Mr. Alfaouri is a graduate Civil Engineer with over 25 years of experience managing high profile critical infrastructure projects
in New York City. In his most recent capacity working as a Resident Engineer with the New York City Department of
Design & Construction (NYC DDC), Mr. Alfaouri has spearheaded and successful managed key construction projects
totaling over $55 million.
EDUCATION
BS Civil Engineering 1986
University of Texas, El-Paso, TX
COMPUTER SKILLS
MS Office (Word, Excel), MS Access, Visio
PROFESSIONAL EXPERIENCE
Dewberry Engineers Inc. Senior Inspector 2013 Present
Job Location: NYC West 61st Street between West End Ave. and Riverside South Blvd. & West 59th street and 69th street Building K
(EXTELL Development Company).
Inspection:
-reinforcement of tunnel footing, platforms, walls, and roofs
-steel piles and wood lagging
-storm and sewage sewer and backfilling
-HP concrete (5,000 PSI)
NYC Department of Design & Construction Resident Engineer 1996 – 2012
Resident Engineer providing Construction Management and Inspection services on Critical Infrastructure projects.
Manage team of Inspectors and Engineers; assign job-specific tasks to team members in the management of
construction; check Inspector’s daily reports and calculations. Enforce OSHA compliance, MPT and MUTCD
compliance, ADA standards compliance and compliance with contract documents and local and state construction
codes. Estimating change order cost and negotiating with Contractor on construction claims. Projects successfully
completed include:
Reconstruction of 54th Avenue between Maurice Avenue and 58th street including Street lighting and Traffic
work, Installation of Combined Box Sewers, Water main, Piles, and Highway construction (HWQP171-RR /
Cost $19 Million)
Construction of Storm Sewer and the Installation of Water Mains in 190th Street between 50th Avenue and
48th Avenue and 211th Street between 28th Avenue and 26th Avenue North Queens (SEQ200442 / Contract
Cost: $5 Million).
Page 1 of 3
Hani S. Alfaouri • 23 Toms Lake Rd • Wayne, NJ 07470 • 917-***-**** • **********@*******.***
Construction of Sanitary Sewers in 49th Street between Week Lane and Francis Lewis Boulevard between
49th & 50th Street. Installation of Water Mains in 49th Avenue between Week Lane and Francis Lewis Blvd.,
North Queens (SEQ002588 / Contract Cost $1 Million)
Reconstruction Riverdale Avenue Retaining wall at West 232nd Street. Reinforce concrete, tieback for
weather rock and pile for the retaining wall, water main 12” & 8”, storm sewer, sanitary sewer, roadway base
and sidewalk, curb, resurfacings and traffic makings (HWXPEMER1 / Contract Cost: $5 Million).
Emergency Reconstruction Retaining Wall at Astoria Blvd. and 104th Street (North Queens) Foundation,
reinforce concrete, storm sewer. (HWQPEMER1 / Contract Cost $201K).
Stabilization of Retaining Wall at 232nd Street and Riverdale Avenue in the Bronx. Temporary repair of
collapsed retaining wall has been completed. One N/B Traffic lane and open on Riverdale Avenue.
(HWXPEMER1 / Contract Cost $470K)
Grinding Existing Asphalt Concreter Wearing Course (Milling) contract when and where Manhattan and Bronx
(HW2CR99B / Contract Cost $6 Million).
Cross Bronx Expway. Exit Ramp to Major Deegan. sidewalk, curb, plant tree, catch basin, storm sewer.
(HWXX002MD / Contract Cost $293K)
NYC Department of Transportation Project Engineer 1988 – 1996
Project Engineer assigned to various highway construction projects. Projects successfully completed include:
Resurfacing/Hardware Adjustment Manhattan (HW2MR / Contract Cost: $852K).
Step Street and Retaining Wall at Henwood Place (HWX211T-1 / Contract Cost: $338K).
Step Street and Three Retaining Wall bet Grand Concourse and Walton Avenue. Storm sewer, and sanitary
sewers, reinforce concrete, sidewalk, roadway base.
Reconstruction of Gleason Avenue. Assigned Project Engineer equivalent to Engineer-In-Charge; Supervised
in-house Resident Engineer and 5 Inspectors; 40 block of storm sewer, sanitary sewer, water main, roadway
base, sidewalk, curb, street lighting, gas main, piles near Bronx River Parkway, planting tree, resurfacing
(HWX490 / Contractor Cost: $22 million).
Leroy Calendar, P.C., Consulting Engineers Field Engineer 5/88 – 10/88
Worked as Consultant Field Engineer for NYC DOT. Project covered boroughs of the Bronx and Manhattan and
involved construction of pedestrian ramps.
Infra Tech Associates Field Engineer 3/87 – 5/88
Worked on capital improvement projects involving highways and bridges for various New York State and City
Agencies. Assignments included: Technical data collection, Engineering Design, Traffic Planning Studies, Field
surveys and Construction Management.
Construction Civil Engineer for 11 Miles of roadway rehabilitation (Route 22) in Dutches County for New
York State Department of Transportation (Construction Cost: $2.5 Million).
Construction Civil Engineer and New York City Public Development Corporation (PDC) Projects for prior
Notification Sidewalk Construction in Bronx. Project covered entire Borough of Bronx and involved
performing field surveys and area layouts (Construction Cost: $3.5 Million)
Assistant Professional Engineer-Primary Design for Featherbed Lane Capital Project of the Public
Development Corporation (PDC)
2
Hani S. Alfaouri • 23 Toms Lake Rd • Wayne, NJ 07470 • 917-***-**** • **********@*******.***
STRENGTHS
Objective oriented and highly motivated personality.
Sou nd Background in Construction, Transportation, Traffic and Foundation Engineering.
Ava
REFERENCES
ilable upon request.
Page 3 of 3