Adi Anom Sasongko
Indonesian, Birth May **th, ***1, Married
Jl. Swadaya IV No. 52. RT 10/11, Cijantung, Pasar Rebo, Jakarta Timur.
Indonesia, 13770.
Mobile: +628**********, Home: +622********
UAE Mobile: +971*********
Mail: ***************@*****.***
CAREER SUMMARY:
Professionals specialized in Drilling & Completion Fluids, with nearly 8
years of comprehensive oilfield experience in off-shore and on-land
drilling. Currently works as Mud Supervisor in Abu Dhabi Company for
Onshore Oil Operation, Abu Dhabi, UAE.
PROFESSIONAL EXPERIENCE:
July 2012 - Present: Abu Dhabi Company for Onshore Oil Operation (ADCO) -
UAE
Mud Supervisor (Drilling & Completion Fluids)
Under Drilling Technical department, provide supervising role of all
related Drilling and Completion Fluids in ADCO Rig's. Implementing and
Optimize drilling and completion fluids as per well program that can
improve well quality and reduce well time and cost. Monitor and maintain
mud properties during drilling. Planned and managed all Drilling and
completion fluids Chemicals, equipment and personnel movement for smooth
operation. Liaise with mud contactor representative and sub-contractors.
Recommend the proper use of all solids control equipment. Generate ADCO mud
report and recaps. Ensure HSE and waste management implementations are in
accordance with company policy. Experience in drilling Horizontal well, ERD
(horizontal section up to 9000 ft), depleted and fracture formation,
aerated drilling, H2S wells. Workover operation, etc.
July 2006 - July 2012: Halliburton Energy Services, Baroid - Indonesia
Field Professional I - Drilling Fluids (Mud Engineer)
Providing service supports to Halliburton Baroid. Provide Drilling Fluids
technical expertise in Drilling Site with particular system. Proficient in
Water Base, Oil Base and Completion Fluids system, all includes building,
maintain and troubleshooting. Performed regular fluids check on site.
Generate Drilling Fluids daily report and realize end of well recaps.
Performed real time/drill ahead hydraulic on well and hole cleaning
analysis. Pit management, fluids material & equipment inventory and cost
management on site.
Experience in HTHP drilling, high deviated wells, Optislim wells, H2S and
exploration wells. Extensive experience in wells with gravel packs
completion (Single Trip Multi Zone). Well clean up sequence using clean up
pills train. Building filtered completion fluids (KCl and NaCl). Supervise
filtration unit operation (Centrifugal Pumps, Slurry Kit, DE Press, Twin
Pod unit). Gravel pack pumping operation, etc.
In addition, I also have experience in Waste Management Operation when
serve a multi-purposes role for Baroid Surface Solution as rig site
supervisor and Waste Treatment Technical Support in Pendingin Ground
Control Base (Thermal Desorption Unit and Water Treatment Plant). Generated
Surface Solution & Waste management daily report (waste stream, Ave. ROC,
equipment performance, cost, etc) and realize end of well recaps.
May 2005 - June 2006: PERTAMINA Drilling Services Indonesia (PDSI)
Drilling Engineer Jr.
Provide services in Rig contractor and IPM services, I provide Drilling
Engineering technical assistance to Sr. Drilling Engineer and reports to
Project Manager of Suban Field Development, South Sumatra, Indonesia in a
Drilling Integrated Project Management (IPM). The role includes drilling
program preparation. Pore pressure prediction and analysis along with
operators G&G department, casing setting depth, drilling fluids and
hydraulic design, casing selection and cementing design, BHA & trajectory
design, Bit selection, to Rig sizing and selection and assist in well AFE
preparation. Exposed to Indonesian procurement system, assist in logistic
preparation and tender execution, liaison with operator representative and
sub-contractors. Land Rig operation and supervision proficiency, thru day
to day supervision of Suban field IPM wells (off/on site), well cost
monitoring, delivers daily drilling reports, realizes end of well reports
(includes NPT and lessons learned). Experiences in special drilling
operation and problems such as: freeing mechanical stuck pipe (Work on
pipe, FPIT run) to back-off operation (colliding tool run), fishing job,
plug cementing, uncontrolled deviation, drilling side track, hole pack off
and ballooning.
EDUCATION
1999-2004: Bachelors of Engineering, Petroleum
University of Pembangunan Nasional (UPN) "Veteran" Yogyakarta, Indonesia
2002-2003: Diplomas of Science, Management of Information
AMIKOM, Yogyakarta, Indonesia.
TRAINING & CERTIFICATIONS
H2S Training, Abu Dhabi, UAE, 2013
Stuck Pipe Prevention Course, Abu Dhabi, UAE, 2012
Baroid Block I Training, Houston TX, USA, 2010
T-BOSSIET, Cilegon, Indonesia, 2010
H2S Safety Training, Jakarta, Indonesia, 2009
Deep Water Technology course, Balikpapan, Indonesia, 2008
IADC Well Control Accreditation Program (WellCAP), Supervisory Level,
Balikpapan, Indonesia, 2007
Solids Control and Waste Management Training, Balikpapan, Indonesia, 2007
Fire Fighting Training, Balikpapan, Indonesia, 2007
Baroid Integrated Fluids Training I, Balikpapan, Indonesia, 2006
Baroid Drilling Fluid Graphics & Wellsight 2000 Software Training,
Balikpapan, Indonesia, 2006
Baroid "Mud School", Balikpapan, Indonesia, 2006
HUET & Sea Survival training, Cilegon, Indonesia, 2006
ADDITIONAL INFORMATION:
Computer proficiency: MS Office application (Word, Excel, PowerPoint),
BASIC Visual Programming, Baroid drilling fluids software (Wellsight 2000 &
Drilling Fluids Graphics), Drilling Planning Software (PDSI drilling
engineering software), etc.
REFEREES
Ade Nasution, Performance, Development and Competency (PDC) Coordinator,
Baroid Indonesia, Halliburton Energy Services Indonesia
***.********@***********.***
Irawan Nugroho, Chief of Drilling, Upstream Tech. Center, PT Pertamina
(persero), Indonesia
Phone: +62-21-350**** ext 1526, ********@*********.***
FIELD EXPERIENCE
Company, Rig, Description Issues Year
Well, Location
ADCO, Abu Dhabi, Mud Supervisor - Spud Drilling depleted and 2012 -
ND-56 Rig, ND-53 Mud, Polymer mud, fracture formation. Present
Rig, ND-38 Rig, KCl/PHPA//Glycol, OBM Long Horizontal
ND-55 Rig (MI Megadril, (ERD), Formation
Versadrill), NDF, losses, Aerated
Completion brines (KCl, Drilling, stuck pipe,
NaCl, CaCl2) H2S well. Workover
operation
TOTAL E&P Mud Engineer - HTHP, ELA, Optislim, 2010 -
Indonesie - APD KCL/Polymer, LT-OBM High Deviaton, 2012
Raissa #103 Rig, (Enviromul), Wash Train Formation Losses,
Transocean (well clean up), KCl Pack off, Ballooning,
Hibiscus Rig, APD Brine, Completion & Gumbo, High Torque &
Raisis #102 Rig, Packer Fluid Drag, Reactive
East Kalimantan formation, Gravel
Pack Operation.
Permata Intl. - Mud Engineer Reactive Formation, 2010
APD 02 Rig, -KCl/PHPA/Polymer/Glycol Tight Hole
Indramayu
MEDCO E&P Mud Engineer - Flocculation, 2009
Indonesia - EMSCO Native mud, Ballooning, Gumbo,
Rig, DRECO Rig, KCL/PHPA/Polymer, NaCl Partial Loss, H2S
South Sumatera Brine well
TOTAL E&P Baroid Surface Solution Rig site waste 2007 -
Indonesie - (BSS) Rig Site management, Rig 2009
Searex IV,Maera, Supervisor equipment maintenance
Yani, Raissa, & troubleshooting.
Hibiscus, Raisis High ROC of drilled
#102, East cuttings.
Kalimantan
TOTAL E&P Baroid Surface Solution High COD & Oil 2007
Indonesie - BSS (BSS) Waste Treatment Content of slop water
Pendingin Ground Engineer on MBF unit & water
Control Site, treatment plant, High
East Kalimantan ROC of untreated
cutting
MEDCO E&P Mud Engineer - Flocculation, 2007
Indonesia - SPA KCL/PHPA/Polymer Ballooning, Gumbo,
10 Rig, South Partial Loss
Sumatera
VICO Indonesia - Mud Engineer - Depleted sand 2006
APD 10 Rig, East OBM - Enviromul drilling, Partial
Kalimantan losses
VICO Indonesia - LMP Lab Support - OBM treatment and 2006
Saliki Liquid Mud OBM - Enviromul recondition from the
Plant Rigs
PT. Pertamina EP Drilling Engineer Jr. Exploration wells, 2005 -
- PDSI N110-M3 Stuck pipe, back-off 2006
Rig, South pipe, fishing job,
Sumatra, plug cementing,
Indonesia uncontrolled
deviation, drilling
side track, hole pack
off, formation
ballooning.