Post Job Free
Sign in

Engineer Civil

Location:
Calgary, AB, Canada
Posted:
May 09, 2013

Contact this candidate

Resume:

summary

Proficient in the design of SAGD pipieline, wellpads, CPF

associate facilities, Gas Plant projects as well as extensive

experience for commercial building structures employed wood,

concrete, steel and masonry.

Experience

2011 -Present Senior Structural/Civil Engineer, DPH Focus, Calgary

AltaGas Harmattan Gas Plant. 2012.7 ~ 2013.3 Lead engineer,

Dynamic analysi and design of new compressor foundation,

piperack expansion as well as design parameters preparation for

new bridge purchased through Armtec;

Manhours estimate and preparation of "scope of work change

2008 - 2011 notice" as required.

Petrobank May River THAI project. 2010.11 ~2011.9 Area 4 lead.

Performed Siemens steam turbine generator foundation study,

preparation of steam Congen building structural layout, pump skid,

exchanger tower and piperacks engineering. MTO for Piling & Steel

Senior Structural/Civil Engineer, WorleyParsons, Calgary

NEXEN LONG LAKE PAD12- Flowline pipe supports steel & pile

design

< Communication to Geotech engineers & lead engineer with

respect to pile set design parameters,

< Determine soil constant for pile design & build S-Frame model

to be used as template for pile analysis,

< Select a series of structures to suit typical ANCHOR or GUIDE

pipe supports based on the piping stress loads,( magnitude &

positions) as well as muskeg deposit depth.

Devon - Jackfish phase 2 Central Plant. Design engineer

responsible for area 1000 structures, which includes steam

gen building, piperacks and equipment modules.

< Construction support, answering RFIs from site,

< Building Permit signoff for all buildings on project; make

necessary trips to site to witness jobs done as per plan and

spec. report deficiencies and suggested remedy plans.

< Assist lead engineer to prepare standard drawings as well as

advise for design guidelines;

< Perform analysis as per new stress from piping engineers,

validate and make modifications to phase 1 based design for

all structures,

< Piles design for all associate structures,

< Redesign steam generator building BU1000 for adding one 10

ton bridge crane base on the phase one layout.

2006.3 - 2008 Intermediate structural/civil engineer, IMV Projects, Calgary

Encana - Christina Lake Commercial Plant Phase 1B.

Construction engineering support, answering RFI, prepare

deign and sketches for major changes.

< Providing engineering construction support, answer RFIs to

resolve conflicts from site

< Prepared DBM and manhour estimate for new scope of plant

expansion & renovation

< Prepared preliminary design for diluent pump skid design

CNRL - Promise East Plant. Skidded building and equipment

module design w/ the consideration of in-situ, transportation

& lifting senariors.

< Completed skidded Gas building design, consideration given to

skid to pile weld detail for 6 skids side by side during

installation.

Encana - E2007 Foster creek Offistes SAGD. Completed design

for 4 well pads and the associated modules and stick-built

steel as well as pile design.

2003 - 2006.2 Design Engineer, Prakash Engineering, Prince Albert, Saskatchewan

Federal goverment - Redevelopment of Saskatchewan

Penitentiary. Aug. 2005 ~ Feb, 2006. Completed preliminary

design for a group of 5 buildings employed masonry, steel,

conrete and wood. Assist chief engineer to prepared class C

estimate for project.

Client Name - Comuniplex Arena, Lobby Addition & Renovation.

Nov. 2004 ~ Feb. 2005 To reinforce the existing wood

structure after some columns being taking out to suit

architectural needs and connect the exiting wood structure to

new expansion, which is concrete floor and steel columns

construction.

< Provided Reinforcement solution after every 2nd existing

glulam columns being pulled out to suit architectural needs.

< Extensive detail design for the reinforcement of existing

columns, details between new and existing.

< Construction support, review scaffold arrangement, conduct

weekly site visit to ensure project to comply with plans and

specifications.

Projects listed below employee wood, steel, concrete or some

combinations. Analysis for most of these structures is aided

with S-Frame, Masonry design and Wood Works, as well as by

hand.

Trinity Mennonite Church Calgary Nov 2004 - May 2005

Elk Ridge Waskasiu Aug 2004-Nov 2004

Cosmo Lodge Jan 2004 - Apr 2004

Vincent Massey Community School Oct. 2003 - Feb. 2004

Education

Bachelor/Civil/Structural engineering /, Southwest Jiaotong

University (Chengdu, China), 1992

registrations/Affiliations

APEGGA

APEGS



Contact this candidate