Post Job Free

Resume

Sign in

Marine Works Superintendent

Location:
Al Khor, KH, Qatar
Salary:
300 usd per day
Posted:
May 18, 2013

Contact this candidate

Resume:

CURRICULUM VITA

Position Applied for : Superintendent

Name : JUAN F. EVANGELISTA JR.

Date of Birth : June 01, 1961

Civil Status : Married

Telephone no. : +974******** (Qatar), +639*********

(Philippines)

Contact Address 1 : Bldg 16, Street 688, Zone 74,

Al Khor, Qatar,201184

Contact Address 2 : #52B Barangay Torres, Dinalupihan Bataan,

Philippines, 2110

E-mail Address : abvhqz@r.postjobfree.com

abvhqz@r.postjobfree.com

DISCIPLINE : CIVIL ENGG, MARINE WORKS & LAND SURVEYING

With post graduate experiences of 29 years in the following fields of

construction management, implementation and supervision

* Civil Infrastructures/ Heavy Civil Works

* Site Development/ Soil Improvement

* Building Works/ Desalination Plant/ Power Plant Boiler House/TG

Foundation

* Offshore Bridges

* Dredging and Reclamation Works (Near shore/Offshore/Rivers)

* Slope Protection Works/ Rockworks

* Bored Piling, Steel Pipe Piles/ Concrete Piling and Sheet Piling

* Precise Construction of Specialized Service Buildings

* Road Works and Interchanges

* Quality Control Survey Procedure

* Network Control Survey and Topographical Mapping

* Port and Harbor construction/Slipways/Jetties

* Cost Reporting and Programming of Works

* Materials and Quantity take-off for Billing and Tendering Purposes.

* Power plant construction

* Wireless telecom infrastructure construction and management

* Oil and Gas Industry

* Drainage Works

* Construction of Flood Control and Levees

* Quarry Operation & Blasting Activities

* Quay Wall Construction (Underwater)

EDUCATION:

School Date of Attendance Diploma/Degree

Northern Bataan Institute 1967 to 1973 Elementary

Northern Bataan Institute 1973 to 1977 High School

University of Baguio 1977 to 1981 B.S. in Civil

Engineering

MEMBERSHIP/ CERTIFICATE:

Member : 1981- Philippines Institute of Civil Engineers

Certificate : 1982- Town Planning, Ministry of Local Government

WORKING EXPERIENCES:

January 2012 to Date

Package Manager / MARINE WORKS

UCC Doha, Qatar

Specific Duties and Responsibilities:

. Project Management of Dredging/ Excavation of 11.33 million cubic meters

of silt, mud & rocks for Coast Guard Base; & for Main Navigation Channel

& Island Palace in Qatar.

. Supervision in the creation of 2 offshore islands with a combine quantity

of 4 million cu meters.

. Supervise offshore geotechnical investigation and witness in situ and

laboratory testing of samples.

. Supervise controlled blasting of onshore excavation of Harbour with a

volume of 2.5 million cubic meters of limestone, and calcarenite.

. Prepares Method Statement for dredging works, reclamation, quay wall

construction, slope & scour protection works, and relocation of mangrove

trees, dewatering & construction of temporary earth dam/bund.

. Checks all submittals from the contractor related to dredging,

reclamation, rockworks &blasting

. Chairs weekly progress meeting with sub-contractors.

. Reports directly to the Project Manager.

. Prepares weekly Progress report as collated from sub-contractors

submittals.

. Coordinates with client's representatives on site.

. Checks TRA and coordinates with sub-con on the implementation of HSE.

. Coordinate with Environmental Consultant in conducting Marine Ecology

Study at the Base Project Area which will be impacted by Reclamation and

Dredging activities.

June 2010 to June 30, 2011

SR. DREDGING AND RECLAMATION SPECIALISTS

Worley Parsons Abu Dhabi

ADGAS Project

Specific Duties and Responsibilities:

* In- charge for the over- all coordination in checking the documentations,

plans and method statements of dredging and reclamation works using TSHD.

* Checks EPC contractor submittal if it adheres and comply with the

parameters set during FEED stage.

* Checks and monitors the progress of the works and see to it that it

adheres with the project specifications

* Coordinate on site movements of dredging and reclamation equipment's as

well as manpower and safety aspects.

* Checks progress of EPC Contractor

* Checks & review Method Statements, EIS, TRA's and other submittal for

approval by the PMT / PMC Team and make sure that HSE is taken into

consideration when preparing constructability plan.

* Checks & Review all Dredging & Reclamation documents such as EIA prepared

by the Environmental Consultant, ECC documents & Equipment's/ Manpower

allocated for the job.

* Review soil investigation reports for the Borrow Area.

* Suggests mitigation measures to maintain TSS and Turbidity to the

allowable limits.

* Monitors reports on water quality monitoring.

* Evaluates Sub Contractor Proposals for Dredging, Reclamation and Offshore

civil works.

May 2008 up to May 2010

SITE MANAGER

Waagner Biro Philippines Incorporated

2F KEYSTONE BUILDING

220 GIL PUYAT AVE, MAKATI CITY PHILIPPINES

Specific Duties and Responsibilities:

* Manage and supervise the construction of steel bridges for the rural and

urban areas in and around the different places in the country and make

sure that the implementation is safe and does not compromise the

environmental considerations especially when bridges are crossing a wide

body of river.

* Coordinates with the client (DPWH) representatives in the District and

Regional levels concerning the progress of the projects.

* Presides the weekly and monthly progress and coordination with the sub-

contractors.. Prepares the monthly reports for the Management

* Checks and evaluates the progress billings of the sub-contractors.

Suggest the preparation of catch up schedule when the project is being

delayed due to some problems on site.

August 2004 up to April 2008

CHIEF CIVIL ENGINEER

Penta-Shimizu-TOA Joint Venture

Bldg. 1074 NSD Compound Subic Bay Freeport Zone, Philippines

Type of Project: Port Development, Dredging and Reclamation Works,

Horizontal & Vertical Development

Subic Bay Port Development Project

Subic Bay Freeport Zone

Specific Duties & Responsibilities:

* Directly in charge for dredging, reclamation & rock works, wharf

construction and Access Road

* In-charge for retrieval of marine sunken pontoon and other underwater

obstruction

* Directly in-charge for implementation of Subcontractors' works

* Presides weekly coordination meeting with subcontractors

* Reports directly to the Reclamation & Construction Managers concerning

the progress and status of the works.

* Coordination with consultant regarding day-to-day activities

JANUARY 2001 up to JULY 2004

CONSTRUCTION MANAGER

Engineering Equipment Incorporated

Manggahan St. Bagumbayan, Libis, Quezon City

Type of Project: Gas & Oil Hydro treatment and LVN Isomerization Project

Petron Bataan Refinery

Specific Duties & Responsibilities:

* Manages the construction of Compressor, pipe racks, pipe sleepers

and exchanger.

* Supervised for preparation of all bar cutting and bending schedule of all

structure

* Managed other subcontractors and coordinate with client representative on

site

* Coordination with QC/QA concerning the correctness of the works

* Manages all activities on site and see to it that everything is in

accordance with the plans and specifications

* Raises technical query to the consultant on ambiguous drawings or unclear

scope of works

* Preside the sub-contractors weekly progress and coordination meetings.

* Attends the consultants and clients meeting

* Approves the monthly progress billing of the sub-contractor.

* Prepares the detailed work schedule based on the main contract schedule

and suggest catch up plan when necessary.

* Prepares manpower and equipment loading based on the schedule

* Implementation of QA/QC plan

* Oversee the implementation of HSE policies.

OCTOBER1998 TO OCTOBER 2000

DREDGING EXPERT ENGINEER

Kajima Corporation

Km 6, Amapayon, Butuan City

Type of Project: Improvement of Banza River and Land Improvement under

CARBDP/ PMO DPWH foreign assisted Project

Specific Duties & Responsibilities:

* Overall in charge for Dredging works of a 7.5km of river using Backhoe

Dredger mounted on a barge with spuds.

* Preparation of Dredging Methodologies and schedule

* Coordination with PMO/DPWH/Consultant Representatives concerning Dredging

Works

* Preparation of daily progress reports for submission to client

* Coordination with local community concerning the safe movement of the

dredger and the barges that brings the spoils at the unloading jetty for

off-loading.

* Supervise restoration of original river route and the installation of

erosion protection in the existing water ways coming from the highlands

to upland.

* Supervise actual construction of Flood control and fish pond levee along

the river bank to protect fishponds at the river mouth.

* Attends weekly meeting with the client.

* Conducts public hearing to educate and train locals in domestic waste

disposal and in protecting their river against the waste generated by

domestic consumption of food, copra production, rice farming etc.

* Develop Methodologies of Bulk Dredging, Floatation Pass and Final

Dredging of the river bed to design lines and grades for acceptance.

* Checks bathymetric survey reports on daily dredging activities and final

survey for acceptance of every 100 meters chainage of accomplished

dredging.

* Supervise construction of earth dam around the designated disposal area

to confine the contaminated spoils and avoid seepage to existing water

table and surface run off to existing Riceland.

January 1996 to August 1998

CONSTRUCTION MANAGER DREDGING & RECLAMATION

TOA Corporation

23 Pandan Cresent, Singapore 128472

Type of Project: Construction of Temporary Marine Facilities for Singapore

Chemical Complex and Dredging and Reclamation of Jurong Island and Tuas

View

Specific Duties & Responsibilities:

* Preparation of Project Master Schedule and Method Statements, including

flowcharts, manpower and equipment allocation.

* Negotiation and coordination with various sub-contractors on specialized

items of construction.

* Prepares technical and cost comparison report for use of higher

management in making commercial decision.

* Preside on daily weekly meetings with sub-contractors.

* Manages the construction of heavy lift jetties and slipway for Singapore

Chemical Complex

* Attends the weekly coordination meetings with Brown and Root who is the

main contractor for the project.

* In charge for all dredging and reclamation works with a team of engineers

who reports directly under myself.

* Coordinates with the reclamation materials suppliers from Indonesia

regarding the delivery and methodologies of placing the materials.

* Conducts walk through inspections with the client and consultant on a

monthly basis.

* Oversee the strict compliance with HSE manual and policies.

* Preparation of Methodologies and Work Procedures for reclamation and

dredging activities.

* Preparation of time schedules for the barges cycle time and delivery

schedule to site.

* Prepares floating and submerge pipeline lay-out proposal for rehandling

reclamation works.

* Monitors & supervised steel pipepiles splicing & fabrication for usage in

the heavy lift jetty construction.

May 1994- November 1995:

CHIEF ENGINEER, CIVIL WORKS

Mitsubishi Corporation

Masinloc, Zambales, Philippines

Type of Project: Turkey Project-Construction of 2X300 MW

Masinloc Coal-Fired Thermal Power Plant

By Mitsubishi Corporation

Specific Duties & Responsibilities:

* Supervise / coordinate with sub-contractor in the presentation and

implementation of various civil engineering structures such as:

construction of Turbine and Generator Foundation, Cooling Water

Facilities.

* Attend weekly coordination meeting with sub-contractor.

* In-charge for systems and methodologies in the precise setting-out and

fixing of anchor bolts in various specialized structures such as turbine

and generator foundation and other.

* Monitors daily/weekly activities of sub-contractors and suggest

preparation of recovery plan when needed.

* Direct coordination with client's representatives at site concerning

technical and social aspects.

* Checked and evaluates civil works progress billing of sub-contract

December 1992 to April 1994

SECTION ENGINEER

Turbine and Generator Pedestal

CEPA-Slipform

Pagbilao Power Plant Project

Pagbilao, Quezon

Type of Project: Construction of 700 Mega Watts Coal Fired Thermal Power

Plant on a Build-transfer Scheme by HOPEWELL

Specific Duties & Responsibilities:

* Responsible for the field planning and implementation of the works

including liaison with consortium partners.

* Attend by-weekly coordination meeting with sub-contractors.

* Responsible for the systems and methodologies use in installation and

fixing of embedment.

* Preparation of monthly progress report.

* Checks & monitors structural steel erection for the boiler house & bunker

bay including control room.

Fully in charge for the construction of Power house block, Turbine and

Generator foundation, Boiler House, Electrostatic Precipitator, Force Draft

Fan, Induced Draft Fan,, Transformer House, Main Control Building, Raise

Floor Slab and other machine and equipment's foundations

July 1990- October 1992

SENIOR SUPERVISING SURVEYOR

Ballast Nedam Groep N.V.

Air Base Facilities Projects

Dharan Airport, K.S.A.

Type of Project: Construction of Aircraft Shelters and Its Support

Facilities

Specific Duties & Responsibilities:

* Supervising a self-supporting survey operation which includes several

survey field teams, office processing and presentation of result,

reporting and detailed communication capabilities towards site

management, and other technical units within an organization that

requires information relating to survey.

* Prepares the Department budget and reports to the Business main Unit in

the central Office in Riyadh.

* Attends weekly progress meeting with sub-contractors and consultant.

* Reports directly to the Project Manager

* Review plans prior to distribution to concern survey team prior to

setting out on site.

* Prepares Method statements, Work Instructions and related setting out

sketches.

* Checks plotted topographic survey drawings before issuing to site and for

engineering design.

* Checks progress billing of earthworks and asphalt contractors.

* Supervise calibration of survey instruments and maintain proper records

for quality audit purposes.

October 1982 to May 1990

CHIEF SURVEYOR

Ballast Nedam Groep N.V.

Manama, Bahrain

Type of Project: Saudi Arabia- Bahrain Causeway Project

Specific Duties and Responsibilities:

. Positioning of Soil Investigation rig offshore

. Setting-out center lines and guide buoys for core rock filling of

embankments.

. Run leveling lines for reference and checking purposes.

. Conducts traverse and triangulation to check existing control points and

established new control for setting-out of embankments, piling purposes

and as built surveys.

. Conducts trigonometric heighting for transfer of levels from land to off

shore survey stations.

. Setting for building works, road ways and underground utilities at the

border station.

. Witness bathymetric survey using echo sounder.

. Positioning of pontoon for positioning and placing of underwater precast

elements.

. Monitoring of deformation due to load and heat.

. Precise setting out of foundation inside the coffer dam for installation

of main piles.

. Positioning of dredger at the borrow area and checks pipe location lay

out.

. Setting out of grids for reference in dynamic compaction.

. Conducts topographic surveys of reclaimed materials for quantification.

. Setting out reference buoys for dredger positioning of under water pipes

and sublines.

. Established tidal boards around the embankment areas

. Conducts cross section survey of in place quarry run, under layer and

armor rocks for records and quantification purposes.

January 1982 to August 1982

Provincial Development Analyst on Infrastructure

Provincial Development Staff Office, Bataan, Philippines

Scope of Employer Contract: Monitoring of on-going infrastructure project

for Rural Development Projects which is being carried out by the

Implementing Ministries and other government agencies.

Specific Duties & Responsibilities:

. Prepararation of five-year infrastructure development plants for twelve

towns of the Province of Bataan for the evaluation of the National

Economic and Development Authority, Conducts Structural survey for the

preparation of project feasibility studies. Coordinates with the

infrastructure committee and other implementing agencies on the progress

of projects in the rural areas.



Contact this candidate