**'
*A&'$20""0B020C91D@/0AEF1@'
'
! !
Seeking an engineering Full-Time position, in which I can demonstrate and expand
%*!
my knowledge, skills and abilities that will eventually help me enrich my career and
personal life.
!
0*! Jul. 2012- Present AutoGrupo- Nissan, San Juan P.R.
Master Kaizen- Dealer Standards Improvement Certification (DSI)
This job and project involves the following:
! Perform the analysis of the processes through Industrial Engineering tools in
order to increase the productivity of work areas and contribute to customer
satisfaction. Also, develop operational processes for various areas, in order to
maintain the technical, human and financial company elements under a
continuous improvement system to optimize profits and quality customer
service.
! Designing internal audits for the quality system in order to verify the
operation and implement improvement actions.
! Design or re-design procedures for the various areas of the dealership, in
order to implement processes to optimize their operation and comply with the
guidelines as well as the health and safety regulations in the work areas.
! Working under the ISO norm.
Nov. 2011- May 10, 2012 Capstone Project at AKM MFG., INC, San Juan PR
Industrial Engineer Student – Warehouse Design
This warehouse project design impact and improve the following;
! Product process flow
! Space optimization
! Fast response of raw material for manufacturing purposes
! Control of inventory
! Control of quality by means of receiving & incoming inspections
! Evaluate, develops and improves manufacturing methods for quality control
standards by the use of Lean, Six Sigma and/or Lean Six Sigma Methods that
result an lower cost to the company.
Aug. 2011– Dec. 2011 Circulation Area at University of Turabo Library
Gurabo, P.R.
Work Systems Design Engineering Project
This project involves the following:
! Improve ergonomically the Circulation area of the University of Turabo
Library.
! To analyze the problem the engineering standards as RULA, Noise and
Illumination were useful.
! Upon completion of the project will organize the work area so that was safe
for the employee, in compliance with OSHA regulations. Was oriented to the
employees of the correct postures. Using existing resources, not sloped or
expenses to implement the new changes.
Jan.2011- May.2011 Arroyo Distribution Group Las Piedras, P.R.
Work Measurement Engineering Project
This project involves the following:
! Calculation of work sampling to small companies.
! The company is having los approximately $1000 per day due to delays in
processing orders.
! The study results showed that there was a great loss of time in activities that
were not added value.
! The recommendations given are that adopting the method of 5’s to reorganize
the area and tools. Also use the method of Just in Time to avoid excess
inventory and process having the quantity demanded and have the necessary
equipment just for the week.
Aug 2010- Dec. 2010 Puerto Rico Energy Center at University of Turabo
Gurabo, P.R.
Industrial Safety and Health Management Project – Create an Safety Manual
! Provide engineering support to the Safety Manual that is a key element in the
pursuit of safety in an industry.
! The project requires the student to review both OSHA and PR OSHA
regulations in order to write a compliant manual that gives guidelines that
prevent accidents and lesions for workers.
Jan. 2008- May. 2008 Municipality of Mayagüéz at Mayagüéz, P.R.
Engineering Management Project- Redesign and Improvements to the Road
Network of Mayaguez City
Achievements:
! The cost estimates meet the requirements of the current cost.
! Use existing stops and the design was so comfortable and safe using
sustainability as a goal.
! The second goal in the closing of the project was the approval of the client.
! Obtained the necessary permits to implement the suggested design.
01'
.'! !#$2/%3'4/%'50 56'**778'
5912 7;7
0A&'$20""0B020C91D@/0AEF1@'
'
! '
Aug. 2012 – Present Turabo University Gurabo, P.R.
+12&3'(4/!
! Quality Management MBA
2010- May 2012 Turabo University Gurabo, P.R.
! Industrial & Management Engineering BS
2004-2010 University of Puerto Rico Mayagüez, P.R.
! Industrial Engineering BS
! '
! Quality System Requirements
5.3 60!
! OSHA
! Lean, 5’s and Six Sigma
! Industrial Safety and Health Management
! Project Management
! Plastics: Polymers. Chemicals. Properties. Features. Origin. Elaboration. Chemical
composition. Classification. Applications. Fabrication methods. Use Recycling.
Environmental problems. Thermoplastics. Thermosets. Elastomers.
'
'
! '
! Understanding of English and Spanish.
78(990!
! Outstanding leadership abilities, very responsible, fast learner, can work
without supervision, can multi-task, and efficient with cooperative work.
! Computer and Software experience: Windows Vista/XP, MS office,
AutoCAD 2004, SIMIO, Visio, Minitab, Matlab, Visual Basic, Access.
'
'
! '
! Available upon request.
'