Kishan M Swami
*** * ****** **. *******, CA ***** 805.850. 5122 k ************@*****.***
Objective:
Obtain a full-time position where I can utilize and develop my engineering and business skills.
Education:
California Polytechnic State University, San Luis Obispo Graduation Date: June 2012
Bachelors of Science in Industrial Engineer
Masters of Science in Engineering specialization in Integrated Technology Management Graduate GPA 3.85
Relevant Coursework:
Production Planning and Control Systems Econometrics/ Economic Probabilistic
Quality Engineering/Process Optimization Modeling
Economic Decision Analysis System
Supply Chain and Logistics Management
Advance Design of Experiments (Corporate Finance)/ Engineering
Database Design/Management Economics
RFID Implementation and Electronic
Systems Engineering
Human Factors/Ergonomics Manufacturing
Engineering Mechanics/Materials
Simulation/Operation Research
Engineering
Work Experience:
Lockheed Martin (Aeronautics) (Supplier Quality Engineer) October 2012-Current
Source quality product from suppliers
Ensure the quality rating is maintain by collaborating with supplier’s management
Verify quality system (AS9100) is maintained and controlled
Issue/Approve Corrective Actions
Provide Root Cause Analysis training
Provide Quality surveillance and investigations to ensure quality system is effective
Via process audits provide feedback for possible improvements
Expedite production to meet shipment dates
Manage projects at suppliers such as: Tooling Requirements, Contract Review process, Configuration
Management, Production Scheduling, Procurement, Alternative Outsourcing and Sub-Tier Control
Support Root Cause Analysis with all nonconformance
Custom Sensor Technology (Kavlico) (Manufacturing Engineering Intern) February 2012-May 2012
Created Weld Work Instruction and trained welders to aid with NADCAP certification
Provided line support for the welding cell, as well as assigning rework
Created functional database to capture weld and braze cell’s scrap/rework metrics
Standardized Weld Schedules and Weld Sample Log
Implemented daily verification for data collection as a preventive action
Validated/Calibrated Equipment for NADCAP certification
Abbott Vascular (Manufacturing Engineering Intern) June 2011-September 2011
Reduced the frequency of cleaning and belt change of packaging machine
Convert SOPs into easy-to-read documents with pictures
Modified tool design drawings
Enhance designed on current product to reduce the field failures
Created process flow maps for new product to aid with process improvement
Implemented local process improvement suggestions
Genentech (Production Logistics Intern) June 2010-September 2010
Created a template to be used for sensitivity/scenario analysis for the MPS
Revealed root causes for the re-work on process orders, and the large amount of alerts present on SAP
Made a Business Process Instruction (BPI) to approach the alerts present on SAP-APO
Developed a project management tool utilizing DMAIC methodology, using Microsoft Project
Worked on available capacity model for the current department
G&S MiniMart (Ex-Family Owned Business)
Increased efficient with the storage and stocking of inventory
Marketed clientele new products
Ordered inventory based on the seasonal demand
Projects:
Poly House: House Renovation for Needy Family (Shandon, CA) Spring 2011
Raised food to support all of the volunteers helping out
Scheduled volunteers into shifts, along with their rides to the site
Fundraised furniture and ergonomically equipment to provide a better life for the family
Utilized project management tools to manage all of the logistics and milestones
Pacific Gas and Electricity (PG&E): Tool Inventory Tracking System (Diablo Canyon, CA) Spring 2010
Implemented a tool-tracking system via RFID sending information to a central database
Created prototype of the model with a backup system for easy implementation
Developed a database in which the data is stored and reports may be created easily
Greenheart Farms: Facilities Re-Design (Paso Robles, CA) Winter 2010
Implemented an automation machine to enhance throughput and ergonomic material handling
environment
Redesigned the layout to embed the placement of the equipment and the efficient material flow
Modeled cost justification on the savings calculated by time study and simulation
Yogurt Creation Simulation (San Luis Obispo, CA) Fall 2010
Created a logical model to visualize statistical fluctuation and dependent events taking place
Work study was done to establish relative probability distributions for inter-arrival and at-location times
What-if analysis with addition workers and combining stations were looked at for future improvements
ISO 13485 Implementation Project (Quality Engineering Report) Fall 2010
Observed the requirements for a successful implementation of ISO 13485
Compared and contrast ISO 9001 with ISO 13485
Additional projects consisted of: Cash Flow Analysis, Sensitivity Analysis, Root Cause Analysis, and DOEs
Skills:
Communication Skills: Can easily communicate with all tiers of management and operators though any medium
Computer Skills: Microsoft Office, MiniTab, Microsoft Visio, Microsoft Project, SAP, JDEdwards, Pro/Engineer
Wildfire, ProModel, SolidWorks, Photoshop, VBA, SQL, HTML
Languages: Orally fluent in Guajarati and Hindi
Interest: Six Sigma, Consulting, Business Development, Manufacturing, Engineering, Project Management, APICS
Extra-Curricular Activities/Clubs/Honors:
Teachers Assistant (Simulation, Statistics, Ergonomics, Machining, Pro-E) April 2011-June 2011
Tutor for College of Engineering (15 hours per week) April 2008-Present
Tutor students in engineering, mathematics, statistics, and chemistry courses
Indian Student Association (ISA) Fall 2007-Spring 2011
Previous Position: Vice President
Alpha Pi Mu (Industrial Engineering Honors Society) April 2010-Present
Dean’s List Recipient Fall 2009-Winter 2010, Spring 2011
Golden Key International Honour Society (Member)
APICS Case Study Competition (Team Lead, 3rd place Graduate Level)
Case: Loss of single source vendor overseas with high regulations.