Name of Present Organization: Werm wink JV India Private Limited.

Name: PARTHA NEOGI

Profession: Civil Engineer ; Date of Birth: 14th August, 1955;

Nationality: Indian;

Membership in Professional Societies: Life Member - Institute of Public

Health Engineers, India

Countries of work Experience: INDIA; Oman/UAE; Bhutan; Sri Lanka& Nepal

Key Qualifications:

More than 30 years of project experience in the field of Water Supply &

Waste Water Management, Environmental Planning & Management, Structural

Design, Construction Supervision of Civil works for both Concrete Structure

& Steel Structure Fabrication/Erection, installation of water supply and

sewerage pipeline, installation of mechanical and electrical

equipments/machineries and management of industrial projects & residential

buildings. Also have the experience for providing consultancy for

construction of Bio-mass gas fire power plant under West Bengal Renewable

Energy Development Authority. Activities in these assignments include fact-

finding studies/surveys, conceptual planning, system design, financial

analysis, evaluation of quantities for different items of work for

construction of industrial structures, building structures, steel

structures, water supply & sewerage network, water supply & waste water

treatment plants including preparation of tender document in accordance to

FIDIC for International and National bidding.

I have gained valuable experience in assignments as Team Leader/Project

Director/ Project Engineer related to detailed design and preparation of

bidding documents for various private and public sector projects in

accordance to FIDIC in different disciplines under different multilateral

funding agencies including World Bank, ADB, KfW, Danida and JBIC. As part

of these assignments I have reviewed designs for structural items of

various civil & mechanical works, water supply distribution networks,

sewerage collection system prepared detailed bills of quantities, technical

specifications, bid documents, engineering drawings and cost estimates.

Worked as an International Consultant for Water Supply & sanitation on

behalf of ADB, TA project for Development of Tourism in between five

countries namely India, Bangladesh, Sri Lanka, Nepal & Bhutan along with

Tourism Consultant of Newzeland. Also worked as Land Development Engineer,

for identification of projects in Mumbai, Maharashtra, for providing

funding assistance by JBIC (presently JICA). Worked as Team Leader for

preparation of design and tender document for construction of 10 MLD Water

Treatment Plant at Gelephu, Bhutan financed by DANIDA. Worked as Project

Director/Team Leader for development of infrastructure like Water Supply,

Sewerage collection system, rehabilitation of existing sewage treatment

plant, development roads in three towns in Bhutan namely Thimpu,

Phuentshiling and Dagana, the project funded by ADB. Also participated in

International workshop of DFID for development of health condition by

improving the sanitation and water supply for economically weaker section

of societies in different parts of the World. Have been accepted as NRW

expert by ADB for undertaking TA Project for improvement of water supply in

the North East States of India.

I have also extensive experience in project coordination and project

management, monitoring of construction work and construction supervision,

testing & certification of materials & equipments to be used for

construction of projects. Inspection of equipments both mechanical &

electrical at the fabrication workshop, pumps of various capacities to be

provided for treatment plants, inspection of electrical control panels as

per technical specification, testing of materials both physical and

chemical analysis at laboratory, used for casting of valve body and valve

internal parts, supervision during casting to certify quality of the

materials used for casting as per specification of the item of work. Tasks

have also included certification of measurement of works after physical

verification of different items of work executed, preparation of

measurement books for different items of work executed, certification of

bills and variation orders. I have also gained international working

experiences in countries like OMAN, UAE, Sri Lanka, Nepal & Bhutan.

I have adequate knowledge for preparation of drawings with the aid of Auto

Cad 2004 & Auto Cad LT. Conversant with the use of Microsoft Word Document

and Microsoft Excel.

Education: B.Sc. in Civil Engineering from Sambalpur University, India,

1982

B.Sc. from Calcutta University, India, 1975

Employment Record :

From : Feb 2012 : To: Till Date

Employer : WERM Wink JV India Pvt. Ltd., Kolkata, West

Bengal

Position Held : Project Manager/ Team Leader

From: July 2011 : To: Oct 2011

Employer : Voyants Solutions Pvt. Ltd., Gurgaon,

Haryana

Position Held : Advisor - Water & Waste Water

From: Aug 2010 : To: April 2011

Employer: : HALCROW Consulting India Pvt. Ltd.,

Noida/Delhi

Position Held : Principal Engineer - Water & Waste Water

and Team Leader for Global Design Delivery

Team.

From: Sept 2009 : To : April 2010

Employer : : Subhash Projects Marketing Ltd., New Delhi

Position Held : Head - Water (Design & Engineering)

From : Nov 2007 : To : Aug 2009

Employer : : SMEC India Pvt. Ltd., Gurgaon, Haryana

Position Held : General Manager (Water & Environment)/ Team

Leader for projects in Bhutan

From: April 2007 : To: Oct 2007

Employer : : Feed Back Ventures Pvt. Ltd., New Delhi

Position Held : Assistant Vice President - Infra structure

- Engineering & Project Management /

International Consultant for Water supply &

sanitation for ADB and Land Development

Expert for JICA

From: Jan 2006 : To: March 2007

Employer : : Consulting Engineering Services (I) Pvt.

Ltd., New Delhi & Consulting Engineering

Services Co. L.L.C., Sultanate of Oman

Position Held : Resident Engineer.

From : Jan 2003 : To : Dec 2005

Employer : : GKW Consult GmbH India, (Member of Jakko

Poyry Group)

Position Held : Deputy Team Leader - Water Supply &

Wastewater Expert for IFC (World bank)

From: Jan 1990 : To : Dec 2002

Employer : Ghezri Eastern Pvt.Ltd., STUP Consultant,

Wilbursmith Associates Pvt. Ltd.,

Consulting Engineering Services (I) Pvt.

Ltd., West Bengal Renewable Energy

Development Authority and other

Architectural/Structural Consultants in

India

Position Held : Freelance Consultant

From: June 1985 : To: Dec 1989

Employer : Consulting Engineering Services (I)

Pvt.Ltd.

Position Held : Design and Project Engineer

From : March 1984 : To : May 1985

Employer : Ghosh Bose & Associates Pvt.Ltd.

Position Held : Design and Construction Supervision

Engineer

From: Nov 1982 : To: Feb 1984

Employer : Toyo Engineering India Ltd.

Position Held : Construction Supervision Engineer

Relevant Experience

From : 03/2012 Till date As Project Manager/ Team Leader responsible for

planning of diversion of flow arrangement of the existing sewer

line prior to undertaking de-silting of the existing man-entry

brick sewers including stanching arrangement and location of

access pit. Review of the structural design of the Type II GRP

panels of circular or ovoid shape in accordance to the

stipulation made in WRC manual - check for thickness of the GRP

panels, flexural modulus and bending stress to withstand the live

load and equivalent hydraulic load depending on cover depth of

the panels and recommend for approval to the client. The work

being executed by International Contractor namely M/s Michel Bau

of Germany and M/s Angerlehner of Austria under Global contract.

The value of project is more than Rs. 200.00 Crores.

The diameter of the sewers varying from1650 mm diameter to 3050 mm

diameter of length nearly

8.5 KM. Management of construction of

rehabilitation work including monitoring of day to day

progress of project work executed by contractor,

for undertaking de-silting of existing sewers, local

repairing of inside surface of sewers, conduct

CCTV after de-silting to access the condition of the

sewer line, check physical dimension of the sewer

line, conduct CCTV to assess extent of local

repairing and location of existing branch

connection with the trunk sewer, lowering of GRP panels,

alignment & fixing of panels, grouting of

outside periphery of the GRP panels to fill up the void in

between existing brick sewer and the panel and

review of CCTV post lining to assess all existing

branch connections and finishing of sewer line

and face of all branch connection of lining with GRP

panels. Total length of balance man entry brick

sewer is approximately 11.0 Km along busy roads

within the city of Kolkata.

Monitoring of the progress for condition

assessment for non-man entry brick sewer after de-silting

of existing sewer line through CCTV of varying diameter from 600 mm

to 1050 mm for an

approximate length of 9.5 Km existing along the main street of

Kolkata City. The Project is for

Rehabilitation & refurbishment of age old Brick

Sewers under JNNURM funding executed by

Kolkata Municipal Corporation. Preparation of

Tender document for Non - Entry Sewers for

Global Tender in accordance to FIDIC for Phase -

II and Phase - III including evaluation of tender

documents and recommendation of contractor on the

basis of evaluation.

From 07/2011 Working as Advisor Water and Waste Water - Responsible for

preparation of DPR for

To : 10/2011 rehabilitation of sewerage trunk main for diversion of

flow of sewage of the entire city

Area to the proposed sewage treatment plant

for prevention of flow untreated sewage to

Lakes within the city under National Lake

Conservation project of Rajasthan Urban

Infrastructure Development Project (RUIDP). The

detailed project report prepared with all details

of quantities of individual items of work and

preliminary cost estimate along with bid document..

From Working as Principal Engineer / Team Leader, Urban Water &

08/2010 Waste Water - basically responsible for development of

To : Master Plan for water supply and sewerage through a team of

04/2011 engineers for a proposed township in Gurgaon.

Further working as Team Leader for Global Design Delivery

team to provide detailed design for projects in UK &

European countries. Responsible for design of waste water

storage tanks to take the stock of peak flow during peak

hours of use and save the sewage treatment plant from

excess loading. The stored waste water will flow to the

treatment plant during the lean period and maintain

equilibrium within the STP.

From: Working as Head of Water (Design & Engineering for

09/2009 construction) leading a team of 35 people comp-rising of

To : Engineers in the field of Hydraulics, Structural Design,

04/2010 Mechanical &

Electrical Engineering, Instrumentation Engineering along

with other support staff. Main responsibility was to

develop design of 24 x 7 Water supply system for PPP

project at Latur, Maharashtra, for 10 years period

Management Contract; Reduce NRW from more than 50% to

minimum operating level 20% and improve the service level

of supply to consumer from once a day for 2 hours to 24 X 7

after necessary hydraulic modeling of the total supply

system. Design of 60 MLD WTP along with design of Bulk

water transmission main through a length of 30 Km. from WTP

to Bhiwandi Municipal area for Bhiwandi Municipal

Corporation on PPP basis for 20 years Concession agreement

along with development of Water supply distribution

management for reduction of NRW to 15% for the Bhiwandi

Municipal water supply network; identification of locations

of losses through pipe lines, records of number of bursts

in the pipe network; hydraulic analysis of flow of water

through different existing water supply network;

identification of low pressure zone and high pressure zone

in the network; balancing of flow and gradient in the

network and modification of pipe diameter as required

according to the demand of supply in different zone of the

total municipal area.

Design for execution of 42 MLD STP including design of 130

Km sewage collection system of various diameter from 600 mm

to 1800mm for laying of trunk main and 2 Nos. pumping

stations of 14 MLD & 40 MLD for UP Jal Nigam at Kanpur;

Design for execution of 54 MGD sewage pumping station at

Preet Vihar, New - Delhi;

Development of water supply service level for Madurai for 3

Nos. wards on pilot basis for conversion of the same to 24

x 7 water supply system by rehabilitation of existing

distribution network pipe lines and prepare DPR to extend

the 24 x 7 water supply system for whole of Madurai City

area under Madurai Municipal Corporation.

Business development and preparation of proposal for

different projects; Preparation of tender proposal for

construction of 2 Nos. 20 MGD sewage Treatment plant under

DJB, at Pappankala & Neelothi. Study of the present water

supply scenario of Aurangabad city area under Aurangabad

Municipal Corporation for improvement water supply service

level for the consumers within the municipal area by

reducing NRW from 60% to 15% after replacement of almost

70% of the existing worn out pipes, development of supply

level by hydraulic modeling of the supply system and total

distribution network, upgrading of the existing intake

works and the water treatment plants for preparation of the

bid proposal under PPP.

From:11/200 General Manager - Water & Environment; Business Development

7 and provide necessary technical inputs for different

To : projects on water supply, sewerage development, water

08/2009 resources and environmental studies.

Team Leader for MOEF project to review of the study carried

for improvement of quality of water flowing from different

waste water / effluent treatment plants to different rivers

/ lakes situated within the state of West Bengal, Bihar,

Chhattisgarh & Madhya Pradesh after carrying out all

physical and chemical test of the effluent from the

treatment plants and also testing the quality of the water

of the rivers and lakes - to conduct audit of the new

treatment plants and improvement of the existing treatment

plants in accordance to the specifications and bill of

materials provided for each unit of works available with

the state pollution control board of individual states.

NRW Expert fo NRW Expert for ADB funded TA project for

five States in the North East of India for Urban

Development Project, for improvement of water supply system

and reduction of NRW in the states of Tripura, Mizoram,

Nagaland, Manipur & Sikkim. Understanding of losses of

water through distribution mains and transmission mains for

supply of treated water from WTPs. Study of the existing

condition of WTPs along with assessment of condition of

existing pipe lines.

Project Director Project Director/ Team Leader for

Project Management Consultancy for Development of Water

supply, Sewerage system, Roads, Water Treatment Plant and

Sewerage Treatment Plant including preparation of O & M

Manual for three towns Thimpu, Phuentshiling & Dagana in

Bhutan under ADB financial assistance.

Team Leader f For design & execution of a 10MLD capacity

Water Treatment Plant at Gelephu, in Bhutan under financial

grant assistance from DANIDA (Danish Loan agency).

Team Leader for development of Master Plan for two towns

Trashigang & Geylphosing in Bhutan under DANIDA financial

assistance and also Team Leader for development of design

for 10MLD Water Treatment Plant at Gelephu, Bhutan

including preparation of bid document under DANIDA

financial assistance.

Project Director for World Bank funded project for

providing training to water users association and providing

training to farmers towards optimum utilisation of water

for irrigation during the dry period of the year under

MPWSRP, Bhopal.

Project Director for World Bank funded project for

Technical Examination of Irrigation Structures and

certification of quality of the structures executed by

different agencies for UPWSRP, Lucknow.

Design of total Hydraulic system (water supply & waste

water pipe line including design of storm water drainage

arrangement and plumbing design for individual toilets)

along with design of Fire Fighting arrangement, all pumping

arrangement, treatment facility by R.O. technology and rain

water harvesting for two numbers of Stadium at Siri Fort &

Yamuna Vihar in New Delhi, proposed to be renovated and

constructed in Delhi for Common Wealth Games in the year

2010 in accordance with the specifications of International

Standards, of EKS.

From: Water Supply & Sanitation Expert for DFID (UK) Workshop at

04/2007 New Delhi - Identification of various kinds of projects for

To: conducting Research for improvement of living condition of

10/2007 the weaker section of the society living both in Urban area

and Rural area of under developed countries like India &

Bangladesh together with some places of African countries.

International Expert for water supply, sanitation & solid

waste management as a member of the SASEC (South Asia

Sub-Regional Economic Co- operation) Study Team under ADB

financed PPTA project along with Tourism Resource

Consultant of New Zealand towards development of tourism in

five countries India, Bangladesh, Bhutan, Nepal and Sri

Lanka. Identify different projects for development of

International Tourism within the five countries specially

for development of tourism at Buddhist Foot Step and also

to develop Eco-Tourism within these five countries to

alleviate the poverty level within the rural population by

involving the rural people within the eco-tourism projects

specially in development of trekking in the great Himalayan

Trial in Nepal, Bhutan and India. Client :

ADB/Tourism Resource Consultant of New Zealand.

Project Director/ Team Leader for Design of 24 X 7 water

supply system by augmentation of the existing pipe line

network for reduction of NRW within the municipal area

after necessary hydraulic modeling for town Morbi in the

state of Gujrat including preparation of bid document.

Client: GUDC, Ahmedabad.

Land Development Engineer - As member of JBIC Mission Team

for TA Project (SAPROF - Special Assistance for Project

Formation) for Mumbai along with International counterpart

Nippon Koei of Japan. - Identify scope for provision of

funding from JBIC in the sector of water & waste water,

water resource, electricity generation and distribution

system. Client : JBIC/ Nippon Koei.

Project Director for Design Validation & Project Management

Consultancy for Construction of Transformer Manufacturing

Factory at Vadodara for AREVA T & D. Client : AREVA T & D,

France.

From: Project Management & Construction Supervision of Sewerage

01/2006 System including construction of sewage treatment plant at

To: Hamra Ad Duru, Wilyat Ibri, in Sultanate of Oman. Client:

03/2007 Ministry of Regional Municipalities, Environment & Water

Resources, Sultanate of Oman. - As Resident Engineer

Project Management and Construction Supervision.

Sewerage System comprising of 6.0 km sewerage network,

construction of R.C.C. Man-Holes, laying of sewage pipe

lines, laying of pipe line for individual House

connections, including construction of R.C.C. Inspection

Chambers.

Construction of sewage pumping station, laying of H.D.P.E.

pipes for a length of 1.5 Km for pressure main from sewage

pumping station to sewage treatment plant.

Review of design including necessary modification of STP;

review of sizes/capacity of aeration chamber, sludge

holding tank, capacity of air-blower, chlorination chamber,

storage tank for holding treated water for distribution to

nearby locality for use of water for various activities

except for drinking / portable use.

Construction of 180 Cu. M. capacity Sewage Treatment Plant

constructed with R.C.C. treated on the surface with epoxy

based resin paint to prevent corrosion being in contact

with sewage. Preparation of guidance manual for O & M of

the STP.

Installation of electro-mechanical equipments, mainly

pressure filter, air-blower, pumps, solenoid valves,

automatic control switches, air-diffusers, all necessary

pipe lines including all electrical works etc. including

preparation of O & M procedures.

Certification of measurements of quantities of work

executed as per items of work of the bill of quantities,

preparation of the measurement sheets of the executed

quantity for different items of works, certification of

bills submitted by the contractor for payment.

From: Preparation Concession Agreement for appointment of a

04/2005 Private Operator for managing Water Supply and Sewerage

To: System of 8 Urban Local Bodies around Bangalore city,

12/2005 Karnataka Client: IFC, World Bank, Washington, USA.

As Deputy Team Leader Water Supply & Waste Water -

Contract Engineer:

Study of the existing sewerage & drainage system, study of

existing water supply status to individual municipalities

and loss of water for flow through pipe lines, study of the

existing wastewater treatment plant, study of O & M

practice undertaken by the authority, providing suggestion

for repair & renovation and upgrading of the total system

for optimum use and development to meet the requirement for

increase in population up to the year 2021.

Study and analysis of Bench Mark for water supply and

sewerage system to be developed for the ULBs in comparison

to the International Standards;

Due diligence study of the entire water supply system and

sewerage system based on the available design developed by

different consulting agencies and review of the available

drawings from Bangalore Water Supply & Sewerage Board;

Preparation of cost estimate, Bills of Quantities for

laying of additional pipe lines for water supply and waste

water network including the cost for providing House

connections after assessing quantities for different items

work.

Preparation of the final report on revenue return from the

project along with Bank financial analyst from Washington.

From: Design and preparation of DPR for development of Water

09/2004 Supply and Sewerage System in three municipal towns in

To: Andhra Pradesh. Client: World Bank, India. As Principal

03/2005 Consultant responsible for:

Preparation of conceptual plan

Study of the present NRW level and leak detection within

the existing distribution and supply network;

Design and development of Water Supply Distribution Network

and Sewerage Network including design of Sewage Treatment

Plant

Preparation of O & M manual for the sewerage network to

adopt the best practice to keep the sewer lines free from

any blockages.

Preparation of budget and investment plan for

implementation of projects in the

Municipal towns..

From: Preparation of DPR for abatement of pollution in the river

09/2003 Sone under NRAP under the regime of Town Shahdol, Madhya

To: Pradesh, India. Client: Central Pollution Control Board,

08/2004 Madhya Pradesh, India. - As Sanitary and Costing Engineer.

Study of existing system of sewerage or drainage

arrangement within the municipal area, arrangement of house

drainage system, existing treatment facility of the sewage

for individual houses, treatment facility available with

the municipality

Study of the existing solid waste collection arrangement

from individual premises, solid waste treatment facility

available within the municipality, method of treatment of

solid waste presently adopted by the municipal authority

Preparation of technical specifications, preparation of

scheme drawings

Preparation of bid documents in accordance to FIDIC,

evaluation of quantities for various items of work for

construction of proposed waste water treatment plants,

solid waste treatment plants along with quantities for

improvement of the existing water supply network and priced

schedule of quantities required to assess budgetary

expenses to implement the project.

From: Water Supply and Sewerage System for Udaipur city,

04/2003 Rajasthan, ADB funded Project, Client: RUIDP, PHED,

To: Rajasthan, India. - As Design Engineer:

08/2003 Preparation of concept Maps, technical specifications and

bid documents.

Study and condition assessment of different existing water

supply distribution pipelines and design of pipe line for

rehabilitation of the water supply distribution system to

improve UFW of the water supply system.

Study of water supply transmission main from Jaisamand Lake

to Udaipur City through a distance of 50 Km, along with

assessment of the condition of the existing pumps & motors.

Computation sewage generation and design of the network for

the collection system. Study for availability of suitable

area for construction of sewage treatment plants on the

outskirts of the city area depending on the variable

contour profile of the city area.

Evaluation of quantities of various items of work,

preparation of technical specifications & bid documents in

accordance to FIDIC along with preparation of budgetary

cost estimate.

From: Design and project monitoring for 500 MW Bio - Mass Power

02/2002 Plant at Chotomollakhali, Sunderban, West Bengal for rural

To: electrification. Client : West Bengal Renewable Energy

03/2003 Development Authority - As project Consultant

Initial survey of the plot of land suitable for

construction of power plant

Design of the power plant with structural shed for covered

power plant

Design of foundation for reduction of vibration of the gas

based generators

Design of store building for storage of spare parts and dry

bio-mass

Design of bio-mass drying yard

Design of water supply, drainage and sanitation arrangement

within the complex of the power plant

Detailed structural design for truss and frames and design

of sheeting to withstand high storm in the coastal area

Project monitoring from conception to commissioning of the

power plant

From: Water Supply and Sewerage Scheme for industrial Growth

10/2001 Centre near Pasighat, at Arunachal Pradesh Client:

To: Directorate of Industries, Govt. of Arunachal Pradesh,

01/2002 India - As Project Consultant

From: Water Supply and Sewerage Scheme for Olive Garden near

08/2001 Rajarhat New Town at West Bengal, India.Client: Partha Das

To: & Associates, Kolkata, West Bengal - As Design Engineer

09/2001

From: Construction supervision and design of water supply &

11/2000 sewerage network for Housing Complex 'SHANTIVAN', Kolkata,

To: West Bengal; Client : D.C. Paul & Sons Pvt. Ltd. - As

07/2001 Design and Construction Supervision Engineer

From: Water Supply Scheme for Asian Leather Complex, Kolkata,

05/2000 West Bengal; Client: Asian Leather, India - As Design and

To: Construction Supervision Engineer.

10/2000

From: Construction supervision of multi-storey housing for

01/1998 Directors of New Tea Company at Alipur, Kolkata. Client :

To: New Tea Company, India - As Project Engineer:

04/2000 Responsible for design, planning and construction

supervision of the multi-storey residential housing

Approval of building plans from the Kolkata Municipal

Corporation

Contract negotiations

Quantity measurements and quality control of construction

works

From: Water Supply and Sanitation Scheme for Cooch Behar Town.

03/1997 Client: PHED, Govt. of West Bengal, India - As Project

To: Engineer.

12/1997

rom: Water Supply and Sewerage Scheme for Mahestala Township,

01/1996 West Bengal

To: Client: Mahestala Municipality, India - As Design Engineer.

02/1997

Water Supply, Sewerage and Drainage Design for Purulia

From: Pumped Storage Project, West Bengal. Client : West Bengal

01/1994 State Electricity Board, Govt. of West Bengal. - As Design

To: Engineer.

12/1995

Design of Water Supply and Sewerage network for Development

of State Bus Depot along with workshop at Bankura, West

From: Bengal. Client : South Bengal State Transport Department,

01/1992 Govt. of West Bengal - As Design Engineer

To:

12/1993 Planning and design of Behrampur Bus Depot cum workshop,

for North Bengal State Transport Department, Govt. of West

Bengal

From: Client : North Bengal State Transport Department, Govt of

01/1991 West Bengal. - As Design Engineer.

To:

12/1991 Design of Water Supply and Drainage system for Improvement

of North Bengal State Transport Bus Depot along with

workshop at Cooch Behar, West Bengal

Client : North Bengal State Transport Department, Govt of

From: West Bengal - As Design Engineer

01/1990 Design of Water Supply distribution system for

To: Multi-storied Housing Complex, at Shantiniketan, Bolpur,

12/1990 West Bengal. Client: Peerless,- As Design Engineer

From:

10/1989

To:

12/1989

From: Design of Water Supply distribution system and Sewerage

04/1989 network for Falta Export Processing Zone, Falta, South 24

To: Parganas, West Bengal

09/1989 Client: Govt. of West Bengal. - As Design Engineer .

Nagpur Sewerage & Sewage Treatment Project

From: Client: Nagpur Municipality, India. - As Design Engineer.

09/1988

To:

03/1989

From: Central Bank of India Staff Housing Project, 1988. Client:

01/1988 Central Bank of India, Rourkella, Orissa, India. - As

To: Project Engineer and Construction Supervisor.

08/1988

From: Formulation of Minimum Indian National Standards (MINAS)

08/1987 for manmade fiber industries in India, 1987 . Client:

To: Central Pollution Control Board, India. - As Design

12/1987 Engineer. - Carrying out an All India level survey on

Industrial Effluents generated from man made fiber

industries in the country and to determine the Minimum

Indian National Standard (MINAS) for discharging of the

effluent to various receiving bodies.

From: Staff Housing Project for ONGC, Agartala, 1987. Client:

01/1987 O.N.G.C, Agartala, India. - As Design Engineer.



Contact this candidate