ELVIS LIMA DA COSTA
Brazilian, Birth. **/**/***0, Married, 2 children
Tel.: +55-15-322*-**** / Mobile: +55-15-816*-**** / *********@*****.***.**
MANUFACTURING / ENGINEERING / PROCESS / PROJECT / OUTSOURCING
QUALIFICATIONS
Professional with 13 years of experience in engineering, manufacturing processes and project
management in large multinational companies;
Coordinating the launch of new manufacturing sites, as well as the teams involved in new programs
by coordinating their activities and tasks. Definitions of capital expenditure on capital assets (CAPEX) .
New products introduction: Development of tools, fixtures and test devices. Analysis of manufacturing
feasibility with the product development team. Coordination in defining layouts, calculation and
optimization of factory capacity.
Applying the concepts of APQP, PPAP, FMEA, Six Sigma, Kaizen, Poka-Yoke, 8D, ESD.
Knowledge in the areas of: Plastics (welding, injection, assembly, painting and pad printing) and
electronics (SMT, PTH and assembly).
Monitoring the production process of goods, supply chain, tracking KPIs, coordination of engineering
changes / procedures and leadership studies of continuous improvement in production processes
through Lean Manufacturing.
Calm Personality, skillful to work in teams and under strong pressure. Clear communication with all
levels, including customers during presentation of quotations, project execution and training.
SCHOLARSHIP
Jan/2001 - DeC/2006 Universidade Cruzeiro do Sul São Paulo – SP
BS in Mechanical Engineering with emphasis on automation.
Aug/1995 – Dec/1999 SENAI “Roberto Símonsen” São Paulo – SP
Mechanic Technician.
FEMEA – SETEC Advice.
AQMPP – Certificate of approval SETEC / PSA.
APQP – Visteon Automotive Systems.
LANGUAGES
Fluent English, intermediate Spanish and basic French.
PROFESSIONAL EXPERIENCE
Jun/2010–Mar/2013 Research In Motion - RIM (BlackBerry)
Large multinational Canadian company manufacturer of telecommunications devices.
Technical Operations Support Specialist
• Reporting directly to director of outsourcing manufacturing;
• Management of contract manufacturing supplier s activities (Sao Paulo BR-Flextronics, Jabil
Guadalajara, MX, MX-Monterrey Celestica, Brightstar-Rio Grande AR);
• Activities undertaken since qualification audit, assessment of CAPEX, transfer products, on-site
training, line readiness audits of lines and current production management;
Technical reference between management teams of manufacturing processes at BlackBerry
•
(Canada) and contract manufacturing suppliers to develop processes related to mass production
of mobile devices.
Main results:
Leadership of a reduction project for “X” product, resulting in increase of units / person / hour
(UPPH) in assembly 9.64 / h to 11.5 / h (19.3% increase). Product "Y" in the process of assembling
UPPH 6:45 UPPH to 12.64 (96.88% increase), configuration and packaging process from 9.9 to
12.9 UPPH UPPH (30.3% increase);
Leadership of a Reduction project to reduce level of discarded phones (bone pile) in 3941 to 50
units in five weeks;
Support the launch of 2 manufacturing sites and 9 new products.
Mar/2006-May/2010 Visteon Automotive Systems Guarulhos, SP.
Manufacturing engineer
Large American Multinational manufacturer of automotive components.
• Reporting directly to the Forward Models Manager and supervision of two direct employees;
• Development of activities as specialist in welding of automotive plastic parts, responsible for
plants in Brazil and Argentina;
• Project Leadership: Responsible for evaluation of project investment, tools developments, fixtures
and devices for the production process, layout definition and productive capacity for the site;
• Implementation of engineering changes and cost reduction actions, APQP management meetings;
• Maintenance of current products, improvements in the production process as well as 6 Sigma
studies.
• Main results:
PSA T3 and Honda TF0A: Reduction of direct labor projects through lean manufacturing (6.1
•
welding operators), reduced investment in acquiring new equipment through adaptations of
existing equipment in the plant (Cost avoidance U.S. $ 184k);
Release of 7 new projects from different manufacturers (PSA-Peugeot/Citröen, Honda, GM,
•
Renault / Nissan).
Nov/2000-Feb/2006 Visteon Automotive Systems Guarulhos, SP.
Senior Manufacturing Technician
Large American Multinational manufacturer of automotive components .
• Development of activities in the areas of SMT / Auto Insertion (PTH) and Soldering;
• Launch of 4 new products: Preparation of lines, capacity calculations and development of new
tequipments to meet the demand of production;
• Implementation of engineering changes in current products;
• Product development with the product engineering;
• Equipment maintenance and productivity of lines / production cells and assembly cost reduction
actions through nationalization of spare parts of equipment.
INTERNATIONAL EXPOSURE
U.S. / Mexico-Sep / Aug 2008 – Plastic Welding Training;
Switzerland / Italy - Mar 2009 - Development and validation of new supplier of plastic welding
equipment, purchase and approval prior to shipment authorization;
Mexico - Aug / Nov / Dec 2010, Mar 2011 - Technical support to manufacturing operations;
Canada - Jun / Sep / Nov 2010, Aug 2011, Mar/2012 - Training sessions for new products;
Argentina - Sep 2007 Jun 2011 to Mar 2013 - Launch of new website.
COURSES
Plastic Welding Technologies – Detroit-US / Monterrey-MX 2008
BlackBerry Manufacturing processes – Waterloo-Canada