SitaRam Bajia (DME-Mechanical)
Jr.Engineer
Email: ************@*****.***,******@**************.***
Contact Number:
Mobile: 099********
Present Address:
House no.10,Heera Nagar,
Masuda Road,Beawar,Ajmer
Permanent Address :
Sitaram Bajia s/o Ganesh Ram,
Vill-Ballupura,Po-Bosana,Via-Losal,
Dist-Sikar (Rajasthan).
Pin Code-332025
Date of birth: 13 July 1991
Native-Ballupura,Sikar
Marital Status: Un Married
Nationality: Indian
Your browser may not support display of this image.Career Objective
Make a significant contribution to the relevant challenging environment that brings out best results through collective efforts.
Your browser may not support display of this image.Education Qualifications
1994 - 1996
2005 – 2006
Sec. (74.33%) from Board of Secondary Education, Ajmer, Rajasthan.
2006 – 2009
Diploma in Mechanical Engineering (69.66%), from Board of Technical Education, Rajasthan.
Aug2008-Oct2008
Auto Cad in Mechanical from CEG( Auto desk USA certified Govt. institute)
June 2008
24 Days practical training in HMT,Ajmer
WORK EXPERIENCE 2.0 years)
Your browser may not support display of this image.Expertise
Present Company Profile
M/s SHREE CEMENT LTD,
SHREE CEMENT LTD, Having cement Plant in Beawar and Ras with the capacity of 77.7 lac Tons PA and Power plant with an installed capacity of 361.2MW (150x2MW+18x2+6MW+3MW+16.2MW) in BEAWAR & 197 MW (4x18MW + 2x50 MW + 15MW+ 10MW) in RAS, Plant is fully DCS operated.
Roles
Working as a Shift Incharge in Green Power Plant(WHRB),having knowledge of Boiler and Turbine operation & maintenance.
4 X 80 TPH, 87 Kg/Cm and 515 C, 2 Nos AFBC & 2 Nos CFBC Boilers.
(CVL-Make)
2 X50 MW, 5-Extraction, condensing Turbine (Quingdao, China-Make)
(Control – Digital Control, Woodward Governor,)
3 x 80 Ton, 67 Kg/Cm and 505 C, 2 Nos AFBC & 1 No CFBC Boiler. (CVL-Make)
4 X 18 MW, 3-Extraction, condensing Turbine. (Shin Nippon, Japan-Make)
(Control –Digital Control, Woodward Governor,)
20x5 TPH (HP) AQC Boiler & 7X5 TPH (LP) PH Boiler (WHRB).with 25MW, condensing Turbine.
(Q (Quingdao.China make).
Having knowledge of Erection & commissioning of AQC& PH Boiler.
5
Key Responsibilities
(Technical Services)
Operate the power plant during duty hours to ensure smooth operations maintaining steam and power quality, quantity and delivery at optimum cost, ensuring plant safety and environmental compliance
Project Shift Planning & Control, Trouble Shooting, Preventive actions, Check list & Follow up, Data Compilation, Identification of Abnormality and Corrective actions.
Study of technical projects raised by departments & suggesting improvement and cost reduction. Also identify saving projects for Energy Conservation.
Working out best option in co-ordination with other Depts for the smooth operations
The job has considerable interaction with External Agencies, and 5S working practice and Kaizen activity.
Working Preservation Of Stand-By Equipment Deciding and Implementing Autonomous Maintenance according to WCM norms
Personal Information
Your browser may not support display of this image.
Hobbies
Playing Cricket,Listening to Music
Languages Known
English, Hindi. (Read/write/Speak)
IT Orientation
Proficient knowledge in Microsoft Word, Excel, Outlook, Internet and PowerPoint. Auto cad
Passport No.
Present CTC
3.2 Lacks / Annum
Expected CTC
Negotiable
Place: Beawar, Rajasthan
Date: (SitaRam Bajia)