Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Tampa Bay, FL
Salary:
$100k
Posted:
May 14, 2013

Contact this candidate

Resume:

JOSE F. LUEVANOS, EIT

**** ******** ***, ****** *****, Fontana, CA, 92336

Phone (909) 251 - 4024

***-****

abu3jb@r.postjobfree.com

BASIC INDUSTRIAL Los Angeles (February 2009 – Present)

Director of Engineering

HOK - MIDDLEBROOK + LOUIE STRUCTURAL ENGINEERS San Francisco

Now Pannu-Larsen-McCarthy Structural Engineers www.plmse.com

(November 2007 December 2008)

Two Parking Garage buildings for the New Doha International Airport (State of Qatar)

Four story reinforced concrete buildings, with fabric roofs, lobbies, connecting tunnel

and exterior access ramps

Bus and Taxi Pavilion

Curved steel roofs with large cantilevers

Concourse C passenger’s terminal

Steel and concrete structures and arches

Ritz Carlton Napa Valley

Reinforced concrete two-way slabs boulevard for automobiles and trees

RASKIN ENGINEERING, INC. Ontario, CA. (June 2004 November 2007)

RESPONSIBILITIES

Consistently delivered superior structural projects and services, within strict deadlines and budgets, with

efficient/innovative solutions that meant substantial savings in construction costs and simplified

constructability.

Performed calculations, analyzed models, designed-detailed buildings and various structures, using state-

of-the-art design technology and software tools or

Teamed on defined tasks under the close supervision of a senior engineer.

Opened physical archives for the projects documentation, electronic archives, billing and tracking files on

the network among other administrative tasks.

Coordinated work with architects and engineers of other disciplines; reviewed plans and geotechnical

reports, the conceptual projects and their restrictions, the specifications for compliance with industry

codes, standards and guidelines.

Evaluated projects concept and selected the appropriate structural system and engineering alternatives.

Gleaned pertaining information, codes of compliance, amendments and regulations from The City of

jurisdiction for all projects.

Kept in touch with clients to establish their needs to discuss design issues and to inform them about the

progress.

Prepared report-writing calculations package with explanatory criteria, loading, materials, legacy reports,

specifications, computer models and graphics.

Drew engineering plans, or reviewed others drawings.

Immediately solved any conflicts and questions arising during construction helping in eliminating costly

delays.

Responded in writing to RFIs from the subcontractors and to the plans check engineer comments.

Visited sites to ensure conformity to design specifications and to take pictures.

Prepared bills of quantities of structural materials for the requested projects.

Other duties as assigned.

PROJECTS

Industrial and office building, to produce glass strand in The Kingdom of Bahrain. Three-story bolted and

welded steel structure that supports winding & bushing machines, control cabinets, heavy units, water

storage tanks, pumps, piping and furnaces at ground level. Shapes are Universal Beams (SI units).

Similar four-story building, steel structure (metric system of units) in Russia.

The City of San Bernardino Courthouse, seismic rehabilitation, CA.

Webtrend, Printing Press foundation, Ontario, CA.

Architerra Residence 5007 Via Verde, Alta Loma, CA

Mardesichs Residence in Scenic Dr. Oakland, CA.

The Ditmores Residence Deck, light gauge framing, Ventura, CA.

Steve & Linda Tenbrink, 4185 Chadbourne Rd, Buttler foundation, Fairfield, CA

Global Self Storage, (5) 50 ft x 95 ft canopies, Victorville, CA.

RC Construction, RV Storage, (47) 11x40 canopies + (34) 14x50 enclosed East side of Locust Ave. and

South side of Vinyard, Ave, Rialto, CA.

Camano Heathed Self Storage, (4) two-story buildings, Camano Island, WA.

Lake Kitsap BNR Development, Heathed Storage Facility, Bremerton, WA

Seven Hills Mini Storage, postensioning slab foundation, Henderson, NV. Post-tensioning Institute

method for high expansive soils.

Three-story building, Lockaway, Downtown, Ontario, CA.

Storage facilities: West Durango, Clark County, NV Stadium, North Las Vegas, NV Superior, Roseville,

CA - Mac Road, Sacramento, CA - Gateway RV, Desert Hot Springs, CA - Cubbie Hole, Escondido, CA

Beaumont, Beaumont, CA - Midway Mini, Lakeside, AZ - Amargosa, Victorville, CA - Able III Bradley

Rd, Sun City, CA - Extra Space of Antelope, Sacramento, CA - Camp Pendleton, Camp Pendleton, CA -

Thomas Ave., Phoenix, AZ - Academy View Storage, (3) buildings and canopies, Colorado Springs, CO.

Fall Protection/OSHA policies, 22845 E. Savi Ranch Pkwy, Yorba Linda, CA.

Top Flight Industries, Inc, Storage Racks/Railing systems, City of Industry, CA.

Plastic Engineering Technologies LCC, Concrete Mat foundation for condenser unit, 4502 Brickell

Privado, St, Ontario, CA.

Pneumatic scrap paper recycling conveying sys., 5401 E. Jurupa St. Ontario, CA.

United Partition Systems, aluminum modular structures in CA and AZ: BMWJLS Enterprises, Coca Cola

Granite Distribution, Pentair Pools, Crown Enterprises, The Port of San Francisco, P&O Cold Logistics,

Guntert & Zimmerman, Gentec, Irvine Biomedical.

Doty Bros., Steam Storage Canopy, 11232 Firestone Blvd. Norwalk, CA.

Andresen Architecture, Nandina Self Storage, 17391 Moreno Valley, CA.

Tilt-up concrete Nandina Business Park, Industrial and Retail Center.

ABC Sheet Metal, UC Santa Barbara Parking Faade Screen, Santa Barbara, CA.

Saticoy citrics, flat reinforced concrete slab floor, Saticoy, CA.

Nissin Foods, freestanding steel mezzanine in Gardena, CA.

Special steel moment frames, using HSS shapes and diamond plate; shallow foundation.

Mountainview Power Plant, 2292 San Bernardino Ave, City of Redlands, CA miscellaneous steel

structures, maintenance building canopy, warehouse canopy, parking canopy w/solar panels, control

room, water storage tanks.

Tilt-up concrete Commercial Lofts LLC, Las Vegas, NV.

Sheraton Ontario Airport, Ontario, CA

Lake Gregory Amusement Park, waterslides retrofit, Crestline, CA.

Bridge Pontoon Finite Element Model, Doty Bros., Firestone Blvd. Norwalk, CA

Glenmore Plaza Hotel addition, preliminary - 20 Sumner, Ave., Avalon, CA.

Steel moment braced frames, deep foundation, potentially liquefiable soils.

Above ground water storage tank retrofit and provide it with a seismic baffle,

Machinery impact and vibration attenuation in the slabs of a Shoes Factory.

Campus, seismic strengthening, two/three storey steel structures classrooms and educational facilities.

GANSEK, INC. Design-Build. Berkeley, CA . (April 2003 April 2005)

Draft person, Estimator, Superintendent, Project Manager

The construction of a SCHOOL; 2425 Ygnacio Valley Road between North Civic Dr. and

Walnut Blvd. Walnut Creek, CA 94597.

The restoration of The Port of Redwood City, CA. Offices. 675 Seaport Blvd, Redwood City,

CA 94063.

Commercial, Industrial, Health-Care, Schools, Seismic Rehabilitations, Hotels, Apartments,

Residential Homes & Living Complexes, Churches, Warehouses, Auditoriums, Miscellaneous.

EDUCATION

Master of Science in Structural Engineering (1990)

Bachelor of Science in Civil Engineering (1987)

University of California, Berkeley - Courses

Ductility in Steel Structures, Egor Popov, University of California, Berkeley

Soil-Structure Interaction, Braja M. Das, University of California, Sacramento

Plates and Shells, William Snobrich, University of Illinois, Urbana

Reinforced Concrete Structures, Phil M. Ferguson, University of Texas, Austin.

SKILLS AND STRENGTHS

Concrete, Steel, Composite, Masonry, Light Gauge, Aluminum and Wood.

Mid to High-Rise, Earth Retaining and Foundations, Prestressed Concrete.

3D Modeling, Project Management.



Contact this candidate