No. **, Rajakkal vill & post,
M.MANIMARAN Melpatti road,
E - Mail: **************@*****.*** Gudiyattam circle,
Mobile : +91-994******* / +91-948******* Vellore District.
V Career Objective:
To become a leading professional in water and waste water treatment
field by implementing my technical skills and by facing the challenging
tasks.
V Qualification:
Diploma in Instrumentation and control Engineering (61%)(2009) from
Tamilnadu, Directorate of Technical Education Chennai.
Institution: KAR polytechnic College, Ambur.
V Professional Experience:
o UEM India Pvt. Ltd.,
o Designation : Technician(instrument&process)
o Duration : 1.5.2009 to 30.4.2011
V LOCATION & CAPACITY :
Periyavarigam CETP Periyavarigam, Vellore dt (2.4 MLD, Tannery
effluent. treatment by Membrane Bio Reactor and Reverse Osmosis)
o Naik environmental Engineers pvt ltd, Mumbai.,
o Designation : SERVICE ENGINEER
o Duration : 2.5.2011 to 30.4.1012.
V LOCATION & CAPACITY :
Anywhere in India and Foreign country also New sewage treatment
plant Installation and commissioning ( Various capacity and various
location)
o Enzotech solution pvt ltd .,
o Designation : Officer service department
o Duration : 02.05.2012 to till date
V LOCATION & CAPACITY :
Anywhere in India Responsible for Erection and Commissioned of ETP,
STP, WTP and WWTP more than 20 plants around in India
JOB RESPONSIBILITIES:
. Deftly prepared new SOPs & modification of the existing ones in sink with
modifications/ Changes in plant operational logic,
. Efficiently managed production planning & control thereby ensuring strict
adherence to the time schedule, quality standards & total productivity
maintenance whilst achieving pre-set production target,
. Maintainence and calibration of on line instruments like ABB,Forbes
Marshall, modicon plc relay logic,
. Assumed independent charge of running of shift with the production team
and troubleshooting where it requires by appropriate ways.
. Conducted the verification of external Validations and Calibrations
Certificates and reports,
. Involved in startup & shutdown procedures, SCADA operation including
simulations as & when required and monitoring water quality, their
respective deviations,
. Prepared shift schedules for the resources, coordinated the plant
maintenance, issued critical work permits and ensured the work is carried
out on time
. Regularly prepared MIS and updated the same time to time; process
calculations,
. Spearheaded efforts in planning and managing the operation of entire
Water Solution System in the plant,
. Involved in troubleshooting and prompt response to any machine downtime
in Water Solution System,
. Identified the critical parameters stages of the process; Controlling,
monitoring & steering the critical identified process parameters,
. Ensured the integrity of the system by implementing and adhering to all
company policies and HSE practices,
. Provided support production line in terms of supplying Purified Water,
Water Solution and Waste Water System ensuring quick response times,
. Infused new technology innovations, motivation, manufacturing efficiency
and quality. Acted as mentor in providing leadership, guidance and
strength to subordinates,
. Deftly implemented Good Manufacturing Practices (GMP), Good Document
Practices (GDP), ISO 9000 standards,
. Ensured solutions equipments are in top performance by ensuring proper
systems operation, preventive maintenance and solution system health
checks.
. Proactively coordinated with the technical centre and key learning plant
to solve problems and upgrade the process; Implement the changes to
enhance the process capability,
. Identified process problems in a proactive manner, to ensure that there
is no stoppage of the production process,
. Headed the production process for smooth running of the plant and to
change the process variable in order to give optimized results,
. Responsible for Erection and commissioning of ETP, STP, WTP, WWTP plants.
. Commissioned more than 20 ETP, STP, WTP and WWTP plants,
. Pro- active communication between client and the organization,
. Responsible testing installation and commissioning of online variable
Instruments,
. Preparing data sheets such as cable layouts T block location,
. Received three applaud testimonials from three organizations,
. Having good knowledge in Electrical and Mechanical departments,
. Ensuring safety and out people working in and for our company.
V Core Competencies:
( Project Management (Preparation of process data sheets (
Troubleshooting of Process problems & process variable
instruments ( Plant startup & shutdown operations ( Planning & Scheduling
( Cross-functional Coordination
V PASSPORT DETAILS:
Pass port no : j3098875
Issued on : 10/01/2011
CURRICULUM VITAE
Name : M.MANIMARAN
Father's Name : Mr. G.Murugesan
Date of Birth : 02-03-1988
Age : 25 Years
Gender : Male
Nationality : Indian
Religion : Hindu
Address for
Communication : No. 86, Rajakkal vill & post, Melpatti road,
Gudiyattam circle, Vellore District, 635 805.
DECLARATION
I here by declare that the above informations furnished are
true to the best of my knowledge.
Place: Ambur yours
truly,
M.MANIMARAN