Post Job Free
Sign in

Senior Estimator

Location:
Lake Havasu City, AZ
Posted:
May 20, 2013

Contact this candidate

Resume:

Steven P. Miller

**** ******* ** ********,

Lake Havasu City, Az. 86406

Ph: 714-***-**** Cell 928-***-**** Home

Email: ***********@*****.***

CAREER PROFILE

AREAS OF STRENGTH AND EXPERTISE

• Preconstruction budgets

• Timeline management

• Various facets of estimating

• Multifaceted worker

• Strong work ethic • Excellent management skills

• Strategic planning & analysis

• Cross-functional skills

• Strong communication skills

• Meets deadlines consistently

• Coordinates people and project effectively • Leadership

• Project management

• Relationship building

• Handles heavy workload effectively

• Trains, mentors, and educates others

PROFESSIONAL EXPERIENCE

KEY SKILLS AND COMPETENCIES

• 35 years of hands on experience and comprehensive development in Preconstruction efforts.

• Demonstrated abilities in an encompassing management role; possesses excellent management capabilities and has a history of successfully managing projects throughout professional career.

• Strong conceptual estimating budget qualifications.

• Effectively analyzes data and past performance on projects to perform all estimating functions.

MILLE AND SEVERSON INC., Los Alamitos, CA 1999 to Present

Senior Estimator

• Responsible for a variety of duties that require expertise in multiple areas which include but are not limited to the following: strong mathematical skills; works effectively with others; excellent timeline management; comprehensive knowledge conceptualizing and estimating budget qualifications.

• Reviews and analyzes information with a keen eye for accuracy, detail, and completeness.

• Responsible for maintaining organized filing of work documents as historical data that can be referenced later.

• Utilize blueprint reading expertise to help facilitate workflow on a day-to-day basis and when required.

• An instrumental part in creating & updating "conceptual budget" in house estimating templates for use by all in the estimating department.

T. VIOLE’ CONSTRUCTION CO., INC., Tarzana, CA 1984 to 1999

Senior Estimator and Project Manager

• Handled an assortment of tasks and duties in this role; responsible for supervising all bidding projects in Commercial/Industrial Division.

• Served as the Project Manager of construction projects ranging from $30,000 tenant improvements to $14,000,000 office parks.

• Demonstrated a keen ability to manage projects and timeliness effectively.

Key Achievements

• Outstanding estimating vs. final job cost profit/loss margin.

• Increased estimating accuracy utilizing various methods that included but not limited to cost estimating spreadsheets designed for every project requirement.

• Maintained excellent records of historical costs per square ft. by sub-trades for various building types.

• 28 years experience with Los Angeles City Building Department & Public works obtaining any necessary permits as required.

• Utilized strong communication skills to negotiate change orders to owners and subcontractors.

• Demonstrate exceptional organizational abilities while required to organize all close-out requirements for retention billing & project completion.

MILLER & SONS GENERAL CONTRACTORS, Van Nuys, CA 1977 - 1984

Estimator

• Received comprehensive training and professional development in quantity takeoffs and was responsible for supervising plan room for major construction projects. Additionally, trained in blue print reading by the senior project manager, one of the foremost general contractors in the Los Angeles area.

• Demonstrated a strong attention to detail, accuracy, and completion.

• Utilized a keen eye for detail on a day-to-day basis while blueprint reading.

Key Achievements

• Hands on practical experience in structural drawing interpretation.

• Performed quantity takeoffs for the following: concrete, lumber, rough hardware and plywood.

EDUCATION AND PROFESSIONAL DEVELOPMENT

• Moorpark College, Business management 1978-1979.

• Certifications: SWPPP Certification.

ESTIMATOR AND/OR PROJECT MANAGER – PROJECT LIST

• GOLDEN SPRINGS DEVELOPMENT - COMMERCIAL/INDUSTRIAL PARK Santa Fe Springs, CA- 25 buildings / 5,226,402 million sf. Architects: HPA Architects. Web link: http://www.mandsinc.com//page_sub.php?page_id=94.

• OVERTON MOORE PROPERTIES/SANDERS RUBBERCRAFT - Corporate and engineering offices, labs, manufacturing facilities and warehouse distribution. Long Beach, CA Architects - Ware Malcomb Architects. 135,429 sf. Web Link: http://www.mandsinc.com//page_sub.php?page_id=287

• MAGELLAN GROUP VALENCIA BUSINESS CENTER - COMMERCIAL / INDUSTRIAL PARK. Fullerton, CA, 25 buildings/221,253 sf. Architects - Hill Pinckert architects. Web Link: http://www.mandsinc.com//page_sub.php?page_id=206

• DUVAL YOUTH CENTER, ST MONICA’S CHURCH, Santa Monica, CA. 5,100 sf. Multi-purpose building. Owner - The Roman Catholic Archbishop of Los Angeles. Architect – Armet Davis Newlove & Associates, AIA.

• MEDIA AVIATION HANGERS PHASE 2, Burbank, CA. 150,000 sq ft Site work and 71,840 sf. Aircraft hangers. Owner – Media Aviation. Architect - De Revere & Associates.

• KOWLOON TENANT IMPROVEMENT, Santa Monica, CA. 5,500 sf. tenant improvement. Owner – Kowloon Wholesale Seafood Co. Warren Wolff Wagner, Architects.

• MILLER HONDA ADDITION, Van Nuys, CA. Owner – Miller Family Co., Inc. Architect - David H. Raider.

• FABER EARTHQUAKE RETROFIT, Canoga Park, CA. 31,000 sf. Division 91 structural seismic upgrade, panelized roof. Owner – Faber Enterprises. Architect – Delta Engineering.

• KISS STORAGE, North Hollywood, CA. 5 Story, 92,000 sf. Type III. Owner – Kiss Storage. Raymand Medak, Architect.

• ST. CHARLES PARISH CENTER, North Hollywood, CA. 7,5000 sf. residential remodel into parish offices. Owner – The Roman Catholic Archbishop of L.A. WWCOT Architecture.

• BANK OF ENCINO TENANT IMPROVEMETS, Encino, CA. 7,800 sf. tenant improvement. Owner – Bank of Encino Organization. Architect - Rene Mendoza.

• NATIVITY SCHOOL REPAIRS & RESTORATION, Los Angeles, CA. Earthquake Restoration. Owner – The Roman Catholic Archbishop of L.A. WWCOT Architecture.

• MSGR. MICHAEL J. O’CONNOR ACTIVITY CENTER, ST. MEL PARISH, Woodland Hills, CA. 15,800 sf. state of the art gymnasium activity building with full kitchen and reception hall. Includes stage and theatrical lighting, sound system, maple sport floor for basketball and volleyball. Owner – The Roman Catholic Archbishop of L.A. Architect – T.W. Layman Associates.

• GTC/WARNER AVIATION OFFICE, Burbank, CA. 9,600 sf. tenant improvement at Burbank Airport. Owner – GTC Aviation. Interior Architects, Inc.

• SATURN OF SANTA CLARITA, Valencia, CA. 23,000 sf. showroom and 30,000 sf. garage. Owner – H.F. Boeckmann, II & Jane Boeckmann. Architect – Steve Barasch AIA.

• STUDIO SELF STORAGE, North Hollywood, CA. 33,690 sf. tilt-up. Owner – Lankershim Storage Partners. Architect – Beck-Moffett Associates.

• ST. MARTIN OF TOURS SCHOOL & RECTORY ADDITIONS/ALTERATIONS, Los Angeles, CA. 8,000 sf. new school and science laboratory. Owner – The Roman Catholic Archbishop of L.A. Architect – O’Leary Terasawa Partners, AIA.

• LOCKER ROOM RENOVATION ST. MONICA’S HIGH SCHOOL, Santa Monica, CA. 5,000 sf. remodel and new shower rooms. Owner – The Roman Catholic Archbishop of L.A. Architect – Construction Management Resources.

• ST. PETER CLAVER CHURCH, Simi Valley, CA. Preconstruction Services, budget bid. Owner – The Roman Catholic Archbishop of L.A.

• LOUISE/LOUISE, Northridge, CA. Airtouch Cellular equipment site/tower. Owner – Air Touch Cellular. D.E. Miller Architects.

• ST. CYRIL CHURCH RECTORY ADDITION, Encino, CA. 2–story addition. Owner – The Roman Catholic Archbishop of L.A. Architect – O’Leary Terasawa Partners, AIA.

• RECTORY INTERIOR ALTERATION, ST. CHARLES CHURCH, North Hollywood, CA. 3,500 sf. new interiors. Owner – The Roman Catholic Archbishop of L.A. Architect – O’Leary Terasawa Partners, AIA.

• T.I. RENOVATIONS, Encino, CA. 5,800 sf. tenant improvement. Owner – Manny Rider. Architect - David H. Raider.

• SPECTATOR PLAZA OFFICE RETAIL BUILDING, Encino, CA. 7,000 sq ft. shell with stone veneer. Owner – Sam Spector. Solberg & Lowe Architects.

• ST. CHARLES SCHOOL ROOF TILE & FRAMING, North Hollywood, CA. New roof and Mansard framing. Owner – The Roman Catholic Archbishop of L.A. Architect – O’Leary Terasawa Partners.

• ST. LOUIS OF FRANCE NEW PARISH HALL, La Puente, CA. 10,200 sf. assembly Hall. Owner – The Roman Catholic Archbishop of L.A. Architect – O’Learly Terasawa Partners.

• COASTAL FEDERAL BANK ADDITION & 1st FLOOR INTERIOR, Tarzana, CA. 5,000 sf. tenant improvement. Owner – Coastal Federal Bank. Architects – Clements & Clements.

• COASTAL FEDERAL BANK 2nd FLOOR & BASEMENT, Tarzana, CA. Replace 15,000 sf. new interiors from earthquake damage. Owner – Tarzana Village Company. Architect – John Sergio Fisher & Associates.

• COASTAL FEDERAL BANK STRUCTURAL REPAIR, Tarzana, CA. 15,000 sf. major earthquake reconstruction of 2-story building w/basement. Owner – Tarzana Village Company. Architect – John Sergio Fisher & Associates.

• EARTHQUAKE REPAIRS – ROMAN CATHOLIC ARCHBISHOP OF LOS ANGELES

• ST. CATHERINE OF SIENA CHURCH, Reseda, CA. B.W. Smith, Structural Engineer.

• SANTA ROSA CHURCH, San Fernando, CA. Architect – Rene Mendoza.

• SANTA ROSA SCHOOL HALL, San Fernando, CA. Architect – Rene Mendoza.

• SANTA ROSA RECTORY, San Fernando, CA. Architect - Rene Mendoza.

• SANTA ROSA CHURCH SCHOOL, San Fernando, CA. Architect – Rene Mendoza.

• ST. CYRIL’S HALL, Encino, CA. Architect – O’Leary Terasawa Partners.

• ST. CYRIL’S SCHOOL, Encino, CA. Architect – O’Leary Terasawa Partners.

• ST. CYRIL’S COVENANT, Encino, CA. Architect – O’Leary Terasawa Partners.

• ACTION COMPUTER DEVELOPMENT, Santa Clarita, CA. 5 acres grading, utilities and storm drain. Owners – Action Computer.

• BANK OF ENCINO REMODEL, Encino, CA. 5,000 sf. tenant improvement. Owner – Bank of Encino. Architect – Jim Bourlgault, AIA.

• SANTA ROSA de LIMA CHURCH REMODEL & ADDITION, San Fernando, CA 2,500 sf. addition, all new finishes. Owner – The Roman Catholic Archbishop of L.A. Architect – Rene Mendoza.

• D.A. CAMPBELL, STE. 840 LOWE ENTERPRISES BLDG., Los Angeles, CA. 4,500 sf. tenant improvement for stock brokers. Owners – Lowe San Vicente Associates. Architect – David Maman.

• RICHARD IRVING VIDEO LIBRARY, MPTF, Woodland Hills, CA. 800 sf. library. Owner – Motion Picture & Television Fund. Architect – W. Frazier Overpeck.

• LIBRARY & STUDY HALL REMODEL, LOUISVILLE HIGH SCHOOL FOR GIRLS, Woodland Hills, CA. Classroom remodel. Owner – Sisters of St. Louis. Architect – O’Leary Terasawa Partners.

• CO-GENERATION ABSORBER INSTALLATION, MPTF HOSPITAL, Woodland Hills, CA. New chiller, mechanical system, piping and electrical; OSHPD inspected. Owners – Motion Picture & Television Fund. Architect – Retrofit Systems, Inc.

• PROFESSIONAL OFFICE BUILDING SUITE #100, #102 and #104, Sherman Oaks, CA. Tenant Improvement of pharmacy and medical offices. Owner – Reston – Sinco. Architect – Gerald E. Schmid & Associates.

• TRAMMELL CROW COMPANY/CDC GATEWAY AT ALHAMBRA, Alhambra, CA. 3 stories/116,938 sf. Structural steel frame and metal deck. Architect – Langdon Wilson Architects.

• TRAMMELL CROW COMPANY INNOVATION VILLAGE - PHASE III, Pomona, CA. 3 stories/123,060 sf. Concrete tilt-up with light steel frame and metal deck. Completed 2007. Architect - MacDavid Aubort Architects.

• INNOVATION VILLAGE - PHASE IV, Pomona, CA. 3 story/123,060 sf. Concrete tilt-up with light steel frame and metal deck LEED Gold Completed 2011. Architect - MacDavid Aubort Architects.

• PACIFIC GATEWAY BUSINESS CENTER - Seal Beach, CA. 10 buildings/826,280 sf. Overton Moore Properties Commercial / Industrial Park. Completed 2007 Architects - DeRevere & Associates www.derevere.com.



Contact this candidate