Dionell E. Talley
Toledo, Ohio 43614
Cell: 419-***-**** Home: 419-***-****
E- mail: *********@*****.***
Position Sought :
Professional Objective: To secure a position as a Instrument
Technician or Technician utilizing my skills and experience relating to
instrumentation and controls systems within the Refinery environment.
Skills :
Strong proficiency in instrumentation and controls systems designed
from conventional relay logic as well as PLC logic.
Hands on experience with control panel wiring, PLC programming
using GE Fanuc PLC and troubleshooting.
Ability to develop relay and PLC logic schematic from written or
verbal functional descriptions for application in the process and
manufacturing industries.
Ability to read P&ID drawings, tune control loops, and calibrate
process instruments such as pressure, flow, and temperature devices.
Proficient in the use of most electronic test equipment and can learn
quickly and effectively on unfamiliar test equipment.
Professional Work Experience :
Toledo Refining Company, Oregon Ohio- Technician
Employment Dates- 11/2011-05/2012
Entered all electrical and instrumentation asset information into
EmPac.
Obtained asset tag information from Electrical and Instrumentation
Engineers.
Obtained all electrical and instrumentation asset information from
field, various engineering drawings (electrical, loop, p&id, panel and
cable schedules, one-line; etc.) work scope, By any other means
appropriate means necessary for Empac.
Work with Capital Projects Engineers to develop Asset Data
Spreadsheets (ADS) to ensure that all field and equipment
information is captured on ADS.
Use ADS to track Empac asset entries.
Provided weekly report updates on assignment progress to Capital
Projects Engineering Managers.
Sunoco Toledo Refinery, Oregon, Ohio- Instrument Technician
Dionell E. Talley Page 2
Employment Dates 6/2009- 6/2010
Performed an audit of all pressure, flow, temperature, product and
CEM analyzers, and other alarms and controls devices in the refinery
process.
Worked on a team with other technicians making daily and weekly
report to E/I Supervisor and Engineering staff.
Performed PM program OSHA 1910 audit tracking and verifying of
all instrumentation throughout 10 plant facility.
Proficient with the use of Microsoft Office Word and Excel. Proficient
withthe use of EmPac, SAP and maintenance base software.
RMF- Laborer Steward at Toledo Refinery
11/2008-2/2009
Consent Decree (C/D) project.
Worked with Sunoco and Fluor safety departments.
Handled all disputes and grievances for laborers.
Worked with Fluor Civil Construction Management.
Worked with RMF maintenance and Consent Decree Laborer staff.
Sunoco Project management staff.
Bp Oil - Washington Group Oregon, Ohio- Laborer Foreman
/Leadman.
Employment Dates- 9/2003- 11/2008
Supervised the Delta Valve Crew Bp turnaround.
Supervised a crew of laborers 24 on two Coker plants.
Support craft for boilermakers, pipefitters,ironworkers, electricians.
Worked various turnarounds.
Sunoco Toledo Refinery, Oregon, Ohio- Laborer
Employment Dates 9/2003-4/2006
Worked various turnarounds.
Worked with Cherne on Plant on Plant 9 new construction.
Worked on Viola water treatment facility.
Education : University of Toledo Toledo, Ohio
Electrical Engineering 2013
WTTI Toledo,Ohio
Instrument and Control Certificate 2010
Turner-Lathrop School Construction Management Toledo,Ohio
Certificate Construction,Project,Contractor Mgmt 2009
OSHA- Safety Courses Toledo,Ohio
Dionell E. Talley Page 3
Certification- 8,10,16 hour 2003-2009
References : Available upon request