Post Job Free
Sign in

Project Manager

Location:
Pembroke Pines, FL, 33027
Posted:
April 30, 2013

Contact this candidate

Resume:

RAOF SHAMS

1-954-***-****

****.*****@*****.***

REGISTRATIONS Nationality American

Position Project Manager/ Quality Manager

General Contractor, Florida

Specialization Project Management/Construction Management/QA/QC

EDUCATION

EXPERIENCE PROFILE

BS in Construction 31 years of engineering and construction experience, including 14 years on

Management, Miami Florida various engineering/construction/inspection projects, and 17 years of

general supervision on construction of mega infrastructure projects.

Extensive experienced in construction management and techniques.

MEMBERSHIP

Experience in PPP, design build, finance, construction management at

AFFILIATION

risk, construction engineering and inspection, safety, QA/QC program

according to ISO 9001, project management plan, monthly progress

American Society of Civil

reports, and final estimates preparation, calculate and estimate of

Engineers (ASCE)

construction costs and monthly estimates, work closely with client

representatives on all phases of construction as both Contractor and

Engineers without Borders

Consultant from Planning, Constructability, Scheduling, Execution and

(EWB)

Inspection to Final acceptance. Projects include; mega rail system, pre-

cast, cast-in-place, incremental launching, balanced cantilever method with

American Concrete Institute

travelers high level segmental bridges, conventional bridges, bascule

(ACI)

bridges, roadway and asphalt inspection, buildings residential and

commercial projects, and interstate highway system with toll and bridges.

Project Management

Institute (PMI)

PROJECT EXPERIENCE

American Society for Quality

I 595 Express

(ASQ)

Fort Lauderdale, Florida USA

July 2009-Present

CERTIFICATIONS

Project: I-595 Corridor Improvements (D/B/F/O/M) $1,814,000,000.00

Client: FDOT

LRQA, ISO 9000:2000

Project Role: Quality & Safety Manager ( Design, Construction, Operation

Quality Management Lead

& Maintenance)

Auditor

Public Private Partnership (P3) agreement with a consortium created by

ACS Infrastructure Development, serve as the Concessionaire to design,

BSI, ISO 9000:2000 Quality

build, finance, operate and maintenance (D/B/F/O/M) the I-595 Corridor

Management Internal Auditor

Improvements project through the 35-year agreement term. The limits of

the project extend from the I-75/Sawgrass Expressway interchange to the

UF/CTQP,

I-595/I-95 interchange in central Broward County, Florida, for a total project

Construction Academy

length of approximately 10.5 miles. The project consists of the

(Project Engineer School)

reconstruction, addition of auxiliary lanes and resurfacing of the I-595

mainline (including associated improvements to adjacent cross-roads,

UF/CTQP, Quality Control

frontage roads and ramps), and a new reversible express lanes system in

Manager

the I-595 median. Highlights of the major improvement components

include: reversible tools, widening / reconstruction of the Florida’s Turnpike

Primavera,

mainline from Griffin Road to Peters Road (2.7 miles), addition of auxiliary

Contract Administration

lanes on the eastbound and westbound I-595 and SR 84 roadways,

Continuous connection of the SR 84 frontage road between Davie Road

ATSSA, Work site Traffic

and SR 7, grade separated (braided) entrance and exit ramps, Combined

Supervisors

ramps and cross-road bypasses, construction of the New River Greenways.

Act as owner representative, reporting directly to CEO. Responsible for

UF/TTC, Environmental

supervision of Design, Construction, Safety, Operation & Maintenance,

Impacts of Highway

monitoring of safety and quality site procedures and testing laboratory

Construction

procedures and activities. Generate and approved project Quality Manual,

Safety Manual, Design Quality Plan, Construction Quality Plan, Operation &

Maintenance plan and procedures, support and advice Project CEO and

UF/TTC, Erosion

Page: 1

RAOF SHAMS

1-954-***-****

****.*****@*****.***

Control/Storm water managers. Direct and managed material approvals processing in

Management coordination with testing laboratory. Direct and supervision of CEI Resident

Engineer, Design and Construction Quality Managers, supervised periodic

UF/CTQP, Asphalt Paving audits to verify program and project specific quality plan implementation is

Inspection Levels I & II effective and remains in compliance with approved procedures.

Recommend and advised non-compliance report when necessary to the

project CEO and managers. Monitor quality, material handling procedures,

UF/CTQP, Earthwork audit the project and ensure project is in compliance with project

specifications and OSHA, ISO 9001, AASHTO, ACI, ASTM, ANSI

Inspection Levels I & II

standards. Provide guidance and suggestions for job specific quality, risk

and safety plans development. Ensure that testing requirement frequencies

UF/CTQP, Final Estimates are satisfied. Lead surveillance and schedule audits.

Level II

Parsons-Odebrecht JV

UF/FEES, Building/Structural Miami, Florida USA

Transition Overview January 2009 - July2009

Project: MIA (Miami Airport) Mover APM System, Design Build

OSHA, 29 CFR 1926 ($ 256,000,000.00)

Construction Standards Client: MDAD

Project Role: Project Manager (Design, Construction &Operation)

UF/CTQP, Pile Driving Design Build people mover project connect the Miami Intermodal Center

Inspection (MIC) to the Miami International Airport Main Terminal, shuttling travelers

and airport workers to/from parking, rental car facilities, regional

UF/CTQP, Drilled Shaft transportation services and the Main Terminal. This project covers the

Inspection design, construction and commissioning of the MIA Mover APM System.

Responsible for supervision of Design, Construction and Operating system,

TROXLER, Radiation Safety monitoring of quality site procedures and testing laboratory procedures and

Officer activities. Generate and approved project Quality Manual, Design Quality

Plan, Construction Quality Plan, Operating Systems Quality plan and

FCPA, Structural Masonry procedures, support and advice Project Executive on quality matters.

Inspection Managed material approvals processing in coordination with testing

laboratory. Conduct periodic audits of both QA/QC to verify project specific

ACI, Troubleshooting quality plan implementation is effective and remains in compliance with

Concrete Construction approved procedures. Recommend and advised non-compliance report

when necessary to the project executive and managers. Monitor Quality,

ACI, Transportation material handling procedures, audit the project and ensure project is in

Inspector compliance with project specifications and ISO 9001, AASHTO, ACI,

ASTM, ANSI standards. Provide guidance and suggestions for job specific

IMSA, Work zone Safety quality plan development. Ensure that testing requirement frequencies are

Specialist satisfied. Lead surveillance and schedule audits.

CMC&A, Advanced Work Parsons

zone Traffic Dubai, UAE

2007 - 2009

FDOT, Preparation of Final Project: Dubai Metro Project (Design Build) ($ 5,000,000,000.00)

Estimates Client: RTA

Project Role: Project Manager (Quality & Safety)

Project consists of design and construction of both civil and rail system of

75.9 km of elevated pre-cast segment elements using Lunching Girder

method on Drilled Shaft foundation. The project introduces the use of TBM

(9.95 m diameter) for the tunneling of 11.6 km connecting under ground

stations with pre-cast segment tunnel lining serve as the tunnel walls.

Underground stations constructed using “top down” method which entails

the construction of diaphragm walls. Project included total of 47 elevated

Page: 2

RAOF SHAMS

1-954-***-****

****.*****@*****.***

and underground stations.

Responsible for supervision and monitoring of quality and safety site

procedures and testing laboratory procedures and activities. Review and

approval of contractors CQC plan and procedures, support and advice

project managers on quality and safety matters. Managed material

approvals processing in coordination with testing laboratory. Conduct

periodic audits of both QA/QC and Safety to verify project specific quality

plan implementation is effective and remains in compliance with approved

procedures. Recommend and advised non-compliance report when

necessary to the project managers. Monitor Quality, HSEP and safe

material handling procedures, audit the project safety plan and ensure

project is in compliance with project specifications and ISO 9001, AASHTO,

ACI, ASTM, ANSI and BS standards. Provide guidance and suggestions for

job specific quality plan development. Ensure that testing requirement

frequencies are satisfied. Lead surveillance and schedule audits on the

Engineer and Contractors.

Parsons

Abu Dhabi, UAE

2006 – 2007

Project: Saadiyat Island Bridge ($ 250,000,000)

Client: Tourism Development & Investment Company (TDIC)

Project Role: QA/QC Manager

The Saadiyat bridge project consist of eight structural units and four bridge

types such as; Unit 1: Multi-span continuous, concrete segmental box

girders constructed using the incremental launching method. Unit 2: A five

span, continuous, concrete segmental box girders, incrementally cast-in-

place using the balanced cantilever method with form travelers. Unit 3: A

two-span, continuous, concrete box girders cast-in-place on temporary

reclaimed fill and constructed using traditional scaffolding and formwork.

Unit 4N and 4S: Multi-span, continuous, concrete box girders constructed

span by span cast-in-place on false work. Unit 5: A unit for future rail usage

is a multi-span, continuous, concrete box girders constructed span by span

cast-in-place on false work. Unit 6N and 6S: These ramp units are multi-

span, continuous, concrete box girder bridges constructed span by span

cast-in-place on false work. Responsible for Generating Project

Management Plan, Monitoring QA/QC site procedures and testing

laboratory procedures and activities, Conduct periodic audits to verify that

Job Specific Quality and Safety Plans implementation are effective and

remains in compliance with approved procedure, Supports and advise the

Project Manager in project quality matters.

Jacobs

Sanibel Island, Florida USA

2005 - 2006

Project: Sanibel Island Bridges & Toll Plaza (CM at Risk)

($ 69,000,000)

Client: Lee County

Project Role: Project Administrator/Resident Engineer

The Jacobs Construction Services, Inc. (JCS) was selected by Lee County

for the construction of the Sanibel Bridges and Toll Plaza Reconstruction

Project. Responsible for supervision of construction/inspection and overall

quality control of the replacement of three Sanibel Island bridges.

Responsible for insuring the Project subcontractors are installing the work

Page: 3

RAOF SHAMS

1-954-***-****

****.*****@*****.***

in strict compliance with the engineer’s specifications and drawings. Their

focus is on scope, quality control and inspection and on conformance with

plans and specifications.

Dynamic Consultant Corp.

Miami, Florida USA

2005

Project: SR. 112 (Airport Expressway) Toll Plaza Conversion

(USD 7,000,000)

Client: MDX (Accelerated Toll Project)

Project Role: Project Administrator/Resident Engineer

Responsible for supervision of construction/inspection of the improvements

to high traffic volume SR. 112 Toll Plaza including the installation of two

express lanes, replacement of canopy roof with gantry, including additional

lighting, widening and reconstruction of the approaches, and improvement

of drainage. Specific duties include project documentation control, claims

review, construct ability review, preparation of field changes, QC program,

monthly estimates, supervision and scheduling of inspection team.

PARSONS

Miami, Florida USA

2003 - 2004

Project: Le Jeune Rd, University Drive, Oakland Park FDOT Project,

Flagler, Red Rd, and Tri-Rail Projects. Florida (USD 115,000,000)

Project: Role: Project Manager

Full operational responsibility for construction / inspection from design to

completion and preparation of Quality Control Plans, QC tests data and

overall projects quality in accordance with plans and specifications.

Responsible for generating Project Management Plan, Monitoring QC site

procedures and testing laboratory procedures and activities.

WASHINGTON GROUP International

Morrison Knudsen Corp

1991-2003

Project: Tri-Rail New River Bridge (Design Built) Ft. Lauderdale, Florida

(USD 68,000,000)

Client: SFRTA-Tri-Rail (Design Built)

Project Role: Quality Manager – 2003 - 2004

Project consists of super structure with 38 concrete girders spans and steel

girder main span. Substructure consist of 10 feet diameter Drilled Shafts

supporting 8 feet diameter columns with caps. The structures are to provide

a deck to support double tracks for TRI-RAIL commuter traffic. Duties

include preconstruction review of FDOT and Railroad specifications,

preparation of QC plan, monitoring wetlands and erosion control, and

overall inspection of structures.

Project: I-95 Connecting State Road to the West Palm Beach Airport

(USD 250,000,000)

Client: FDOT

Project Role: Sr. Field Engineer – 2000-2003

Responsible for the complete construction of this interchange connecting

Page: 4

RAOF SHAMS

1-954-***-****

****.*****@*****.***

state road I-95 to the Palm Beach International Airport. Washington

Infrastructure provided construction engineering and inspection services for

$200M of 13 kilometer-long segment of I-95 thru Palm Beach County,

consist of 14 segmental and conventional bridge structures including over

2000 piling; 1564 segments; MSE walls (59 ea. 33,264 m2); sound walls;

drainage; earthwork; electrical/lighting; signalization; landscaping; utility

relocations. The project requires tremendous amount of MOT coordination;

public information involvement; coordination with the airport and local

municipalities; and coordination with adjacent ongoing construction

projects. Specific duties include project documentation control, claims

review, construct ability review, preparation of field design changes, QC

program, supervision and scheduling of inspection team for 14 bridges.

Project: I-95 Okeechobee Blvd. Interchange

Client: FDOT

Project Role: Senior Field Engineer - 1999-2000

Responsible for the complete reconstruction of the Interstate

Interchange with Okeechobee Blvd. This project included the widening and

superstructure replacement of the Okeechobee Bridge over I-95 and the

construction of the Okeechobee westbound to I-95 southbound flyover

ramp bridge (Dbl Steel Box Girder).

Project: I-95 Congress Avenue-North Lake Blvd.), West Palm Beach, FL

Client: FDOT

Project Role: Senior Field Engineer - 1998-1999

Responsible for construction engineering and inspection for reconstruction

of three segments of I-95 for approximately seven miles of Interstate

widening and resurfacing; widening of I-95 bridges over SR710; installation

of a new drainage system; extension of 3 multi barrel bridge culvert

crossing below the interstate; and sound walls. Duties include construct

ability review, scheduling of project inspection team, and overall inspection

of the project

Project: Venetian Causeway Rehabilitation, Miami, Florida

Client: FDOT

Project Role: Senior Inspector/M.O.T Coordinator/Radiation Safety Officer

- 1995-1998

Responsible for construction engineering and inspection for rehabilitation of

11 historical, and 2 elevated Bascule Bridges over the Inter coastal

W aterway including eight bascule piers with steel sheet pile cofferdams

approximately 25’ to 30’ deep in the waterway; major storm drainage; mass

concrete construction. Duties include overall earthwork and asphalt

inspections, preparation of final estimates, field books, and MOT

coordination, responsible for radiation safety of project personnel, overall

under water inspection, maintenance and inspection of bascule bridges,

and control house-building inspection.

Project: SR A1A Miami Beach, Florida

Client: FDOT

Project Role: Sr. Inspector - 1993-1995

Responsible for construction engineering and all field Inspection of $10

million, 2.5 miles of Collins Ave., which consisted of extensive utility

coordination, infrastructure reconstruction, Construction of a new drainage

system, new base & new asphalt. Duties include coordination of traffic and

construction/replacement of major utilities along tourist district of Miami

Page: 5

RAOF SHAMS

1-954-***-****

****.*****@*****.***

Beach, scheduling of project inspection team, and overall inspection of the

project.

Project: I-95/SR 112/SR 836 Interchange

Client: FDOT

Project Role: Senior Inspector / MOT Coordinator – 1991-1993

Responsible for all field inspection of these two projects.

These projects includes widening of six bridges; construction of over

21,000 cy of concrete pavement; storm drainage; box culverts; construction

of new ramp connector with 18” concrete piles and drilled shafts foundation;

3 piers over inland water; mass concrete pile caps; 36” column with

hammer head pier caps; type III AASHTO Beam girders; 60,00 cy of

embankment; 16 reinforced earth walls; over head sign structures; highway

lighting and electrical. Duties include all field inspection activities for 13

bridges, steel and concrete inspection and beam erection. Maintenance of

Traffic coordination of three high volume traffic projects in down town

Miami.

BHA

Project: Dodge Island/Port Of Miami, Miami, FLorida

Client: FDOT

Project Role: Senior Bridge Inspector – 1990-1991

Responsible for construction engineering and overall inspection of the 640

pre-cast segments at the casting yard and the erection site (balanced

cantilever), geometry control of segments, casting curve, grouting, post-

tensioning and erection of segments. Involved in preparation of field books

and final estimates for $34 Million Florida Department of Transportation

Project (Port of Miami project), high-level bridge over the Inter-coastal

Waterway, connecting downtown Miami to Dodge Island to the Port of

Miami.

METRIC ENGINEERING, Inc.

Project: I-75 Alligator Alley – Miami, Florida

Client: FDOT

Project Role: Sr. Inspector- 1986 - 1990

Responsible for the overall project Inspection. Specific duties included

project documentation control, approval of the contractor’s monthly

progress payments, and assistance in preparing the final estimate.

Tectonic Construction Co.

President (Self-employed) 1983 - 1985

Responsible for work force coordination, estimating, general supervision of

construction and bidding on residential and commercial projects.

Shenazh Consultant Co.

President (Self-employed) 1981 - 1983

Responsible for planning, design, surveying, estimating, scheduling, and

supervision of housing and commercial projects.

Page: 6

RAOF SHAMS

1-954-***-****

****.*****@*****.***

Page: 7



Contact this candidate