Post Job Free
Sign in

Engineer Project

Location:
New Delhi, DL, India
Posted:
April 29, 2013

Contact this candidate

Resume:

SATISH JAMI Date of Birth - **th July,****

PHONE NO: +918*********

EMAIL : **********@*****.***

*.****@******.****.*****.**

******.****@**-*****.***

Passport No.:F5079594

Nationality: INDIAN

Passport Issue Date: 11.10.2005

Passport Exp. Date: 10.10.2015

Present Status Production Engineer II at Tapti compression and processing

platform along with 5 satellite well head platforms of 'BG-Group'

OBJECTIVE To join in an organization which gives me an opportunity to grow

myself as a team member and as an individual in a fast changing and

challenging technical environment

Academic Record

DEGREE/CERTIFICATE INSTITUTE/ SCHOOL CGPA/PERCENTAG YEAR

E

EDUCATION

B TECH, CHEMICAL INDIAN INSTITUTE OF 8.85/10 2004-08

ENGINEERING TECHNOLOGY,

GUWAHATI

INTERMEDIATE EDUCATION EXCEL JUNIOR 94.4% 2001-03

COLLEGE, A.P

SCHOOLING ( CLASS X ) SARADA VIDHYA 86% 2001

NIKETHAN, A.P

AREA EXPERTISE

Chemical process plant design; process equipment design; Advanced

process controllers design(Optimal control, Linear Quadratic

KEY AREAS Control e.t.c) for chemical process; Distillation column

Design(Tray and Packed column);Heat Exchanger Network design by

using pinch technology; Commissioning and Operation of various

Petroleum refining units; Chemical Process plant simulation by

using PROII; Operation of Gas processing Platforms; Operation of

well head platforms; Commissioning of Newly drilled wells; HSSE

Management; Hands on experience in operating Honeywell, Emersion

and Yokogawa DCS.

EQUIPMENT OPERATION

EXPERTISE

After working in Indian Oil Corporation Limited and BG-Group, I

became an expert in the operation of the following equipments:

EQUIPMENTS Distillation Columns, Vessels, Reactors, Dryers, Separation

systems, Adsorption Columns, Absorption Columns, Regeneration

systems, Cryogenic distillation (N2 production) cold box, Furnaces, Vertical and Horizontal Separators, Heat Exchangers, Compressors, Pumps, Ejectors, Gas dehydration systems, Metering systems

etc.

PRESENT JOB PROFILE

at BG-Group

Generic Role: Process Engineer

Designation: Production Engineer II

Job profile involves commissioning of Newly drilled wells;

KEY Operation of upstream Oil & Gas processing Platforms; Operation of

RESPONSIBILITY Wellhead or Satellite platforms; Monitoring of process parameters;

Planning of macro activities like Platform Shutdown; Planning of

micro activities like Plant maintenance jobs; Performing well

intervention jobs on the satellite platforms by Coordination with

the well intervention teams; Coordination with the rig drilling

team during drilling of new wells; Startup and shutdown of Process

and satellite platforms; Coordination with the other Maintenance

Departments; Trouble Shooting of the operation of process platforms

and well heads; Participation in BBS; Manpower management etc.

PAST JOB PROFILE

at IOCL

Generic Role: Shift In charge

Designation: Production Engineer

KEY Job profile involves commissioning of Petroleum refining units;

RESPONSIBILITY Operation of process units; Monitoring the process parameters;

Planning of macro activities like Unit maintenance & Inspection

Shutdown; Planning of micro activities like routine maintenance

jobs, predictive maintenance jobs; Performing TPM; Generation of

OPL and KAIZEN; Execution of New Schemes; Training of plant

operators; Coordination with Maintenance Department; Trouble

Shooting of the operation of process plant; Manpower management

etc.

PROCESS PLANT COMISSIONING EXPERIENCE

Commissioned MSQ Unit of Barauni Refinery. MSQ Unit having Axens

Technology consists of

1.Naphtha Hydro treating Unit

MSQ UNIT 2.Isomerization Unit

COMMISIONING 3.PrimeG+ Unit

Worked as a Commissioning Engineer in MSQ Unit.

Indian Oil Pre commissioning and commissioning activities involves P&ID

Corporation checking; hydro testing; water flushing; Air blowing; Final Box up;

Limited Furnace refractory drying; Rotary equipment trial runs; leak tests

with plant air, N2 and finally with H2 at operating conditions ;

(JUL-NOV10) Interlock logic checking; Dryers automation logic checking;

Performing dry out operation; acidizing for ISOM, catalyst loading;

Naphtha cold circulation; Naphtha hot circulation; Stabilizing the

columns to normal operating conditions; sulfiding of the catalyst;

Stabilizing the total unit as per design operating conditions;

Routing the product after obtaining the design product conditions.

Commissioned the new N2 plant of Barauni Refinery having BOC

Technology. N2 plant has been constructed as a part of MSQ complex

N2 Unit in Barauni Refinery.

Commissioning

Worked as a Commissioning Engineer in N2 Unit.

Indian Oil

Corporation Pre commissioning and commissioning activities involves P&ID

Limited checking; hydro testing; water flushing; Air blowing; Final Box up;

Rotary equipment trial runs; leak test; Interlock logic checking;

(SEP-OCT10) PPU sequence checking; Air compressor start up; Refrigeration

section startup ; PPU section startup; Cold box start up by running

turbine and gradually decrease the temperature of cold box by using

turbine until cold box attains cryogenic distillation temperatures;

Stabilizing the unit for attaining 99.99% purity of N2; Routing

gaseous N2 to refinery N2 header; Cooling the liquid N2 vessel

gradually till attains the cryogenic temperature; Storing the

liquid N2 in the Vessel.

Worked as a Shift In charge in Atmospheric and Vacuum Unit of

AVU3 Unit Barauni Refinery

Commissioning Job involves

after M&I shut down of the unit as per standard operating procedure;

Shutdown Flush out hydrocarbons, water flushing, Steam flushing, Hot water

flushing, Flushing with KMNO4 Solution for the Vaccum column;

Indian Oil Opening the columns, vessels, Exchangers for internal inspection

Corporation and cleaning;

Limited Inspection of all process equipment and performing modification

jobs as per Inspection recommendations;

(MAY-JUL09) Execution of New schemes for refinery benefit;

After completion of all maintenance jobs Unit has been started as

per normal commissioning startup procedure

Worked as a Shift In charge in MSQ Complex of Barauni Refinery.

MSQ Commissioning Job involves shut down of the unit as per standard operating

after Complete procedure and execution of new schemes for increase of the refinery

Refinery Shutdown profit.

As the Unit is newly commissioned, there were not much for

performing the maintenance and inspection related. New schemes(RSU

Indian Oil bypass scheme, Coker Naphtha line from OMS to MSQ Unit Scheme, DIH

Corporation Recycle line connection to heavy Isomerate) have been executed.

Limited

After completion of the M&I Shutdown of the refinery, MSQ Complex

(AUG 11) has been started as per normal commissioning startup procedure.

Due to the execution of the new schemes Throughput of the complex

has been increased by 20%. (Before shutdown unit was operating at

110% of the design throughput and after startup we were able to

operate the unit at 130% of the design throughput while maintaining

EURO3 MS Specifications.)

TCPP and TPP Worked as a Process Engineer in the Tapti Complex during Shutdown

Commissioning and Startup of the complex. All the maintenance jobs have been

after complete executed safety and on time as per the plan.

shutdown of

platform and Tapti Compression and Processing Platform, Tapti Platform along

satellite with its Satellite platforms STA,STB,STC,STD and MTA have been

platforms completely shut down for performing Major Maintenance jobs like

BG-Group Flare tip replacement, MTA spools replacement, Compressor Engine

(April 12) replacement jobs.etc.

This is the only complete platform shutdown after the initial

commissioning of the Process platform.

Conversion of IG Worked as a Process Engineer in the Satellite Platforms (STA and

to IA System at STC) during the execution of IG to IA conversion project. Project

Satellite has been successfully commissioned within the planned period.

Platforms in

Tapti Field Complete Satellite Platform shutdown has been taken. Platform has

been depressurized and purged with N2. New Spools which were pre

BG-Group erected have been connected to the existing IG system. All the

(Jul-Aug 12) instrument tubing's have been Purged with N2. All the panel related

lines were completely purged. Existing IG connections have been

disconnected and blinded. Newly connected line was flushed and

commissioned. Panel has been charged with Instrument Air (IA).

Platform startup has been done as per the safe startup procedure.

Satellite platforms in the Tapti field have become much more safer

to work after execution of this project.

Working as a Platform representative in the rig during the drilling

MTA#7,8,9 campaign of MTA#7, 8, 9.

New ERD Wells Job involves the coordination with different teams for performing

Commissioning simultaneous operations, shutdown and startup operations, Pre

commissioning and commissioning of flow arms of newly drilled

BG-GROUP wells, flow back of newly drilled wells with expro team,

(May12- Present) Coordination with the Coiled tubing team for N2 activation and

flowing the well through the normal flow line.

Commissioned the newly drilled ERD MTA#8,9 wells. These are the

first ERD wells for BG or any other company in India.

Worked as an Operational Representative during the well

intervention jobs at the Various Satellite platforms of Tapti

Well Field. Job involves the coordination with various teams and

Intervention managing the operations as per the work packs with HSSE at top

Campaign in the priority.

Satellite

Platforms of As the production in Tapti field is coming down, Various well

Tapti Field. intervention activities have been performed in the satellite

platform to increase and sustain the production from the Tapti

BG-GROUP Complex.

(Dec 11- Nov12) Acid Stimulation, Coiled Tubing Operation, Wire line Operations,

Slick line Operation have been performed on many wells to increase

the production. During the well intervention job, safety has been

kept at the top priority. All the intervention projects were

delivered safety. Many of the wells production got increased due to

the well intervention activities performed.

Internships/Work Experience

PROJECT: ADSORPTION OF WATER VAPOUR ON VARIOUS CEMENTITIOUS

SUBSTRATES.

TU BERGAKADEMIE, I measured the water vapour adsorption isotherms of various

FREIBERG, cementitious substrates. Isotherms are measured by DVS method which

GERMANY is performed by Automated moisture sorption analyzer. These

adsorption isotherms will be used to know the amount of water

(MAY'07-JUL'07) vapour adsorbed or desorbed in a building when ever there is a

change in the weather or change in the relative humidity in the

atmosphere. Variation of physical properties such as strengths,

flow properties, initial set and final set of vicat test, densities

are also studied.

JOINED IN INDIAN OIL CORPORATION LIMITED ON 16TH JUNE 2008.

Completed Corporate Induction Module training at IIPM Gurgaon.

Completed Refinery Module Training and On job training at IOCL

guwahati refinery.

Ran 'Atmospheric and Vaccum Unit3' at IOCL barauni refinery as a

Shift/Incharge for one year from oct 20008 to oct2009.

I monitored 40 days planned Maintenance & Inspection (M&I)

shutdown for the Atmospheric & Vacuum Unit3 at IOCL barauni

refinery as a shift incharge.

Got transferred from 'ATMOSPHERIC and VACCUM UNIT3' to 'Motor

Spirit Quality Up gradation Unit' of IOCL Barauni Refinery during

oct2009.

Commissioned MSQ Unit of Barauni Refinery as a commissioning

engineer.

Involved in training MSQ operating personals for unit

commissioning, P&ID checking, pre commissioning activities,

INDIAN OIL planning and performing commissioning activities and manual

CORPORATION preparations of MSQ unit while Commissioning the MSQ Unit.

LIMITED Commissioned New N2 Unit of Barauni Refinery as a commissioning

engineer.

(JUNE'08-OCT'11) Projects done during refinery module training period at Guwahati

Refinery

Study of the effect of different parameters on the Gross Refinery

Margin.

Sox, Nox analysis in the flue gas which is emitted from various

units in the refinery.

Some more major trainings completed in Indian Oil

Completed 50 days training on 'Petroleum Refining Technology' at

I.I.P Dehradun.

I completed a training session on 'Advanced Process Control' given

by Honeywell. APC has been implemented in AVU3 under my

supervision as a Shift Incharge.

Completed a certified training program on "Accident Investigation"

given by IRCA.

PRESENTLY WORKING AS A PRODUCTION ENGINEER II IN TAPTI COMPLEX

CONSISTS OF TAPTI PROCESSING AND COMPRESSION PLATFORM, TAPTI

PROCESS PLATFORMS AND SATELLITE PLATFORMS (STA,STB,STC,STD AND MTA)

Joined in BG on 9th November, 2011 as a Production Engineer II

Completed Safety Induction and HEUT Trainings which are mandatory

for Offshore Operations

Played a major role in execution and coordination of different

teams during well intervention jobs like Acid Stimulation, Coiled

BG GROUP tubing and wire line jobs performed on the Natural Gas producing

wells at various satellite platforms.

(NOV'11-PRESENT) Executed Various Maintenance Jobs in the shutdown of the total

complex during April2012.

Working as a Platform representative on the rig (Great Drill

Chetna) during the ongoing drilling campaign for new ERD wells.

Playing a major role for compliance of HSSE standards during the

execution of each and every Job.

Executed the IG to IA conversion projects at STA and STC safety

with in the planned period.

Some major training attended during working in BG Group.

Completed the "Risk Based Process Safety Management" program given

by John. M Campbell, USA.

Completed the "Advanced First Aid Training" given by AMAS.

Completed the SAP-ERP end user PM Module training.

Completed the Level2 Training on ePTW system(Permit Vision

Software) by Petrofac.

Completed the Safety Induction and BOSIET training given by

Survival Systems India Limited.

RESEARCH/DESIGN EXPERIENCE

PROJECT: OPTIMAL CONTROL

This project deals with the design of the optimal control for a

system in control input and a cost function. Optimal control law is

IIT GUWAHATI obtained by the minimization of certain cost function or the

performance criteria. A proper cost function would be a

B.TECH FINAL YEAR mathematical expression giving the traveling time as a function of

PROJECT the speed, geometrical considerations, and initial conditions of

the system. This project also deals with the mathematical modelling

(JAN'07 - MAY'08) of the system. In this project optimal control law is obtained by

taking the quadratic performance index. The design of optimal

control can be changed by choosing different performance criteria.

Performance criteria depend on the type of the control problem. The

optimal control design can also be improved by making a change in

the performance criteria i.e., by multiplying the error with some

factor such that the control action will be better compared to the

control action obtained from the previous design. Three different

approaches have been studied for the design of optimal control.

They are applied for the case of bioreactor.

PROJECT: REMOVAL OF PHENOL FROM INDUSTRIAL WASTE WATER.

Equilibrium and dynamic studies were performed experimentally for

adsorption of phenol. Dynamic studies were performed after

IIT GUWAHATI designing a fixed bed adsorption column. The dynamic break through

curve was also simulated in ACM software. The simulated and the

experimental curve are compared and the difference is attributed to

(FEB'06 - DEC'06) underestimation of film mass transfer coefficient which was

estimated from existing correlations.

ACHIEVEMENTS

Scholastic

ACHIEVEMENT Cleared the joint Entrance Examination for IITS(IIT-JEE)

Cleared the All India Engineering Entrance Examination (AIEEE)

with a rank among 0.1% out of about 0.3 million candidates

Cleared the Engineering common entrance examination (EAMCET) with

a rank of 299.

Recipient of the 'MCMscholorship' for meritorious students by

IITguwahati..

Received a Gold medal from the Government of AndhraPradesh under

the name of Prathiba Award.

Received Scholarship from TU Bergakademie,friberg,Germany for

doing summer internship in that university.

My departmental rank is 3 out of 21 students during my B.Tech at

IIT Guwahati.

PUBLICATIONS

CHEMCON 2006

Removal of Phenolic Impurities from Industrial Wastewater by

Adsorption

Satish Jami, Unmesh Menon, Prabirkumar Saha and Sasidhar Gumma*

Department of Chemical Engineering, Indian Institute of Technology

Guwahati 781039, INDIA

SKILLS AND PROFICIENCIES

Programming and C, C++ (Turbo, visual), Java,VB.Net, Oracle

Data management

Skills

Operating Systems

Windows 98/NT/2000/XP/Vista.

Software Package

MATLAB, HEN, Reacat, Polymath, Chemsep, Aspen, PROII,

Honeywell'sRPMS, SAP, Permit Vision.

Certified Course Institute Duration

Courses

Petroleum Refining Indian Institute of 2 months

Tec0hnology Petroleum

Java Aptech Computer 2 months

Education

RDBMS Aptech Computer 2 months

Education

VB.net,Winforms Aptech Computer 3 months

Education

EXTRA CURRICULAR & NON-ACADEMIC ACHIEVEMENTS

Activities Individual Achievement

Nature of Activity Role

Organization Organized many cultural As a result there was

and technical events good number of

held at I.I.T Guwahati. participation from the

colleges which helps in

making the event

successful.

Sports Participant in Actively participated in

NSO(National Sports the NSO activities held

Organization) at I.I.T guwahati and

activities held at has been trained to play

I.I.T Guwahati volley ball during July

to November 2005.

Membership Participated in the

Student membership in chemcon 2006 organized

iiche(Indian Institute by Indian institution of

of Chemical Engineers) chemical engineers,

during 2004-08 Ankaleshwar region,

Gujarat.

ADDRESS FOR CORRESPONDENSE

SATISH JAMI,

CONTACT s/o Apparao,

ADDRESSES Postal Assistant,

BhairiSingupuram(Post&vill),

Srikakulam(Dist),

AndhraPradesh,

India.

PIN-532185



Contact this candidate