Post Job Free
Sign in

Quality Assurance Engineer

Location:
Jizan, JZ, Saudi Arabia
Posted:
May 07, 2013

Contact this candidate

Resume:

[pic]

CURRICULUM VITAE

Name : MUHAMMAD FARRUKH ZAKI

Date of Birth : 7th February 1956

Marital Status : Married

Profession : Civil Engineer

Present Position : Resident Engineer

Specialization : Project Management & Construction Supervision of

Roads/Highways/pipeline /water treatment

plant /under ground dam/buildings related

Projects

Countries of Work Experience : Saudi Arabia, Oman, Pakistan & Bangladesh

Total Professional Experience : 29 Years

Work Experience in Gulf : 6 Yrs - 6 Months

Affiliation with Professional : - Member, Pakistan Engineering

Council

Institutions (Regd. #

Civil/6732)

- Saudi Council of Engineers (Regd. #

100095)

Driving License: : Oman, Saudi Arabia, Pakistan

KEY QUALIFICATIONS

Practicing professional Engineer since 1981.

- Construction Supervision of Roads / Highways / Buildings and

Infrastructure.

EDUCATION

Name of Institution Year Degree/Diploma

N.E.D. University of Engineering 1981 B.E. (Civil) Degree -

First Division

& Technology Karachi, Pakistan

EXPERIENCE (FROM PRESENT TO PAST)

1. Date: September 2012 till date (3rd April 2013)

Company: NESPAK, LOCATION: SAUDI ARABIA

Role held: Resident Engineer

Project: Construction Supervision of Sedimentation protection by Gabion

works upstream side of the Baysh dam and shadan dam, in jizan region,

Saudi Arabia.

Duties: I AM RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE

CONTRACTORS, CHECKING & PROCESSING CONTRACTORS' IPCs, PREPARATION OF

MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF EACH

CONTRACTOR, ADVISING THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE ANY OF

THE CONTRACTOR DID NOT COMPLETE THE PROJECT IN TIME,I AM SUPPOSED TO

RECOMMEND TO THE CLIENT ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC

CONDITIONS OF CONTRACT.

2. Date: March 20, 2012 to 27/7//2012

Company: Alishar construction company (Contractor FIRM)-Released by my

company to work for this contractor temporarily

Role held: Project Manager (site based), LOCATION: SAUDI ARABIA

Project Name: Water supply line 600mm DI pipes 49.8 km including 62

chambers from al-leeth dam to various cities, water treatment plant and

underground dam, SAUDI ARABIA)

Project Scope of Work: CONSTRUCTION OF pipeline 600 mm dia ductile irons

from dam near moa har area to al-leeth city 49.8 km

-construction of WTP with 2 clarifiers+teated water tank, distribution

chamber, pump house, administration building, SCECO building, etc.

3.

Date: July 2010 to-15/3/2012

Company: NESPAK (THE BIGGEST CONSULTANCY FIRM OF PAKISTAN-

www.nespak.com.pk)

Role held: RESIDENT ENGINEER

Project Name: BALADIA ROADS PROJECT, (IN RIYADH REGION SAUDI ARABIA)

Project Scope of Work: CONSTRUCTION OF NEW ROADS AND CULVERTS IN

JALAJIL,MAJMAA,AL-TAVIA,ROWDA SUDEER,HOWTA SUDEER AND TUMAIR

Value: 202 MILLION SAUDI RIYAL

Duties: RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE

CONTRACTORS, CHECKING & PROCESSING CONTRACTORS' IPCs, PREPARATION OF

MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF EACH

CONTRACTOR, ADVISING THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE ANY OF

THE CONTRACTOR DID NOT COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO

RECOMMEND TO THE CLIENT ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC/

CONDITIONS OF CONTRACT.

THERE WER 3 CONTRAACTORS WORKING IN THE 6 CITIES MENTIONED ABOVE.FOR SIX

CITIES I HAD 6 SITE INSPECTORS, 6 SURVEYORS,2 QS, 2 MIs (MATERILAS

INSPECTORS) 3 C.Es (CIVIL ENGRS OF MIN 8 YRS EXPERIENCE)

3.

Date: October 2009 - July 2010

Company: ITALCONSULT (AN ITALIAN CONSULTANCY FIRM)

Role held: RESIDENT ENGINEER, LOCATION: SAUDI ARABIA

Project Name: Altawal-Jazan-Shuqqaq Expressway, 130 Km long with 29 Bridges

and 6 interchanges

Project Scope of Work: CONSTRUCTION OF NEW EXPRESSWAY (DUAL CARRIAGEWAY 6

LANE HAVING 29 BRIDGES, 6 INTERCHNAGES, 84 PIPE CULVERS (1000 MM DIA), 46

BOX CULVERTS (FROM SINGLE BARREL TO 12 BARRELS)

Value: 600 MILLION SAUDI RIYAL

Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE

CONTRACTORS, CHECKING & PROCESSING CONTRACTORS' IPCs, PREPARATION OF

MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING

THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT

COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO RECOMMEND TO THE CLIENT

ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT.

IN THIS PROJECT A MAJOR PROBLEM WAS OBSTRUCTIONS LIKE ELECTRIC POLES,

HOUSES, CULTIVATED LANDS, GRAVEYARDS ETC.I WAS ALSO RESPONSIBLE TO RECEIVE

FROM THE CONTRACTOR GENERAL PLAN SHOWING SIZE (AREA) THE OBSTRUCTIONS,

CHECK ITS CORRECTNESS AND THEN FOR WARD TO THE MINISTRY OF TRANSPORT FOR

REMOVAL OF THE OBSTRUCTIONS THRU THE CONCERNED AGENCIES.

THE PROJECT PASSED THRU DESERTS, HILLS AND SABKHA AREAS ( SABKHA AREA IS A

SANDY DESERT WITH VERY HIGH WATER TABLE (SALTY) WHICH MAKES CONSTRUCTION

MORE DIFFICULT AS COMPARED TO NORMAL DESERTS.

AL THE BRIDGES HAD PRE-STRESSED CONCRETE GIRDERS OF 19.80 M LENGTH.THE

LARGEST BRIDGE WAS OF 200M LONG.ALL THE BRIDGES WERE ON PILE FOUNDATIONS.

4

Date: June 2008 - October 2009

Company: ITALCONSULT (AN ITALIAN CONSULTANCY FIRM)

Role held: RESIDENT ENGINEER, LOCATION: SAUDI ARABIA

Project Name: Majmaa-Shaqra expressway 96 km long, Riyadh region, Saudi

Arabia

Project Scope of Work: CONSTRUCTION OF NEW EXPRESSWAY (DUAL CARRIAGEWAY 12

PIPE CULVERS (1000 MM DIA), 6 BOX CULVERTS (FROM SINGLE BARREL TO 10

BARRELS)

Value: 165 MILLION, SAUDI RIYAL

Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE

CONTRACTORS, CHECKING & PROCESSING CONTRACTORS' IPCs, PREPARATION OF

MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING

THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT

COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO RECOMMEND TO THE CLIENT

ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT.

5

Date: January 2007 - May 2008

Company: NESPAK (CONSULTANTS)

Role held: PROJECT MANAGER (CONSTRUCTION),LOCATION: PAKISTAN

Project Name: construction supervision of ADB assisted NHA project CSP-2.

Hub-Uthal Road: 85 km

Multan-Muzaffar Garh Including Muzaffar Garh bypass) : Road 36.5 km

Sukkur -Jacobabad Road: 65 km

Project Scope of Work: CONSTRUCTION OF NEW ROADS AND CULVERTS AS PART OF

NETWORK OF NATIONAL HIGHWAYS IN PAKISTAN.

VALUE:75M USD

Duties: AS A PROJECT MANAGER (CONSTRUCTION SUPERVISION) I WAS RESPOSIBLE

FOR OVERALL MANAGEMENT OF THE WORK.NESPAK WAS THE LEAD CONSULTANT OF THE

JV OF 5 LOCAL CONSULTANTS.

. Also working as Proposal engineer for highway division of nespak

. Also coordinator for the 459 km road project in Balochistan (Basima-

Nag-Panjgur-Hoshab)

. Also coordinator for German SWAB road projects in Mansehra and

Abbott Abad.

6

Date: December 2006 - January 2007

Company: NESPAK (CONSULTANTS)

Role held: Deputy Team Leader, LOCATION: PAKISTAN

Project Name: construction supervision of ADB assisted NHA project CSP-2.

Hub-Uthal Road: 85 km

Multan-Muzaffar Garh Including Muzaffar Garh bypass) : Road 36.5 km

Sukkur -Jacobabad Road: 65 km

VALUE:75M USD

DUTIES: AS DEPUTY TEAM LEADER (CONSTRUCTION SUPERVISION) I WAS RESPOSIBLE

TO ASSIST THE TEAM LEADER IN CARRYING OUT HIS DURIES AS THE TEAM LEADER OF

THE PROJECT.HELPING OUT THE PM IN PREP OF MONTHLY REPORT, PROCESSING

CONTRACTOR'S IPCS.DEPLOYMENT OF SUPERVISION STAFF. ETC

7

Date: May 2006 - Dec 2006

Company: NESPAK (CONSULTANTS)

Role held: Senior Expat Contract Specialist, LOCATION: BANGLADESH

Project Name: 4 laning of Dhaka-Chittagong highway

VALUE:75M USD

Scope of work: construction of 2 additional lanes 189 km long for the

existing road from Dhaka to Chittagong including 36 bridges and 84 culverts

DUTIES: My duty was to prepare pre-tender documents like general conditions

of contract, technical specifications, BOQ

8

Date: JANUARY 2006 TO APRIL 2006

Company: NESPAK (CONSULTANTS)-LOCATION: OMAN

Role held: RESIDENT ENGINEER

PROJECT NAME: CONSTRUCTION SUPERVISION OF MAHOUT TO NIZWA - THUMRAIAT ROAD

(SECTION - II).

PROJECT SCOPE:

o 30 km new Asphalt Road

o 28 Nos. Box and Pipe Culverts (of variable cells)

The construction period was 12 months ended in April 2006.

VALUE: 45M USD

Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE

CONTRACTORS, CHECKING & PROCESSING CONTRACTORS' IPCs, PREPARATION OF

MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING

THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT

COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO RECOMMEND TO THE CLIENT

ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT.

9

Date: Sept 2004 - DECEMBER 2005

Company: NESPAK (CONSULTANTS)-LOCATION: OMAN

Role held: RESIDENT ENGINEER

PROJECT NAME: CONSTRUCTION SUPERVISION OF MAHOUT TO NIZWA - THUMRAIAT ROAD

(SECTION - III).

VALUE: 55M USD

PROJECT SCOPE:

o 41 km new Asphalt Road

o 23 km long Track Road to divert the traffic in case the road has to be

closed for traffic during routine practice session of Military.

o Construction of 2 km long Runway (where C-130 Aircraft would land with

2 Tanks on board)

o Tank Crossings: 4 tank crossings on the road.

Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE

CONTRACTORS, CHECKING & PROCESSING CONTRACTORS' IPCs, PREPARATION OF

MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING

THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT

COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO RECOMMEND TO THE CLIENT

ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT.

10

Date: July 2003 - September 2004

Company: NESPAK (CONSULTANTS)

Role held: PRINCIPAL ENGINEER, LOCATION:PAKISTAN

PROJECT NAME: QUAILY ASSURANCE AND PROPOSALS

PROJECT SCOPE: PREPARATION OF TECHNICAL AND FINANCILA PROPOSALS FOR HIGHWAY

PROJECT.PREP OF PRE-QUALIFICATION DOCUMENTS.QUALITY ASSURANCE OF ALL

DOCUEMTNS PREPARED BY CONTRAC SECTION (TECHNICAL SPECIFICATIONS, TENDER

DRAWINGS AND VILUNE-1 (GENERAL CONDITIONS OF CONTRACT)

DUTIES: As Principal Engineer Quality Assurance & Proposals (QA&P)

responsible for the preparation of proposals, quality assurance of

documents like Technical specifications of the Contract, TENDER

Drawings, Engineer's Estimate etc. Preparation of Expression of

Interest, writing Letters of Interest for projects in Pakistan and

abroad. Meetings with various Consulting Firms to form Joint Ventures

for projects etc.

11

Date: October 2000- July 2003

Company: NESPAK (CONSULTANTS)

Role held: SENIOR ENGINEER, LOCATION:PAKISTAN

PROJECT NAME: CONSTRUCTION SUPERVISION OF PUNJAB HIGHWAY PROJECT

SCOPE: GENERAL SUPERVISION OF ROAD, BRIDGES AND CULVERTS IN THE CENTRAL

PART OF THE PROVINCE OF PUNJAB IN PAKISTAN.THERE WERE 3 BRIDGES (2 OF

CONVENTIONAL CONCRETE GIRDERS AND ONE PRE-STRESSED)

VALUE: 6M USD

DUTIES: I WAS RESPOSIBLE FOR OVERALL QUALITY OF WORKS OF THE PROJECT AND

PROCESSING OF IPCs OF THE CONTRACTOR.

12

Date: Nov. 1998 to Sept. 2000

Company: NESPAK (CONSULTANTS)

Role held: Assistant Resident Engineer, LOCATION:PAKISTAN

PROJECT NAME: FARM TO MARKET ROADS

PROJECT SCOPE: Construction Supervision of ADB assisted Rural Access

Roads Projects over 100 Km long having over 125 No. Culverts, in

Pakpattan & Sahiwal Districts. This residency was spread over two

districts of South Punjab; Sahiwal and Pakpattan Sharif. Two roads were

in Sahiwal and the rest in Pakpattan Sharif.

VALUE:27M USD

DUTIES: I WAS RESPONSIBLE TO ASSIST THE RE IN QUALITY ASSURANCE OF

PROJECTS, IN PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND

MONTHLY PROGRESS REPORTS,COMPARING WORK DONE AGAINST THE CONSTRUCTION

SCHEDULE,LETTER DRAFT LETTERS ABOUT QUALITY OF WORKS TO THE

CONTRACTOR.CHECKING BAR BENDING SCHDULES FOR THE STRUCTURES.

13

Date: MAY1998 to NOV1998

Company: NESPAK (CONSULTANTS)

Role held: Resident Engineer, LOCATION:PAKISTAN

PROJECT NAME: Bridge over main Railway Track at Garhi Shahu, Lahore

PROJECT SCOPE: bridge 250m long with 500mm diameter piles, pre-

stressed girders 22m long, deck slab, approach slabs and 100 m road with

embankment on each side of the bridge.

VALUE: 15M USD

DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS,

PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY

PROGRESS REPORTS,COMPARING WORK DONE AGAINST THE CONSTRUCTION

SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE

CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY.

14

Date: Jan1995 to April1998

Company: NESPAK (CONSULTANTS)

Role held: Resident Engineer, LOCATION:PAKISTAN

PROJECT NAME: Fyzee Rahamin Art Gallery in Karachi

SCOPE: 3 STOREY BUILDING OF ART GALLERY & AUDITORIUM WITH SEATING CAPACITY

OF 1800 PEOPLE. IT WAS A CENTRALLY AIR CONDITIONED BUILDING.

VALUE: 5M USD

DUTIES:I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING

THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS

REPORTS,COMPARING WORK DONE AGAINST THE CONSTRUCTION SCHEDULE,WRITING

LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING SURE THAT THE

STAFF IS WORKING PROPERLY.

15

Date: Aug 1994 to Dec1994

Company: NESPAK (CONSULTANTS)

Role held: SENIOR Engineer (claim analyst), LOCATION:PAKISTAN

PROJECT NAME: Evaluation of claims for Korangi Fisheries and Harbor

Authority

SCOPE: Evaluation of claims for Korangi Fisheries and Harbor Authority,

Karachi 380 million Pakistan rupees claim. There was disagreement

between the Contractor and the Consultant about the recommendations of

the Consultants. So NESPAK (the biggest Pakistani consultant were hired

to give final recommendations. I was assigned this task.

Duties: My duty was to do the job single handedly,

I completed the job and was accepted by the concerned parties.

16

Date: June 1992 to July 1994

Company: NESPAK (CONSULTANTS)

Role held: SENIOR Engineer Construction, LOCATION:PAKISTAN

PROJECT NAME: Development of 2 new tows near Karachi (NORTH KARACHI AND

SURJANI TOWN) OF KARACHI DELEVOPMENT AUTHORITY

SCOPE: CONSTRUCTION OF MORE THA 100 KM LONG ROADS & 21 CULVERTS, WATER

SUPPLY, SEWERAGE AND 1000 FLATS*APPARTMENT (4 STOREY)

VALUE:3.5M USD

DUTIES: MY DUTY WAS TO SUPERVISE THE CONSTRUCTION FROM QUALITY POINT OF

VIEW AND PROCESSING OF CONTRACTOR IPCs,

17

Date: Jan1991 to May1992

Company: NESPAK (CONSULTANTS)

Role held: Resident Engineer, LOCATION:PAKISTAN

PROJECT NAME: Headquarters Building Pakistan Medical & Dental Council at G-

10/4 Islamabad, and Ware House of duty Free shops in I-11/4 Islamabad.

SCOPE: 3 STOREY BUILDING WITH CENTRAL AIRCONDITIONING SYSTEM.

VALUE:3.0M USD

DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING

THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS

REPORTS,COMPARING WORK DONE AGAINST THE CONSTRUCTION SCHEDULE,WRITING

LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING SURE THAT THE STAFF

IS WORKING PROPERLY.

18

Date: Jan 1989 to Dec1990

Company: NESPAK (CONSULTANTS)

Role held: SENIOR Engineer Construction, LOCATION:PAKISTAN

PROJECT NAME: Construction Supervision of Pak - Suzuki Plant near Karachi

SCOPE: PAK SUZUKI MOTOR'S PLANT COMPRISING THE PLANT, WATER TANKS, MOSQUE,

THE MAIN PLANT HAD ROOFING OF PRE-CAST PLANKS RESTING ON STRUCTURAL STEEL

TRUSSESS RESTING ON RCC COLUMNS.

DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING

THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS ON

BEHALF OF THE RE,COMPARING WORK DONE AGAINST THE CONSTRUCTION

SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING

SURE THAT THE STAFF IS WORKING PROPERLY.

19

Date: Jan1988 to Nov1988

Company: NESPAK (CONSULTANTS)

Role held: SENIOR Engineer, LOCATION:PAKISTAN

PROJECT NAME: CONTRACT PREPARATION CELL

SCOPE: PREPARATION OF CONTRACT DOCUMENTS (TECHNICAL SPECIFICATIONAS AND THE

GENERAL CONDITIONS OF CONTRACT) FOR ROADS AND BUILDING PROJECT.

DUTIES: I WAS RESPOSIBLE FOR PREPARATION OF CONTRACT DOCUMENTS AND SUBMIT

TO THE PRINCIPAL ENGINEER

20

Date: Feb1987 to Dec1987

Company: NESPAK (CONSULTANTS)

Role held: SENIOR Engineer Construction, LOCATION:PAKISTAN

PROJECT NAME: CONSTRCUTION OF NATIONAL STADIUM KARACHI FOR WORLD CUP

CRICKET 1897

SCOPE: CONSTRUCTION OF NEW GENERAL ENCLOSURE, CLUB ENCLOSURE AND STUDENTS'

ENCLOSURE WITH ROOF.ROOF WAS OF PRE-CAST PLANTS PLACED ON STRUCTURAL STEEL

TRUSSES PLACED ON STELL COLUMNS ON FIELD SIDE AND RCC COLUMNS ON THE OUTER

SIDE.

VALUE:5M USD

DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING

THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS ON

BEHALF OF THE RE,COMPARING WORK DONE AGAINST THE CONSTRUCTION

SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING

SURE THAT THE STAFF IS WORKING PROPERLY

.

20:

Date: 1985 to jan1987

Company: NESPAK (CONSULTANTS)

Role held: SENIOR Engineer Construction, LOCATION:PAKISTAN

PROJECT NAME: Construction Supervision of Road from Star Gate to Karachi

Airport

SCOPE: CONSTRCUTION SUPERVISION OF ROAD AND CULVERTS FROM STAR GATE ON MAIN

NATIONAL HIGHWAY TO THE TERMINAL 3 OF KARACHI AIRPORT.

IT WAS WATER BOUND MACADAM ROAD WITH BINDER COURSE AND WEARING COURSE.

VALUE:0.55M USD

DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING

THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS ON

BEHALF OF THE RE,COMPARING WORK DONE AGAINST THE CONSTRUCTION

SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING

SURE THAT THE STAFF IS WORKING PROPERLY

21:

Date: 1981 to 1985

Company: NESPAK (CONSULTANTS)

Role held: JUNIOR Engineer (construction)

PROJECT NAME: Main Access Roads (asphalt concrete) from National Highway

to Port Bin Qasim including Bridges and Culverts. Thickness of binder

course was 40 mm and that of wearing course 40 mm.THERE WERE 2 BRIDGES OVER

MAIN RAILWAY TRACK.BOTH WITH PRE-STRESSED GIRDERS.ONE WAS SKEW AND OTHER

STRAIGHT.ONE WAS 80M LONG AND THE OTHER WAS 91M LONG.

CULVERTS WERE OF 2 BARRELS TO 14 BARRELS.

DUTIES: AS JUNIOR ENGINEER MY DUTIES WERE TO ASSIST THE SENIOR ENGINEER IN

CHECKING THE REINFORCEMENT STEEL OF BRIDGES AND GIRDERS AND THOSE OF

CULVERTS,ALSO COMPACTION OF SUB-BASE AND BASE CORSE LAYERS.

CONTACT: Cell : +966-*********

E-mail : ********@*****.***

LANGUAGE CAPABILITY

English - Excellent in speaking, reading and writing

Arabic - Fair in speaking

Urdu - mother language

Bengali - Excellent in reading, writing and speaking (I was born

in Bangladesh and brought up there till the age of 14)

Dated: 02 MAY, 2013 [pic]



Contact this candidate