Damian Peter Rampersad
Address: No. *, *th street West, De Lamarre Avenue, Trincity, Trinidad and
Tobago
Mobile: +1-868-***-****
Skype: damian_rampersad
Email: *******@*****.***
Marital Status: Single
[pic]
Summary of Drilling Engineering and Supervision Experience:
Slant Drilling Rig (4yrs)
. Skytop Scorpion Brewster slant Drilling/Workover rig
. Service King slant Drilling rig
Jack Up Drilling Rig (9yrs)
. Transocean Constellation - Well Site Engineer
. Transocean Monitor - Operations and Well Site Engineer
. Rowan Gorilla 3 - Operations, Well Site Engineer and Day Supervisor
Drilling Supervision
. Development oil and gas wells
. Exploration oil wells up to 25,500ft
. High Pressure wells, Mud weight > 18.0 ppg
. High Temperature wells, Temperature > 300 F
. Extended reach and near horizontal wells up to 78,
. Re-drilled wells with surface inclinations ranging from 25 to 35
Completion and Workover Engineering Experience
. Completions: -
o Open and Cased hole gravel pack
o TCP and Completion Perforating Applications
o Stand alone and pre packed screens
o Premium mesh
o Barefoot
. Repair and Recompletions
. Design and installation of HDESP, ESP, Hydraulic and PCP artificial
lift
Engineering Experience:
February 2013 - Present Trinity Exploration
and Production PLC (Take over of Bayfield Energy)
Senior Drilling Engineer - (West Coast Offshore and Onshore Operations)
> HSE, Systems and Policy
. Participate and provide leadership in Management of HSE in order to
achieve a sustainable and continuous improvement in HSE performance at
the well site
. Ensure safe work practices and demonstrate equipment provided for
health and safety purposes in accordance with the Company's safety
policies
. Participate in Incident investigations and Root Cause Analysis
investigations
> Planning, Engineering & Operations
. Prepare budgetary cost estimates for Drilling & Completions operations
. Prepare detailed cost estimates for Drilling & Completions operations
. To work with a Multi-Disciplined team in the planning and execution of
drilling wells
. Generate and compile regulatory documents for well approvals
. Coordinate activities for well location preparation
. Provide guidance on detailed equipment specifications for long lead
planning and individual wells
. Ensure engineering and planning is performed in a structured manner
. Monitor Drilling &Completions operations and provide technical and
engineering support to well operations
. Promote Management of Change and associated Risk management Systems
for D&C operations
. Provide commercial and technical information as required for Joint
Venture partners
. Review drilling equipment suitability and performance for Drilling &
Completions operations
. Ensure that well plan is executed effectively and ensure learnings are
implemented moving forward
. Responsible for various Land blocks - WD2/WD5/6
. Train and mentor Junior Engineers
> Contractor Management
. Provide support to Drilling Team and Procurement department for
creation of Tenders and Contracts for Drilling & Completions
operations
. Recommend contracting strategies for selected services
. Participate in the Technical tender evaluations for selected services
. Monitor contractors, ensuring that HSE and Contractor Management
standards are maintained
May 2009 - February 2013
Bayfield Energy (Galeota) Ltd
Senior Drilling Engineer - (Drilling & Workovers, Structural Engineering,
Field Development, Maintenance & Reliability, Projects)
> Drilling and Completions
. Develop Drilling and Workover programs for platform re-drills (mature
field) and Exploration wells
. Prepare and submit all Government and Environmental documentation
required for clearance to perform sidetracks and future exploration
wells
. Manage Exploration and Development budgets and projects
. Prepare basis of design for seven exploration wells from 6,500ft to
18,000 ft TVD
. Perform all necessary Engineering calculations for Drilling Programs
. Prepare AFE's for Development and Exploration Drilling
. Host DWOP sessions and Pre-Spud meetings
. Extensive Brownfield revitalization work via workovers, redrills, and
sand control ranging from stand alone screens, open and cased hole
gravel packing, pre packed and premium mesh screens repair on wells
with surface inclinations ranging from 15 to 35
. Casing exit methods via whipstock, pilot and section milling
. Casing string recovery
. Develop and manage Drilling and Workover Rig schedules
. Modify and upgrade slant workover rig to have the capability to Drill
. Work as Operations Drilling Engineer, Well site Engineer and Day
Drilling supervisor as required
. Well site Engineer for Niko Explorations wells
. Prepare and distribute daily Drilling Reports
. Perform daily well cost tracking
. Track project KPI's
. Conduct after action reviews
. Prepare load out lists and seven day look ahead
. Perform casing tallies
. Prepare section summaries and end of well reports
. Point of contact for service providers, EMA, MEEA and Petrotrin
. Convert existing Hydraulic artificial lift slant wells to HDESP, ESP
and PCP
. Participate in well reviews and locate alternative forms of artificial
lift to move away from hydraulic pumping and power oil system
. Develop cost tracker and project management handbook for Drilling,
Workover & Structural work
. Prepare tender packages for Drilling campaign services, Platform
Refurbishment and Inspections
. Negotiate Drilling service contracts and service orders
. Develop rig maintenance schedule
> Structural Engineering
. Develop SOW for Topside and Subsea inspections of Trintes platforms
that are +40 years old
. Develop SOW for refurbishment of Trintes platforms
. Perform Platform loading calculations for drilling package per well
location
. Perform structural assessment of platforms from results of inspections
alongside Engineering firm using SACS data
. Project manager and Engineer for Cathodic Protection retrofit using
retro pod design
. Repair three leaks on existing line to shore using split sleeve clamps
. Develop SOW for replacement of existing eight inch line to shore using
surveys, sonar and production forecast data
. Assist in Basis of Design (FEED) for green field development
. Develop Platform structural monitoring schedule for twenty five years
along with corrosion treatment and prevention plan (Topsides & Subsea)
> Maintenance and Facility Engineering
. Develop equipment maintenance procedures in accordance with API 14C
standard for facilities
. Fire and Gas system detection and suppression design for Brownfield
and tank farm
. Spec and procure LACT Unit for Tank farm
. Develop Civil, Electrical and Piping Scope of Works for installation
of LACT Unit
. Acquire approvals from joint venture partner and Ministry of Energy
for facility modifications and new equipment installations in
accordance with MOC process
. Design and execute communication upgrade for platforms and Tank farm
> General Duties
. Coach and mentor Junior Petroleum, Drilling and Maintenance Engineers
. Prepare AFE's and Budget forecast for Pipelines, Facility and Tank
farm upgrades
. Company representative at TAPS (Trinidad Association of Petroleum
Scouts), Ministry of Energy, Joint Venture and SPE meetings
. Member of Tenders and Contracts committee
. Prepare presentations and updates for Board of Directors, Joint
venture partners and Ministry of Energy
. Conduct training presentations to Finance, Procurement and Junior
Engineers
. Chairman of ICT (Information and Communications Technology) committee
. Act as OIM and production supervisor
October 2004 - May 2009
bpTT
Drilling & Completions Engineer
Liaise with 3rd party service providers, during all well program stages
Writing of the Drilling and Completion programs for wells from 8,000ft
to 20,000 ft TVD
Visiting the rig for pre-spud presentations and as operationally
required
Operations/Wellsite Engineer for Ibis Deep 25,500 ft Exploration well
Working within the drilling regulations and ensuring compliance with
both local regulations and the BP Value Assurance Framework and BP Well
Engineering Management System
Operational and Well Site Drilling Engineer during the drilling phase
Compilation and editing of the end of well report
Working with the Logistics team to ensure appropriate equipment
scheduling
Offset data reviewing for relevant wells
NPT tracking
Tracking of lessons learnt
Monitoring well progress and ensuring all relevant information is
tracked
Bit selection
Support for Senior Drilling Engineer and Senior Completions Engineer
QA/QC of tools: make-ups and testing
Define Statement of requirements for material and equipment as per API
and HSE standards
Completions program development - Open Hole Gravel Pack, Open Hole,
Stand Alone Screen, Cased Hole, Expandable Sand Screen Completions
Writing and co-presenting well progress updates to the management team
Compilation and editing of the end of well report
Communication on a regular basis with the Well Examiner
Raising PO requisitions for equipment and services negotiating with 3rd
party suppliers
Manage and update completions database
Perform Job Risk Assessments, Tool Box Talks, Safety Observation
Conversations and Job Safety Analyses.
Ensure planning, and execution functions to engage work teams during
projects
Writing morning reports
Writing and issuing 5 day look ahead
Maintaining EOWR daily summary
Updating well files, e.g. TVD monitoring, general well files, etc
Casing / liner tallies and space outs
Cement, displacement & test volume calculations
Witnessing pressure tests
Hydraulics and torque & drag modeling / analyses
Toolbox safety meetings
Implementing Drilling Supervisor's daily work instructions
General assistance to Senior Drilling Supervisor
[pic]
EDUCATION:
Currently Pursuing
. Project Management Professional (PMP) Certification
Chess Ltd College of Health, Environmental & Safety Studies
. NEBOSH certificate in Health and Safety
Pt. Lisas Safety Training
. PLEA Passport Induction and Emergency Training
July 2006 - September 2008
. Masters of Science Petroleum Engineering
September 2000- September 2004
. Bachelors of Applied Petroleum Engineering
[pic]TRAINING:
. DIMS/Open Wells Reporting & Well Plan
. RIMBase
. Advanced Drilling Techniques
. Corrosion Technology
. Well Control
. HSE Leadership
. Advanced Safety Audit
. Decision Making & Risk Analysis
. Task Based Risk Assessment
. Incident Investigation
. Rig Ops & Safety
. BP First level Leader Training
. Project Management ( BP )
. Asset Management
. QA Auditing
. Financial Management
. Well Intervention
. Well Production Performance
. Drilling Fluids
. Environmental Management
. Material Selection
. Root Cause Specialist training
. Training in Planning and Scheduling using Primavera Project Planner
. Basic Safety ( B.O.S.I.E.T Basic Offshore Safety Induction and Emergency
Training )
[pic]SKILLS MATRIX
Skill Type Product Skill Years Last
Level Experien Used
1=low, ce
10=high
Software Design - Android OS 8 2 Ongoing
Drilling applications and
Excel
Well Planning Well Plan 10 6 Ongoing
Stress and Strain Well Cat 9 6 Ongoing
Modeling
Drilling and Landmark EDM 9 6 Ongoing
Completions Design Suite
Planning Primavera Project 10 7 Ongoing
Planner, Maximo,
Microsoft
Projects
Fire Detection and Water CAD, Fire 8 6 Ongoing
Suppression CAD, AutoCAD
Documentation, Microsoft Office 10 17 Ongoing
Calculations,
Spreadsheet, Email,
etc
Data Analysis, CMAS 10 6 Ongoing
Trending, Modeling
Gravel Pack SandCade 8 6 Ongoing
Simulation
Drilling Operations FracCAT 9 6 Ongoing
Job Control
[pic]
References:
Mr. Francis Tang - TETCO Engineering Services Limited - Director -
Tel: 713-***-**** - Email: *******.****@***.*** / **************@*****.***
Mr. Alfred Ollivierra - Bayfield Energy - Consulting Petroleum Engineer -
Tel: 868-***-**** - Email: ******.**.**********@*****.***