V Career Objective:

To become a leading professional in water and waste water treatment

field by implementing my technical skills and by facing the challenging

tasks.

V Qualification:

Diploma in Instrumentation and control Engineering (61%)(2009) from

Tamilnadu, Directorate of Technical Education Chennai.

Institution: KAR polytechnic College, Ambur.

V Professional Experience:

o UEM India Pvt. Ltd.,

o Designation : Technician(instrument&process)

o Duration : 1.5.2009 to 30.4.2011

V LOCATION & CAPACITY :

Periyavarigam CETP Periyavarigam, Vellore dt (2.4 MLD, Tannery

effluent. treatment by Membrane Bio Reactor and Reverse Osmosis)

o Naik environmental Engineers pvt ltd, Mumbai.,

o Designation : SERVICE ENGINEER

o Duration : 2.5.2011 to 30.4.1012.

V LOCATION & CAPACITY :

Anywhere in India and Foreign country also New sewage treatment

plant Installation and commissioning ( Various capacity and various

location)

o Enzotech solution pvt ltd .,

o Designation : Officer service department

o Duration : 02.05.2012 to till date

V LOCATION & CAPACITY :

Anywhere in India Responsible for Erection and Commissioned of ETP,

STP, WTP and WWTP more than 20 plants around in India

JOB RESPONSIBILITIES:

. Deftly prepared new SOPs & modification of the existing ones in sink with

modifications/ Changes in plant operational logic,

. Efficiently managed production planning & control thereby ensuring strict

adherence to the time schedule, quality standards & total productivity

maintenance whilst achieving pre-set production target,

. Maintainence and calibration of on line instruments like ABB,Forbes

Marshall, modicon plc relay logic,

. Assumed independent charge of running of shift with the production team

and troubleshooting where it requires by appropriate ways.

. Conducted the verification of external Validations and Calibrations

Certificates and reports,

. Involved in startup & shutdown procedures, SCADA operation including

simulations as & when required and monitoring water quality, their

respective deviations,

. Prepared shift schedules for the resources, coordinated the plant

maintenance, issued critical work permits and ensured the work is carried

out on time

. Regularly prepared MIS and updated the same time to time; process

calculations,

. Spearheaded efforts in planning and managing the operation of entire

Water Solution System in the plant,

. Involved in troubleshooting and prompt response to any machine downtime

in Water Solution System,

. Identified the critical parameters stages of the process; Controlling,

monitoring & steering the critical identified process parameters,

. Ensured the integrity of the system by implementing and adhering to all

company policies and HSE practices,

. Provided support production line in terms of supplying Purified Water,

Water Solution and Waste Water System ensuring quick response times,

. Infused new technology innovations, motivation, manufacturing efficiency

and quality. Acted as mentor in providing leadership, guidance and

strength to subordinates,

. Deftly implemented Good Manufacturing Practices (GMP), Good Document

Practices (GDP), ISO 9000 standards,

. Ensured solutions equipments are in top performance by ensuring proper

systems operation, preventive maintenance and solution system health

checks.

. Proactively coordinated with the technical centre and key learning plant

to solve problems and upgrade the process; Implement the changes to

enhance the process capability,

. Identified process problems in a proactive manner, to ensure that there

is no stoppage of the production process,

. Headed the production process for smooth running of the plant and to

change the process variable in order to give optimized results,

. Responsible for Erection and commissioning of ETP, STP, WTP, WWTP plants.

. Commissioned more than 20 ETP, STP, WTP and WWTP plants,

. Pro- active communication between client and the organization,

. Responsible testing installation and commissioning of online variable

Instruments,

. Preparing data sheets such as cable layouts T block location,

. Received three applaud testimonials from three organizations,

. Having good knowledge in Electrical and Mechanical departments,

. Ensuring safety and out people working in and for our company.

V Core Competencies:

( Project Management (Preparation of process data sheets (

Troubleshooting of Process problems & process variable

instruments ( Plant startup & shutdown operations ( Planning & Scheduling

( Cross-functional Coordination

V PASSPORT DETAILS:

Pass port no : j3098875

Issued on : 10/01/2011

CURRICULUM VITAE

Name : M.MANIMARAN

Father's Name : Mr. G.Murugesan

Date of Birth : 02-03-1988

Age : 25 Years

Gender : Male

Nationality : Indian

Religion : Hindu

Address for

Communication : No. 86, Rajakkal vill & post, Melpatti road,

Gudiyattam circle, Vellore District, 635 805.

DECLARATION

I here by declare that the above informations furnished are

true to the best of my knowledge.

Place: Ambur yours

truly,

M.MANIMARAN