LANGUAGES
Spanish, English (Read, speak and write).
PROFESSIONAL EXPERIENCE
07/09 to date.
GES International (Houston, TX), EGC, Inc. / ENTRY Envirosphere
Geochemistry (San Antonio, TX).
Senior Engineer/Consultant/Manager
Review of engineering plans and specifications for construction,
restoration, and environmental compliance. Conduct engineering oversight of
remediation projects. Formulated environmental policy, conducted
environmental audits, and developed plans of action to prevent and correct
environmental compliance deficiencies and violations. Provide contracting
support that includes scope of work development, costing, technical
specifications, etc. Projects have been mainly international in nature in
several countries that include Guatemala, Honduras and Dominican Republic.
Assigned full time to specific projects that include an assignment as a
Principal Engineer for Construction Quality Assurance/Quality Control and
Field Verification Engineering at the Pascua-Lama Mine in Argentina. Mine
Infrastructure Construction work was estimated in 4 Billion US. The
following activities were performed:
. Supervise construction activities performed simultaneously by several
construction companies
. Monitor and manage overall project schedule
. Material Selection including pipes for pipeline construction
. Soil Mechanics tests
. Construction equipment requirements
. Test Protocols
. Installation of HDPE Pipe 36" and 40"
9/99 -6/09
North American Development Bank (San Antonio, TX). Project Manager /
Technical Officer.
Played an instrumental role in the implementation of numerous
infrastructure projects that included the successfully management of
Design/Construction programs of up to 300 Million US. Participation
included:
. Final Design reviews,
. Value Engineering,
. Procurement,
. Construction Supervision,
. Change Orders,
. Close out Documents, and one year review.
Diversity of projects included:
. Water and Wastewater Treatment Plants,
. Water Tanks, Sewer lines, Lift Stations, Water Mains,
. Landfills,
. Roads,
. Evaluation of reconstruction cost and reconstruction schedule in
response to natural disaster events like tornados and flooding.
Sub-tasks included:
o Construction/earth movement. Supervised and managed millions of
cubic meters,
o Placement of more than 1.5 Million m2 of Geomembranes,
o Installation of more than 600 km of Pipelines
7/98 - 9/99
Geo- Beazer Homes "Oasis Ranch" (El Paso, Texas). Field Supervisor.
Construction of 97 Duplex Homes.
2/97 - 6/98
ENTRY Envirosphere Geochemistry (El Paso, TX). / Constructora Romurachi
S.A. (Ciudad Ju rez, Chih.) Senior Engineer.
Construction of Vertical apartments (12 buildings) FOVISSTE Chamizal
(Juarez, Chih.)
6/95 - 9/96
DELCAN INTERNATIONAL CORPORATION (Toronto, Canada / Venezuela)
UNITED NATIONS- Program United Nations for the Development (PNUD).
Consultant/ Manager and Supervisor.
Provided Construction Supervision/Management/Procurement and technology
transfer to the Ministry of Transportation of Venezuela and the National
Fund for Urban Transport (FONTUR). Project preparation of Bid documents for
the design and construction of Roads and Streets country-wide in accordance
with the World Bank and IADB.
6/94 - 6/95
BOOZ ALLEN & HAMILTON (McLean, Virginia / M xico DF). Project Manager and
Supervisor.
Technical Assistance to the Ministry of Social Development of M xico
(SEDESOL) on WORLD BANK "M xico Medium Cities" in Transportation and Roads
programs. The main purpose was to transfer the technology to SEDESOL, the
States and Municipalities, working as a team to support the success and
good performance of World Bank Projects embracing 149 Mexican cities.
1/1977-1994
Constructora Temozachic y Constructora Romurachic/ENTRY Envirosphere
Geochemistry (El Paso, TX (M xico D.F., Ciudad Ju rez, Chih.) Owner/Project
Manager/Principal Engineer.
Initiated and managed a successful construction and environmental business
with projects totaling 4.5 Million. Led a team of 36 professionals and
directly participated in the management and budget control of numerous
concurrent projects including field oversight.
. Directly participated in numerous construction projects including
several dams and several bridges, supermarkets, banks, shopping malls,
residential housing, hazardous waste facilities, etc. Coordination
and/or direct participation in: I) Pre-contracting Activities:
proposal preparation, staffing, scope of work, budgets, terms, and
conditions, presentations, if applicable. II) Contracting Activities:
warranty and liability, scope of services, charges and billing,
commitment, subcontracts.
. Direction and participation in multiple environmental projects and
studies including environmental impact studies, environmental audits,
environmental site assessments, water and soil surface and subsurface
contamination, hydrogeologic studies, leaking underground storage
tanks, soil gas surveys, placement of network of groundwater
monitoring wells, soil and groundwater sampling and analysis, waste
management, etc. Studies and assessments include the evaluation of
complex industrial facilities, water treatment and, landfills,
extensive contaminated areas embracing contaminated rivers, marshes,
soil and groundwater.
PUBLICATIONS
Herrera, O. 1996 Manual de Procura
a.- Procura de Bienes. Procurement of Goods
b.- Procura de Servicios.
Procurement of Services such as Consulting, Design Evaluation of Projects
etc.
c. - Procura de Obras.
PUBLICATIONS continuation
Procurement for construction of highways, roads and related structures.
FONTUR / DECLAN INTERNATIONAL CORPORATION 326p.
Herrera, O. and Ferrari, O., 1994. Manual de Ejecuci n y Control de
Calidad de Obras Viales. Manual Normativo.
Construction methods and quality control of roads, highways related
structures.
SEDESOL / BOOZ ALLEN & HAMILTON INC. 180p.
Ferrari, O., and Herrera, O., 1994. Manual de Mantenimiento de Obras
Viales.
Manual Normativo.
Maintenance of roads, highways and related structures.
SEDESOL / BOOZ ALLEN & HAMILTON INC. 100 p.
Ferrari, O., and Herrera, O., 1994. Manual de Seguimiento de Obras
Viales.
Manual Normativo.
Project Management
SEDESOL / BOOZ ALLEN & HAMILTON INC. 150 p.
Ferrari, O., and Herrera, O., 1994. Manual de Acciones Complementarias.
Manual Normativo.
Complementary Work
SEDESOL / BOOZ ALLEN & HAMILTON INC. 80p.
Herrera, O., and Ferrari, O., 1994. Catalogo de Precios Unitarios de
Obras Viales, de los Estados de Guanajuato, Zacatecas, Quintana Roo,
Coahuila, Hidalgo, Tamaulipas, Puebla, Durango, Nuevo Le n.
Unit Price for works related to highways and roads.
SEDESOL / BOOZ ALLEN & HAMILTON INC. 215 p.