Curricullum Vitae
Full Name : Rachmat Hidayatullah Akbar
Gender : Male
Age : 26
Place and Date of Birth : Jakarta, August 13th 1986
Marital Status : Married
Nationality : Indonesia
Religion : Islam
Languages : Indonesian & English
Address : Jl. Simponi 1 Block C No. 7 Komp Garuda Cipondoh Permai,
Tangerang 15148, Banten - Indonesia
Contact Person : +628*********
Email : abszd2@r.postjobfree.com
. 1992 - 1998 (Qualified) : Elementary School in SDN Cipondoh 02,
Tangerang
. 1998 - 2001 (Qualified) : Junior High School in SLTPN 4, Tangerang
. 2001 - 2004 (Qualified) : Vocational High School in SMK Telkom Sandhy
Putra Jakarta
Majoring : Information Technology
. 2005 - 2011 (Qualified) : Bachelor Degree in Galuh University
Majoring : Industrial Engineering (GPA : 2.92)
. 2000 - 2001(Certified) : English Course at LB-
LIA
. Feb' 2003 (Certified) : On Job
Training at PT. Telkom DIVRE II UNR Area Bogor
. Sep'- Oct' 2003 (Certified) : On Job Training at PT.
Telkom DIVRE II UNR Area Tangerang
. April 2006 : Learned about BTS
for Motorolla (Description & Installation, Operation
& Maintenance, Commisioning) by PT. DDF Asia
. April 2006 : Training about RBS
& MiniLink for Ericsson (Description & Installation,
Operation & Maintenance, Commisioning) by Ericsson
Indonesia
. September 2010 (Certified) : Minilink Advance
Troubleshooting Workshop (by EID)
Ericsson Indonesia (30 July 2012 - April 2013)
Type of company : Telecommunication
Division : RAN Depl QASIS & Site Supervision
Position : ITC Supervisor (November 2012 - Present)
RBS Engineer (30 July 2012- October 2012)
Project History : Indosat Roll Out & Modernize Project
Location : Jakarta - Indonesia
Responsibilty :
. Supervise ASP (Ericsson subcontractor) Installation, Commisioning
Integration, Upgrade, O&M the Ericsson RBS 2000 (2G), 3000 (3G) & 6000
(2G/3G).
. Supervise ASP (Ericsson subcontractor) Installation for Antenna
Tripleband/Monster.
. Configuration of U900 (WCDMA900)
. Configuration & Upgrade software TCU
. Integration New Site (when ASP can't handle)
. First Line Troubleshooting (troubleshooting of common issues, when ASP
can't handle)
. Supervise Execution NIW (Swap Out, Modernization, Upgrade, 2nd carrier)
. Pre ATP & ATP with ASP & Costumer
. Troubleshooting for new sites before OA, in case ASP can't handle it
. Troubleshooting for alarm, in case ASP can't handle it
. Escalation for technical issues that can't handle by ASP
. Knowledge transfer for new process or network element to ASP
. Quality Audit Installation and HSE Implementation
. Manage and coordinate with subcontractor to do respective acceptance test
and number of visit on sites to guarantee the quality of the installation
on each site
. Manage subcontractors related RBS equipment installation of Ericsson
According to MoP and roll out plan
. Perform Site Quality Audit with doing PAT/Pre-Audit with Costumer
. Ensured that all PAT site folder has the correct information and correct
documents
. Daily & Weekly report.
Ericsson Indonesia (1 May 2011 - 30 June 2012)
Type of company : Telecommunication
Division : RAN Expertise Area Department
Position : Transmission Engineer
Project History : XL Transmission QoS Project (March 2012
- June 2012)
XL Axiata Mobile Broadband Project (May 2011 -
February 2012)
Location : Jakarta - Indonesia
Responsibilty :
. Support, Monitoring and Coordination with Costumer & Ericsson
subcontractor team to doing Implementation (Installation, Commisioning,
Integration, Troubleshooting, Upgrade, O&M) the Ericsson Minilink
(Minilink e-Classic, Hi-Cap & TN) for costumer standaritation and
specification.
. Support for Setting, Configuration and Cross Connect Ethernet / VLAN at
ETU3 on Minilink TN-R4 for Implementation Iub Over IP (Dual Stack) for
Node-B and Support Node-B team to migration.
. Support for Setting, Configuration and Cross Connect Ethernet / VLAN & IP
DCN on NEC IPASO Link
. Support for Setting, Configuration QoS on Minilink Traffic Node.
. Verification Before and After Config QoS.
. Support ATP Documentation for QoS.
. Validation E2E Ethernet Traffic
. Involved to Upgrade software from TN-R2 to TN-R3 to TN-R4 and Minilink
HiCap.
. Involved to carry out troubleshooting to clear any alarm occur in
Minilink TN and High Capacity.
. Preparing & supervising team for cross connect end to end and Integration
Costumer site.
. Supporting team for Integration, Migration, Moving Traffic and Rehoming.
. Support RBS 3G Team for Integration & Troubleshooting.
. Support Swap / Cut Over Activity.
. Do Solving Cabling and Configuration Problem
. Responsible for Cross Connect / Integration / Patching E1 from BSC to
BTS/RBS.
. Supporting the Customer Team for doing monitoring NMS Network.
. Ensure the Link Budget that are in achievable level for the
costumer/operator.
. Ensure for the KPI Installation are meet the demand of the
operator/costumer.
. Manage and coordinate with Subcontractor to do respective acceptance test
and number of visits on sites to guarantee the quality of the installation
on place for each sites
. Manage of Subcontractors related to TX Network equipment installation of
Ericsson according to Standaritation and roll out plan
. Perform Site Quality Audit with doing PAT/Pre-Audit with Costumer
. Ensured that all PAT site folder has the correct information and correct
documents
. Daily & Weekly report.
Ericsson AB Papua New Guinea (January 2011 - March 2011)
Type of company : Telecommunication
Division : RAN Expertise Area Department
Position : RBS - Transmission Support Engineer
Project : Digicel
Location : Port Moresby - Papua New Guinea
Responsibilty :
. Support and Coordination with Costumer & Ericsson Installation Team to
doing Implementation (Installation, Commisioning, Integration,
Troubleshooting, Upgrade, O&M) the Ericsson RBS & Minilink (Minilink e-
Classic, Hi-Cap & TN) for costumer standaritation and specification.
. Support for Setting, Configuration and Cross Connect Ethernet / VLAN on
Minilink TN-R4 for Implementation Iub Over IP (Dual Stack) for Node-B and
Support Node-B team to migration.
. Swap out from RBS2000 family to RBS 6000 family.
. Upgrade Capacity RBS2000 and RBS6000 (2116, 2216, 2116, 6201, 6202)
. Involved to Upgrade software from TN-R2 to TN-R3 to TN-R4 and High
Capacity.
. Involved to carry out troubleshooting to clear any alarm occur in RBS,
Minilink TN and High Capacity.
. Supporting team for Integration, Migration, Moving Traffic and Rehoming.
. Support Swap / Cut Over Activity.
. Do Solving Cabling and Configuration Problem
. Coordinating and delivery material to the Site.
. Acceptance Test Procedure with customer
. Daily & Weekly report
Ericsson Indonesia (April 2007 - December 2010)
Type of company : Telecommunication
Division : RAN Expertise Area Department
Position : Tranmission Engineer
Project History : XL Axiata Mobile Broadband Project
(March 2010 - December 2010)
Indosat 3G Project (January 2009 - February 2010)
Telkomel Mars Project (July 2008 - December 2009)
Indosat 2G & 3G Project (April 2007 - April 2008)
Location : Jakarta, South Sumatera, Bali, Lombok & Sumbawa
- Indonesia
Responsibilty :
. Support, Monitoring and Coordination with Costumer & Ericsson
subcontractor team to doing Implementation (Installation, Commisioning,
Integration, Troubleshooting, Upgrade, O&M) the Ericsson Minilink
(Minilink e-Classic, Hi-Cap & TN) for costumer standaritation and
specification.
. Support for Setting, Configuration and Cross Connect Ethernet / VLAN at
ETU3 on Minilink TN-R4 for Implementation Iub Over IP (Dual Stack) for
Node-B and Support Node-B team to migration.
. Support SoM Engineer to add new Nodes (TN, HC & SAU)
. Validation E2E Ethernet Traffic
. Involved to Upgrade software from TN-R2 to TN-R3 to TN-R4 and Minilink
HiCap.
. Involved to carry out troubleshooting to clear any alarm occur in
Minilink TN and High Capacity.
. Preparing & supervising team for cross connect end to end and Integration
Costumer site.
. Supporting team for Integration, Migration, Moving Traffic and Rehoming.
. Support RBS 2G and 3G Team for Integration & Troubleshooting.
. Support Swap / Cut Over Activity.
. Support TND & Costumer to plan Link Route and Plan Muxes for Node-B
. Do Solving Cabling and Configuration Problem
. Do Design for Ethernet configuration and VLAN for RBS 3G
. Do Design for Transmission AMM configuration for every hop installed
. Preparing Cross connection RXI with Marconi (OMS1200) equipment.
. Responsible for Cross Connect / Integration / Patching E1 from BSC to
BTS/RBS.
. Coordination the Ericsson subcont for doing connecting NCC Cable Minilink
E.
. Supporting the Customer Team for doing monitoring NMS Network.
. Ensure the Link Budget that are in achievable level for the
costumer/operator.
. Ensure for the KPI Installation are meet the demand of the
operator/costumer.
. Coordinating and delivery material to the Site.
. Supervise in Acceptance Test Procedure with customer
. Manage and coordinate with Subcontractor to do respective acceptance test
and number of visits on sites to guarantee the quality of the installation
on place for each sites
. Manage of Subcontractors related to TX Network equipment installation of
Ericsson according to Standaritation and roll out plan
. Perform Site Quality Audit with doing PAT/Pre-Audit with Costumer
. Ensured that all PAT site folder has the correct information and correct
documents
. Daily & Weekly report.
Bhakti Surya Telecomindo (December 2006 - March 2007)
Type of company : Telecommunication
Division : ITC
Position : Field Engineer
Project : Siemens-HCPT (Hutchison Telecom) & Indosat
2G-3G
Location : Jakarta - Indonesia
Responsibilty :
. Performed Installation, Commisioning, Integration and Troubleshooting the
Ericsson RBS 2000 - 3000 Family and Minilink (Minilink e-Classic, Hi-Cap &
Traffic Node) for costumer Standaritation and specification.
. Integration, Testing and Troubleshooting RBS 2000 Families (2106 & 2206)
. Responsible for Cross Connect / Integration / Patching E1 from BSC to
BTS/RBS.
. Supporting team to Installation Feeder on IBS Site.
. Supporting team doing VSWR Result.
. Doing Drive Test performance for IBS site.
. Daily & Weekly report.
DDF Asia (January 2006 - November 2006)
Type of company : Telecommunication
Division : ITC
Position : Field Engineer & Area Coordinator
Project : Telkomsel Tinem
Location : Kalimantan and East Java - Indonesia
Responsibilty :
. Performed Installation, Commisioning, Integratiomn and Troubleshooting
the BTS Motorola, Ericsson for RBS 2000 Family and Minilink (Minilink e-
Classic, Hi-Cap & Traffic Node) for costumer Standaritation and
specification.
. Integration, Testing and Troubleshooting RBS 2000 Families (2106 & 2206)
. Re-Commisioning and Integration RBS 2000 Families (2106 & 2206) for
Upgrade and Downgrade
. Responsible for Cross Connect / Integration / Patching E1 from BSC to
BTS/RBS.
. Doing Drive Test performance for New Site and Existing Site.
. Cut Over / Swap from BTS Motorola to RBS Ericsson for Telkomsel Tinem
Project.
. Acceptance Test Procedure with customer for Telkomsel Indonesia Project
. Daily & Weekly report
Telkom Tbk (September 2004 - December 2005)
Type of company : Telecommunication
Division : SISFO & Wireless Fixed Network (Telkom
Flexi)
Position : Maintenance Engineer
Location : Divre-II Jakarta (Jadebotabek
Responsibilty :
. Maintenance & Troubleshooting PABX System.
. Troubleshooting LAN connection.
. Daily & Weekly report.
. Having knowledge on handling Motorolla equipment such as
BTS
. Having knowledge on handling Ericsson equipment such as
BBS, BSC, RBS and Minilink
. Having knowledge on handling Marconi (OMS1240) equipment
such as Transmission
. Having knowledge on handling NEC IPASO Link equipmennt
. Having knowledge on handling Hariff equipment such as
Rectifier
. Having strong leadership, analytical and problem solving
skills
. Fast learning, self motivated, dynamic, target oriented,
good team work, willing traveling
. Excellent in managerial to lead small team in certain area, controlling
and reporting the project progress to project manager
. Excellent skill in cross connect & integration implementation
. Excellent in using various software's as : Microsoft Office Package,
AutoCad2004, Internet Explorer, MiniLink Service Manager (MSM), MiniLink
Craft (1.0 - 2.15), OMT (29_3-R49H), WinFIOL (BSC-Integrator), Moshell,
Element Manager, TEMS Investigation, PROCOMM Plus, PNMT
. Install, commisioning, and troubleshooting both in Minilink system
. Telecommunication test equipment as : TEMS, BER Tester, Anritsu Site
Master, EXFO Ethernet Tester.
. Jan' - Nov' 2006 : Installataion,
Commisioning, Troubleshooting & ATP Minilink, RBS
Ericsson & BTS Motorola for Telkomsel Project in
Regional Pontianak, Tarakan, Banjarmasin and
Palangkaraya
. Dec' 2006 - March 2007 : Drive Test coverage
area for Siemens-HCPT Project in Jakarta, Bogor,
Tangerang and Bekasi
. Apr' 2007 - Dec 2010 : Implementation of
Transmission equipment for Ericsson such as Minilink
E-Classic, Hi-Cap, Traffic Node (R2, R3 & R4), and
Implementation Cross-Connect (New, Upgrade, EDGE and
Ethernet) for Indosat Project 2G Roll Out 2006-2007,
Telkomsel Mars Project & Indosat 3G Roll Out 2007-
2008 also XL Mobile Broadband & Digicel project.
. Jan' 2011 - March 2011 : Implementation of
RBS & Minilink for Digicel PNG Project
. May 2011 - June 2012 : Implementation of Ethernet /
IP Transport & Traffic Class QoS XL Project
1. Rohannizam Ramly : Costumer Project Manager
Ericsson Australia Pty Ltd
Mobile Phone : +614******** / +628**********
Email : abszd2@r.postjobfree.com
2. Erwin Kurniawan : Coustomer Operation Manager - XL Axiata
Project
PT. Ericsson Indonesia
Mobile Phone : +628********* / +628**********
Email : abszd2@r.postjobfree.com
3. Albert B. Madriaga : CSD Manager - RAN Site Solution A
Ericsson Telecommunications Philippines, Inc. (ENP)
Mobile Phone : +639*********
Email : abszd2@r.postjobfree.com
4. M. Raymil Mirza : Competence Sub Domain Manager RAN Transport
2
PT. Ericsson Indonesia
Mobile Phone : +628*********
Email : abszd2@r.postjobfree.com
5. Muhamad Sumarlan Rachmat : Competence Sub Domain Manager RAN Transport
1
PT. Ericsson Indonesia
Mobile Phone : +628********
Email : abszd2@r.postjobfree.com
I always believe that no matter how long the journey, there is always one
single step to start it. And there is nothing impossible to do, if there
are strong wil to learn and experience. I am hard worker, easy learned,
good analytical, able to work independently or in team, open to be place
anywhere.
I realize that i only have a little experience in cellular technology, but
serving for about 8 years in the field and for my experience, I believe
that will be an advantage. Giving the best for the company which hires me.
Now, I want to build good career in any field or work so in about 1 years
to go I already work for company which give me good career, remuneration,
working satisfaction and allowance.
I declare details to be true and complete,
Rachmat Hidayatullah Akbar
Personal Details
Academic Qualification and Qualified
Professional Qualification and Certified
Work Experience
Work Experience
Qualification
Technical Skills
Handled Project
Reference
Executive Summary / Self Description