Steve Moehlman
**** ****** ***** ******* 702-***-****
Bryan, Texas 77802 *********@*****.***
Summary
Experienced in all facets of field surveying and calculations. Expertise in numerous project types including oil and gas
pipelines, residential and commercial development, roadways, railways, light rail, monorails, airports, detention basins, flood
channels, and educational facilities. Adept in performing field mapping and creating weld maps. Attended numerous training
sessions including HAZMAT, OSHA, and BNSF railroad safety. Specialized course studies at Bakersfield Community College
included drafting and pipeline construction.
Experience
SAM, Inc. December 2012–February 2013
Wichita, Kansas
Party Chief/Surveyor. For the Kinder Morgan Tallgrass Pony Express Pipeline, performed surveys for boundary and control,
primary right-of-way section corners, and property corners. Used Trimble tablet controller, Tredmark radio, and Trimble R-8.
Downtown Design Services, Inc. (DDSI) August 2010–September 2012
Fort Worth, Texas
Senior Party Chief/Surveyor. For Chesapeake Energy and the Enterprise Texas Express Pipeline, performed field surveys and
calculations for natural gas pipelines located throughout the Dallas/Fort Worth metro area. Downloaded data from field.
Maintained field books and plans. Operated instruments, including robotic and conventional, TDS Survey Pro, Trimble
GPS/RTK, TSC-2/3, and digital level. Supervised as-built pipeline section. Mentored and trained junior surveyors.
Stantec June 2007–August 2010
Fort Worth, Texas
Senior Party Chief/Surveyor. Performed field surveys and calculations for Chesapeake Energy natural gas pipelines located
throughout the DFW metro area. Downloaded data from field. Maintained field books and plans. Operated instruments,
including robotic and conventional, TDS Ranger with Survey Pro, Trimble GPS/RTK, and digital level. Supervised as-built
pipeline section. Mentored and trained junior surveyors.
PBS&J June 1996–May 2007
Henderson, Nevada
Party Chief/Surveyor. Performed field surveys and calculations. Downloaded data from field. Maintained field books and plans.
Operated instruments, including robotic and conventional, TDS Ranger with Survey Pro, Trimble GPS/RTK, and digital level.
Performed surveying on numerous infrastructure projects, including McCarran International Airport, I-15, Las Vegas Monorail,
and Pittman Detention Basin. Also surveyed numerous flood control channel and storm drain projects and commercial,
residential, and educational developments.
Westlake Consultants January 1994–June 1996
Portland, Oregon
Surveyor. Performed field surveys and calculations. Downloaded data from field. Maintained field books and plans. Operated
instruments. Performed surveying on projects, including light rail mass transit, Downtown Portland to Beaverton tunnel,
Portland International Airport runway expansion, and numerous subdivision developments.
Education
University of South Florida, 1976-1978
Specialized course work, Criminology/Psychology