VAN STEEL
PERSONAL DETAILS
Address: Villa **
Terramar Estates
Sosua, Puerto Plata 57000
Dominican Republic
Email: ******@***.***
VOIP: +1-713-***-****
D.R. Mobile: +1-849-***-****
Nationality: American
Location: Flexible worldwide
PROFILE
A confident and highly accomplished Construction Representative/Manager and Project Manager
with a wealth of experience with greenfield and brownfield onshore/offshore oil and gas pipelines and
processing facilities. With excellent succinct communication skills and a positive can-do attitude this
well-motivated and organized problem solver demonstrates traits which command respect from the
teams he leads. Working well in a team environment and benefitting from keen attention to detail this
capable professional will be an asset to any forward thinking organization.
SKILLS
Construction Management Timely delivery in challenging domestic & international environments
Schedule Management Employs most innovative and effective schedule recovery techniques
Project Management Efficiently plans and manages onshore / offshore oil & gas projects
People Management Strong management of multi-disciplined multi-national workforces
HSES compliance Ensures compliance with Health, Safety, Environment & Security law
Administration Detailed procedures writing, FEED & design constructability reviews
Mentoring Manages and mentors local, multicultural and expatriate workforces
IT Literate Computer literate in MS Office Suites
Production modules, platforms, oil & gas processing plants, onshore and offshore reeled and
conventional pipelines, well pad & flow lines, storage and pressure vessels, welding, piping
fabrication and installation, mechanical equipment and pipeline installation, inspections
QUALIFICATIONS/TRAINING/CERTIFICATES
BOSIET Certification # CBO6648027 Falck Nutec Trinidad & Tobago
Offshore Personal Survival Certificate # PST/43/040582 Suraksha Marine
H2S Safety (July 2005) Certified by Karachaganak Petroleum Operating BV
Certified Welding Inspector # 92110081 (expired) American Welding Society
CAREER HISTORY
2004 – Present Rio Medina Consulting Ltd
Managing numerous foreign contracts in various international locations on a self-employed basis
including the following
March 2012 – January 2013 BG Trinidad & Tobago Ltd. – Amelia, Louisiana
Commissioning / Construction Manager
The project goal was for the successful construction of an 850t gas compression module for lifted
installation on Hibiscus Platform in the North Coast Marine area offshore Trinidad. Involved planning
for 3 platform shutdowns for installation, interconnect, interface and commissioning
• Acted as key interface between the EPIC Contractor and BGTT Operations
• Efficiently coordinated commissioning and construction activities
• Achieved delivery in accordance with Asset, BG Group, national and industry standards
• Ensured process efficiency & compatibility with construction and commissioning best practice
• Delivered onshore and offshore Construction Planning and Execution of the NCMA 4A Project
June 2009 – February 2012 Rio Medina Group, LLC in La Vernia, Texas
Consulted with AcoServ Tunis providing technical assistance for obtaining mechanical piping and
pipeline works including the Gafsa Pipeline Project for ETAP
• Established a joint venture Limited Liability Company with AcoServ with the objective of providing
pipeline and plant services to Eagle Ford Shale
October 2007 – May 2009 BG Tunisia – Hasdrubal Development Project (value c$2.2bn)
Construction Manager
Completion and hand over of the Gabes – LPG Offloading & Reception Facility located in Port of
Gannouch – Gabes, Tunisia. Site installations consisted of export pipeline, 5 propane and 2 butane
bullets in mounded construction with associated above and below grade installations of utility and
product piping, E & I equipment and control facilities
• Managed one of several sites utilizing a full construction management team and support staff
• Full management of approximately 450 site contractor personnel at the peak period
• HSSE, cost and scheduling, contracts coordination, resident engineering, materials and logistics,
construction supervision & inspection in an extremely aggressive schedule
• Coordinated construction planning with Hasdrubal Gas Plant and LPG pipelines being
constructed from Sfax to Gabes
April 2007 – September 2007 Pioneer Natural Resources Tunisia Ltd
Construction Manager – Jenein Nord Field development in the Sahara Desert
Administered Tunis office setup and operations, and coordinated logistics for imported packages i.e.
pipeline pumps and fuel gas skids, etc.
• Worked with camp contractors for location and layout of access roads and sites, directing flow
line & pipeline route surveys
• Assisted EPF (Early Production Facility) contractor for equipment layout & construction of EPF
site and with operations on layout activities for permanent production facilities, collecting
contractor prequalification data for bidding of 2 – 30,000bbl per day oil storage tanks
• Ensured pipeline contractor & their local partner met pipeline installation contract requirements
August 2006 – March 2007 BP Trinidad & Tobago Ltd. – Port of Spain, Trinidad & Tobago
Offshore Installation Construction Manager
Managed activities associated with the load-out and installation of the Mango and Cashima
Platforms, the Amherstia Deck Extension and installed pipelines ensuring they were well planned,
resourced, and conducted safely and efficiently
• Key deliverables were; integrated installation management plan, HSSE plan, scopes of work,
contract support documentation, and other documents to support the program
• Ensured work complied with BPTT policies, IMCA and the appropriate project specifications
• Pre-job audits of personnel, management systems, policies, work practices, vessels and equipt
• Developed Offshore Installation Vessels staffing plan with BP TT Construction Manager
February 2005 – June 2006 Karachaganak Petroleum Operating BV – Kazakhstan
Construction Representative – Contracted through operating partner – BG Kazakhstan
Oversaw contractor’s welding QC & NDT in an extremely high H 2S & high pressure (580 bar)
environment during 2005 Unit 3 & Infield gas injection system plant shutdown
• Mentored the preferred contractor to develop their project management skills giving confidence
to KPO BV to award larger and more complex contract scopes of work for infield development
• Planned and implemented fundamental and practical training of national welding inspectors,
developing a proposal to develop a Welding & NDT Training Center for partner approval
August 2004 – November 2004 BG Exploration & Production India Ltd. – Mumbai
Construction Representative
Managed offshore construction activities for BG India with approximately 300 P.O.B. in a lump sum
contract environment in the Tapti Field on the producing Tapti Compressor Platform for the offshore
installation, testing and commissioning of two SOLAR Booster Compressor packages
• Successful completion within budget with zero lost time injuries or damage to Company assets
May 2004 – July 2004 El Paso Energy – Harvey, Louisiana
Construction Representative
Supervised yard construction of 2 subsea pipeline jumpers, one 14” and one 20” using metrology
provided by offshore site for installation on Cameron Highway Pipeline Project in Gulf of Mexico
• Completed on schedule with no lost time injuries and fit to a tee in 5800’ W.D.
August 2003 – December 2003 ChevronTexaco (CABGOC) – Offshore, Malongo, Cabinda, Angola
Construction Representative
Monitored and supervised the Malongo Critical Pipeline Project (MCPL) QA/QC activities for the re-
laying of approx 63,800 feet of 24” x .625” pipeline from GIP – Fox Platform to Malongo North Jetty,
including mid-water tie-in and stalking on risers
• Assisted and motivated the contractor with their second attempt at delivering a quality pipeline to
ensure compliance with client specifications
May 2003 – July 2003 El Paso Energy – Koje City, South Korea
Construction QA Engineering Consultant
Audited then managed assembly of DOT documentation for Marco Polo TLP hull 12” and 18” welded
oil & gas export pipeline riser systems at Samsung Heavy Industries (SHI) site offices
• Mentored SHI to ensure understanding of all the DOT requirements for a timely delivery
February 2003 – April 2003 ChevronTexaco – Mobile, Alabama
Construction QC Representative – for the Matterhorn Project
Monitored and verified the contractor’s welding quality assurance program for spool base
construction of 16 miles of 8” pipeline using Serimer Dasa automatic welding and Shaw AUT
Early Career
2002 QA/QC Manager Global Offshore International – Houston, Texas
2001 Construction Representative CMS Nomeco Congo, Inc
2000 Construction Representative ChevronTexaco (CABGOC) – Offshore Malongo
1999 – 2000 Quality Assurance Manager British Gas Trinidad & Tobago Ltd. – Houston, Texas
1998 – 1999 Piping Systems Team Leader R & B Falcon Exploration Co. – Ulsan, South Korea
1997 – 1998 Chief Inspector Elf Exploration Inc. – Houston, Texas
1997 – 1998 Construction Superintendent Mustang Engineering, Inc. – Malakoff, Texas
1996 – 1997 Construction Superintendent Offshore Consultants, Inc. – Houston, Texas
1995 – 1996 Piping Superintendent Global Marine Drilling Company – Brownsville, Texas
1994 – 1995 Construction Superintendent Aker Omega, Inc. – Houston, Texas
1994 Senior Construction Inspector Zaafarana Oil Company (ZAFCO – BG/EGPC JV)