JAMES W. KIRKENDALL
**** ***** **. **** *******, LA 70605 ● 337-***-**** ***********@***.***
Summary of Qualifications:
• Strong background in managing small projects within given deadlines
• Experienced in specific aspects of initial phases in project life cycle
• Energetic employee of proven work experience and ethics, with an analytical
m ind and excellent team working skills
Education
B.S. Civil Engineering, May 2012 Level 1 Certified
Acquisition
B.S. Electrical Engineering Technology, December 2002 Management, 2006
McNeese State University A ir Force Institute of
Technology
F.E. (EIT) - Louisiana, October 2011 - Passed TS/SCI Clearance
P rofessional Experience
2012- Present
Civil Engineering Project Manager Calcasieu
P arish Police Jury Engineers
L ake
C harles, LA
• Perform on-site inspections and evaluations of work to ensure compliance
w ith Parish, State, and Federal regulations, and sound engineering practices
• Develop, review, and update scope of work and cost estimates for assigned
projects
• Review, track, design, draft, and maintain plan designs and/or other related
engineering documents
• Redesigned an aluminum box culvert which resulted in a $33,000 savings
• Proficient in AutoCad Civil 3D 2013, HEC-RAS, HYDRWIN, ArcMap10
2011 – 2011 Lonnie
H arper and Associates
Engineering Intern
Bell City, LA
• On site inspector for 20 miles of new road construction with 100% safety
record
• Coordinated with geotechnical engineer for excavation depth required in
deficient soil areas to complete the project
• On-site inspector for 60 ' pre-fabricated Waskey bridge project with 100%
safety record
• Completed 30 day bridge project 7 days ahead of schedule
• Supervised 7-10 employees with no negative incidents
2009 – 2010
O il Quip, Inc.
E lectronics Technician
L ake Charles, LA
• Fabricated $250,000 interface control panel project
• Produced $60,000 specialized cable project
• Both projects completed with 100% safety record on schedule
2008- 2009 St. Louis
Catholic High School
Teacher /Coach
L ake Charles, LA
• Facilitated student learning in basic computer applications in Microsoft
Office -100% success rate
• Facilitated parent-teacher-student conferences for improved student
performance
• Assistant coach on Regional Championship varsity football team
• Fostered discipline, team work, individual achievement
• Tutored several players in Algebra, Geometry, Physics
2007 – 2008
Quadel
Grant Coordinator Baton
Rouge, LA
• Managed $750,000 in FEMA grants for 200 clients in recovery of funds and
documented deficiencies for post-Hurricanes Katrina and Rita allotment
claims
• Developed financial statements, basic business plans, financial plans and
budgets
• Made determinations for individual award amounts averaging $35,000 each
u tilizing policy and procedure set forth by the Federal Government and the
State of Louisiana
2004 – 2007 U nited States
Air Force
Test Engineer, Rank - 1 st L ieutenant H anscom Air
Force Base, Bedford, MA
• Led a $22 Million data acquisition test of developmental weapons system
w ith U.S. Defense contractors and a multi- branch personnel team over a 2
day period classified results
• Lead Purchasing Officer acquiring test equipment with $150K - $300K
average monthly expenditure
• Director of Operations - supervised three lieutenants and two enlisted
personnel
• Made statistical presentations to Generals/Officers and high ranking
government officials at the Pentagon regarding feasibility of developmental
weapon systems to be implemented into the field based on battle field
assessments during Operation Enduring Freedom