CURRICULUM VITAE
SHARMA RAMESH KUMAR B CONTACT : +614********
E-mail:- ******.*****@*****.***
******.******@*********.***
OBJECTIVE:-
TO ACHIEVE EXPERTISE WHEREVERE
WORK I UNDERTAKE, THUS CONTRIBUTING MY BEST OF PROGRESS FOR WHIECH EVER
ORGNIZATION MAY I SERVE.
Professional qualification:,
DME (Diploma in Mechanical Eng),
CSWIP 3.1 Certificate No:-46729(Valid upto-2015)
Welding Inspector TWI, UK
BGAS PAINTING GRADE-2
ASNT Level - II in
RT-RADIOGRAPHY TEST
UT-ULTRASONIC TEST
MT- MAGNETIC PARTICLE TEST
PT-DRY PARTICLE TEST
Awards & Training:
. HSE Induction
. H2S Awareness & Escape
. Permit to Work System
. First Aider
PROFESSIONAL EXPERIENCE
Presently
Project: Australia Pacific LNG Pipeline Project Upstream Phase-1
Location: (Brisbane-Queensland, Australia)
Pipeline: - 36" & 42" Dia & Length 450 KM
Client : Origin Energy Aus Pty Ltd.
Contractor: Joint venture of McConnell Dowell Aus Pty Ltd+ CONSOLIDATED
CONTRACTORS COMPANY (MCJV)
Designation: WELDING INSPECTOR (MCJV)
Duration : 22 OCT 2012 TO till date
Project: SAIWAN & FARAH (SFS) OIL PIPELINE PROJECT,
Location: MUSCAT
Pipeline: - 16" & 10" Dia and Length 120 KM
Client : CONSOLIDATED CONTRACTORS ENGERY COMPANY
Contractor: CONSOLIDATED CONTRACTORS COMPANY (CCC)
Designation: WELDING INSPECTOR (CCC)
Duration : 2 Jan 2012 TO 15 Aug 2012
Project: LOW SULPHER FUEL OIL, FG AND GAS OIL PIPELINE PROJECT,
Location: (KUWAIT)
Pipeline: - 48" Dia and Length 197 KM
Client : KUWAIT OIL COMPANY (KOC)
Contractor: HEAVY ENGINEERING INDUSTRIES & SHIP BUILDING CO. (K.S.C)
Designation: WELDING INSPECTOR (HEISCO)
Duration : MARCH 21, 2011 TO DEC 20, 2011
Project: RANIGANJ DURGAPUR CBM GAS PIPELINE PROJECT
Pipeline: - 18" Dia and Length 110 KM
Client : ESSAR CONSTRUCTION (I) LTD
Contractor: NANDINI IMPEX PVT LTD.
Designation: QC INSPECTOR-WELDING (ESSAR)
Duration : 05 March, 2010 to 15 March, 2011
Responsibility:
. Conducting and Witnessing of performance qualification test.
. Fit up Inspection.
. Visual Inspection of weld.
. Preparation of test packs.
. Co - ordination of all NDT activities with NDT Sub - contractor.
. Witness all site activity like mainline welding, Tie In welding,
trenching, lowering, padding, Backfilling with client.
. Prepare all site activity Inspection plan and submit in QC Dept.
. Checking the availability of latest specification & procedure.
. Visual & Inspection of pipe joint Responsibility of NDT inspection
like DPT, MPT & UT.
. Ensure controlling of Quality Format, Procedure & Specification.
PROJECT : Ambatovy Pipe line Project,
Location :Madagascar (SOUTH AFRICA)
Pipeline : - 24" Dia and Length 117 KM
Client : SNC Lavalin Engineers & Contractors
Contractor : CCG & ESSAR Contractions
Designation : QA/QC Engg. (ESSAR)
Duration : Sep 19, 2008 to Feb 25, 2010.
1. Reviewing of QAP"s, WPS, and PQR etc.
2.
witnessing of welder qualification and WPQ as per API 1104 ASME
section IX & D1.1 and getting Concurrence from client.
3. Monitoring of calibration, verification of
instruments, tools & equipments. 4.
Assuring fit-up & quality of main line weld and tie-in weld,
5.Monitoring the AUT team for timely
inspection,
6. Review of AUT result for repair
monitoring.
7. Monitoring of weld repair team to
ensure the sound quality.
8. Review of radiograph of main line and tie-in weld,
9. Monitoring of monthly welder performance to control the
quality of the project. 10. Review the pipe book in
order to release the system for hydro testing,
11. Witnessing the cleaning and gauging for hydro
testing.
12. Review of Repair rate and arrange the training for the
welders to improve of skilled.
Project: BHARUCH JAMNAGAR PIPELINE PROJECT
Pipeline: - 30" Dia and Length 127 KM
Client : GUJRAT STATE PETRONET LIMITED
Contractor: ESSAR CONSTRUCTION LTD.
Designation: QA/QC Supervisor (ESSAR)
Duration : Sep 19, 2007 to Sep 18, 2008
. Responsibility:
Conducting and Witnessing of
Performance Qualification test.
. Co - ordination of all NDT activities with NDT Sub - contractor.
. Review all project Method Statement, Quality Control Plan.
. Checking the availability of latest specification & procedure.
. Checking the fit-up of joint and inspected all data during
welding.
. Reviewing & Selection of WPS for Welder Qualification,
Certification & to execute the job.
. Fit up Inspection.
. Witnessing of welder Qualification as per as per SEC IX.
. Visual Inspection of welds. Preparation of test packs
. Inspection of pipe and make the report.
. Selection of the NDT for weld joint.
. Major responsibility is of NDT inspection like DPT, MPT & UT of
above ground piping, underground piping & structure.
. Witnessing of the Holiday Test during pipe lowering in trench.
. Verifying the trench elevation & slop within tolerance for U/G
piping
. Checking the sand bedding & lay the piping system for
backfilling.
. Ensure controlling of Quality Format, Procedure & Specification.
. Prepare all site activity Inspection Test Plan and taking
approval from client and submit all report in QC office.
. Man power handling.
Project: JHALUNDRA CANAL PROJECT
Client : GUJRAT STATE PETRONET LIMITED
Contractor: NAGARJUNA CONSTRUCTION COMPANY (NCC)
Designation: QA/QC Supervisor (NCC)
Duration : 5 April, 2006 to JUNE 16, 2007
Company: - Spicer India Ltd, Pune (India)
Designation: - Trainee Engineer (CNC Operator)
Duration : Feb 14, 2005 to Sep 10, 2005
Responsibility:- Working As a CNC operator for Manufacturing component for
Crank Shaft for Four wheel Car.
PERSONAL DETAILS
FATHER'S NAME : BHIMSINGH B SHARMA
PASSPORT NO : G 9776568
DATE OF ISSUE : 16-07-2008
PLACE OF ISSUE : AHEMDABAD
DATE OF BIRTH : 10 - 08 - 1986
NATIONALITY : INDIAN
RELIGION : HINDU
MARITAL STATUS : UNMARRIED
Language Known : English, Hindi, Haryanvi, French
PERMANENT ADDRESS : RAILWAY POLICE LINE
15 QUARTERS
NEAR MAGHPURA
MEHSANA-384002
GUJRAT (INDIA)
CONTACT S +91-997*******
E mail id : ****************@*****.**.**
******.*****@*****.***