Jeffery R. Meade 859-***-****
**** ******* ** *********, ** 40515 *************@*****.***
Objective
Multi-skilled individual with excellent problem solving abilities whom seeks a challenging position
which effectively utilizes a combination of Toyota Production System (TPS) Manufacturing,
environmental, safety and quality experience.
Major Accomplishments
Production Supervisor of 14 Injection molding presses and GEN 2 Manifold assembly line.
Production Supervisor of 63 team members and 17 team leaders.
Reduced the cost of vehicle production by reducing paint usage on an interior plastics paint
process.
Reduced the cost of vehicle production by eliminating production processes.
Reduced the cost of vehicle production by reducing solvent use in an interior plastics paint
process.
Reduced the cost of vehicle production by eliminating a chemical additive in interior plastic
components.
Initiated improvements in plastic paint process which reduced volatile fumes and improved
personnel safety.
Improved production process performance by eliminating splatter on an interior plastics paint
process.
Reduced the cost of service parts production by improving container storage systems.
Successfully completed six Quality Circle (QC) themes (three as QC member and three as QC
leader).
Certified Overhead Crane operator.
13 years (as of June 2010) experience in the TPS.
Employment History
Montaplast Frankfort Kentucky (July 2012 – Present)
Stanley Electric US London Ohio (Jan 2012 – July 2012 )
Sears Garage Solutions LLC Nicholasville Kentucky (May 2010- June 2011)
Toyota Motor Manufacturing Georgetown Kentucky (June 1997-March 2010)
Employment Responsibilities
Montaplast- Plant Supervisor on 3 rd shift. Over 63 team members, 14 injection molding processes, 11
manifold processes, and 2 lamanation lines.
Maintained production shipments to Ford,GM,Mercedes,and Toyota.
Scheduled production for all Injection Molding Machines and Manifold lines.
Stanley Electric- Robot Process Tech, Trouble shooting any and all problems.
Toyota Motor Manufacturing of Kentucky, Inc., Georgetown, Kentucky
Production Team Member – Plastics Injection Paint/Manifold (June 1997-April 2010)
Employment Responsibilities
Process operator for 14 injection molding machines, two flame preparation machines and small
parts paint booth.
Troubleshooting and processing of injection molding machines, flame preparation machines and
small parts paint booth.
Involved in daily production analysis, research, problem solving, and process improvement
activities.
Painting, assembly, and inspection of interior plastic components.
Operation of vibration welders for plastic engine intake manifolds.
Equipment start-up and shut-down procedures.
Verification of paint volumes and viscosities.
Continuous activities through Kaizens
Operation and troubleshooting of injection molding machines.
Education
Eastern Kentucky University
Tates Creek High School
References
Mark Winfrey
Assistant Manager
TMMK
Gary Davidson
Freedom Metals
Tammy Potter
Lexington Christian Academy