Post Job Free
Sign in

Engineer Project

Location:
Raipur, CT, India
Salary:
(subject to negotiation)
Posted:
April 18, 2013

Contact this candidate

Resume:

`

M.DILIPCHAND

Contact: 094******** (M) E-Mail: **********.*@*****.***

Present Address: Flat no: 405, Vishnu Apartments,, Visakhapatnam, Vizag -

530032

Seeking middle level assignments in Project Management / Maintenance &

Operations / Erection & Commissioning / Quality Assurance with an

organization

Location Preference: Any where in India &

Abroad

PROFESSIONAL SYNOPSIS

A result driven professional with over 7 years of experience in Ports,

Mining and Material Handling Sector and executed roles in Project

Management, Maintenance & Operations, Erection, Testing & Commissioning,

Quality Assurance and Team Management. Currently designated as Senior

Engineer with Sandvik Mining Systems. Looking after Structural Fabrication,

Erection & Equipment of conveyors, machines (Stacker cum Reclaimer, Blender

Reclaimer, Twin boom Stacker) Skilful in executing and ensuring delivery of

Raw Material Handling Plant projects within the time and cost parameters;

deftness in managing the erection, testing, commissioning & maintenance of

a wide range of equipments.. A strategic planner with adeptness in

implementing cost reduction measures to achieve savings in terms of

material and procurement. Effectively conceptualized and completed various

operations pertaining to the up keeping of equipment and accountable for

commissioning of RMHS unit. An effective communicator with strong

analytical, problem solving & organizational abilities.

ORGANISATIONAL EXPERIENCE

Since May'12 at Sandvik Mining Systems, Visakhapatnam

Sr. Engineer

Oct'07 - May'12 at M.N. Dastur & Co., Private Limited, Visakhapatnam

Sr. Engineer

May'06 - Sep'07 at M/s Tijo Constructions, Kerala

Site Engineer

CORE COMPETENCIES

Project Planning & Management

. Managing projects activities involving working out various requirements

with respect to utilities, machines, manpower & monitoring overall

project operations for ensuring timely completion.

. Preparing & implementing operating procedures and work instructions;

managing and handling the process flow.

. Preparing Cost estimation and Rate analysis for an extra item and

preparing B.O.Q.

Erection & Commissioning

. Anchoring and planning erection & commissioning activities for

equipments/machinery/structures.

. Installing and commissioning as well as conducting tests & inspections to

ensure operational effectiveness of utilities and equipments.

Manpower Management

. Managing a team of executives and guiding site staff members to address &

resolve performance bottlenecks.

. Directing, leading and motivating workforce; imparting continuous on job

training for accomplishing

greater operational effectiveness/ efficiency.

. Working on succession planning of the workforce, shift management

activities, appraising the member's

Performance & providing feedback.

. Resolving interpersonal issues & working towards a harmonious work

environment.

MAJOR ATTAINMENTS ACROSS THE TENURES.

PROJECT (4) :- NMDC MINES, KIRANDUL SITE, CHATTISGARH (Dec'12-

present)

CLIENT :- NATIONAL MINERAL DEVELOPMENT CORPORATION

(N.M.D.C)

ROLE :- EQUIPMENT ENGINEER (CONVEYORING SYSTEM &

MACHINES)

DESIGNATION :- SENIOR ENGINEER - PROJECTS

PROJECT COST :- 50 MILLON USD

At M/s Sandvik Mining Systems, Kirandul site

Projects Executed:

: At NMDC MINES, KIRANDUL SITE, CHATTISGARH

: Kirandul

. Erection, Installation & Alignment of down-hill conveyors of 4.5

kilometres long Regenerative type conveying system with both horizontal

and vertical curves for Iron-ore Handling.

. Interaction with clients and co-ordination with Sub-contractors for the

proper installation.

. Erection and commissioning of Shuttle conveyors and Reversible conveyors

for feeding Iron ore into existing system.

. Erection, Installation, Alignment and Commissioning of Apron feeders

for Iron ore conveyors.

. Erection of chutes, hoppers, stone boxes, Baffle plates etc for

conveying material

. Preparing monthly micro-plan, weekly planning, man-power allotment &

daily progress reports (DPR) of the Project

. Preparing check list for the machinery and conveying system.

. Erection and commission of Hydraulics for Bi-parting gates and diverter

gates.

. Coordinating Engineering and Project progress schedule.

. Installing and commissioning as well as conducting tests & inspections to

ensure operational effectiveness of utilities and equipments.

. Micro level planning at site for every activity.

. Studying of Drawings thoroughly for the Sequence of Equipment Erection.

. Preparation of Ground assembly schemes of structures and erection.

. Commissioning of all mechanical equipments with hot and cold trails runs.

. Preparation of Erection Schemes for Critical erection as per Crane load

Charts.

. Preparation of Erection protocols, checking the alignment schemes as per

the tolerance, liquidating the defects.

. Planning and Preparation of schedules for the daily activities as per the

project requirement.

. Supervision of work flow by considering workmen and machine safety.

. Anchoring and planning erection & commissioning activities for

equipments/machinery/structures.

. Monitoring the trail run of installed equipment by considering rating of

the equipment.

. Maintaining Documents related to Material Requirements, Machines used,

Manpower and all other Operations carried in the site

PROJECT (3) :- VISAKHAPATNAM GENERAL CARGO BERTH (Since May'12-

Dec'12)

CLIENT :- VEDANTA

ROLE :- EQUIPMENT ENGINEER (CONVEYORING SYSTEM &

MACHINES)

DESIGNATION :- SENIOR ENGINEER - PROJECTS

PROJECT COST :- 110 MILLON USD

At M/s Sandvik Mining Systems, Vizag

Projects Executed:

: At VISAKHAPATNAM GENERAL CARGO BERTH

: Visakhapatnam Port Trust

. Interaction with clients and co-ordination with Sub-contractors for the

proper installation.

. Coordinating Green field project with budget of $110 Million within dead-

lines and budget.

. Erection and commissioning of Stacker cum Reclaimer for Coal Stacking

(6500 T.P.H) and Reclaiming circuit (3250 T.P.H)

. Erection and Commissioning of Hydraulics for diverter gates.

. Erection and commissioning of Coal conveying system from Stacking circuit

to Reclaiming circuit.

. Erection of chutes, hoppers, stone boxes, Baffle plates etc for

conveying material

. Erection, Installation & Alignment of mechanical equipments

Magnetic separators, Belt weigh scales, Pulse metal detectors,

Primary samplers for conveying system

. Commissioning of all drives with scoop couplings of 500PST, 550PST,

650PST.

. Preparing monthly micro-plan, weekly planning, man-power allotment &

daily progress reports (DPR) of the Project

. Preparing check list for the Machines and Conveying system.

. Supervised erection and commissioning of electrical safety switches like

P.C.S, B.S.S, Z.S.S, Chute block switch, belt tear switches for the

project.

. Installing and commissioning as well as conducting tests & inspections to

ensure operational effectiveness of utilities and equipments.

. Studying of Drawings thoroughly for the Sequence of Equipment Erection.

. Preparation of Ground assembly schemes of structures and erection.

. Commissioning of all mechanical equipments with hot and cold trails runs.

. Preparation of Erection Schemes for Critical erection as per Crane load

Charts.

. Preparation of Erection protocols, checking the alignment schemes as per

the tolerance, liquidating the defects.

. Supervised erection and commissioning of Compressors and Blowers for dust

suppression system of conveyor system.

. Planning and Preparation of schedules for the daily activities as per the

project requirement.

. Supervision of work flow by considering workmen and machine safety.

. Anchoring and planning erection & commissioning activities for

equipments/machinery/structures.

. Monitoring the trail run of installed equipment by considering rating of

the equipment.

. Monitoring adherence to quality systems as per specifications,

maintaining requisite documents to ensure complete in-process quality &

improvement in process capabilities.

. Maintaining Documents related to Material Requirements, Machines used,

Manpower and all other Operations carried in the site.

PROJECT (2) :- VSP 6.3 MTPA EXPANSION PROJECT (Oct'07- May'12)

CLIENT :- VISAHAPATNAM STEEL PLANT

ROLE :- EQUIPMENT ENGINEER AT R.M.H.S & T.P.P

DESIGNATION :- SENIOR ENGINEER - MECHANICAL

PROJECT COST :- 600 MILLON USD

At M/s M.N.DASTUR & COMPANY (P) Ltd, Vizag

Projects Executed:

: At RAW MATERIAL HANDLING PLANT

: VISAKHAPATNAM STEEL PLANT

. Supervised erection and commissioning of 1 Wheel on Boom Reclaimer, 1

Twin Boom Stacker and 1 Blender Reclaimer completely and cold

commissioned

. Erection and commissioning of equipments like Belt conveyors, Shuttle

conveyors, Reversible conveyors, Apron Feeder, weighing feeders, Vibro

feeder, Retractable belt feeders which are feeding to Blast Furnace,

Sinter Plant, Thermal Power Plant and SMS.

. Interface checking of drawings with respect to technical

specification and B.O.M for Conveying, Screening and Crushing

systems.

. Providing Technical assistance for raw material handling project

. Providing technical assistance by Reviewing and Studying Shop Drawings

of equipment to be installed and to assure the equipment meets or exceeds

the specifications

. Erection and commissioning of mechanical equipments (Cone

crusher, Hammer mill, Double roll crusher,, Gear Boxes, Motor,

fluid coupling, Tyre coupling, pin bush coupling, Tripper conveyor,

Vibrating screen).

. Erection and comissioning of modification jobs in existing areas at

Material Mixing and Distribution Plant.

. Preparing monthly micro-plan, weekly planning & daily progress reports

(DPR) of the maintenance done equipments including utility lines in

Project.

. Erection and comissioning of E.O.T cranes and monorails with both

electric and manual hoists.

. Preparation of erection schedules for the daily activities as per the

project requirement.

. Monitoring the trail run of installed equipment by considering rating of

the equipment.

. Installing and commissioning as well as conducting tests & inspections to

ensure operational effectiveness of utilities and equipments.

. Shut down planning and executing the modification jobs in existing

areas to fulfil the required target (basically re-locating duct line

of Dust Suppression System to stop pollution, connecting new circuit

to existing circuit of conveyor system)

Projects Executed:

: At THERMAL POWER PLANT

:VISAKHAPATNAM STEEL PLANT

. Installation of Air and Gas circuit lines used by Forced draught and

induced draught fans.

. Erection of Coal and ash circuit lines.

. Erection of Feed water and Steam Circuit supplied from steam generator to

turbines.

. Erection of Cooling water system required to cool the outgoing steam from

boiler.

. Maintaining Documents related to, Machines used, and all other Operations

carried in the site.

. PRODUCT EXPOSURE

1. Fluid Bed Combustion Chamber (FBC) and Waste Heat Recovery Boiler

(WHRB)

Max steam Generating capacity - 140TPH

. Max Working Pressure - 163 Kg/ cm2

PROJECT (1) :- KOCHIN PORT EXPANSION PROJECT (May'06 - Sep'07)

CLIENT :- KOCHIN PORT TRUST

ROLE :- STRUCTURAL ENGINEER (FABRICATION & ERECTION)

DESIGNATION :- SITE ENGINEER

At M/s Tijo Constructions, Kerala

Projects Executed:

: At Fabrication work shop and Erection of Conveyor gallery and Crane

Girders.

Client

:Kochin Port Trust.

.

. Planning and execution of fabricating pipe-line trestle supports and

crane girders,

. Regular monitoring of job progress and Supervision of site activities.

. Handling Customer complaints by taking corrective & preventive.

. Coordinating with site personals, during installation, erection, testing

& commissioning of the

Equipments.

. Coordinating with Customer, Consultant & internal project on day today

basis for various purposes like drawing approvals, working &

specifications, arranging Inspection, Supply of material to site,

Material receiving and testing as per the relevant Material

specifications etc.

. CO-Ordinate with project team towards successful & timely completion of

Projects.

. Execution of projects with allocated budgets & time.

. Resource planning for the project execution & planning & reviewing

schedule.

. Planning target dates of the job and ensuring them to be completed within

time.

. Micro level planning at site for every activity.

. Documentation of site records.

. Preparation of progress reports and regular check up of progress to

achieve targets.

TRAININGS

. One-day workshop on the subject "Total Quality Management" conducted by

IIE, Vishakhapatnam.

. A two-day refresher course on "Welding Technology" conducted by IIW,

Visakhapatnam.

ACADEMIA

B.Tech. (Mechanical Engineering) from T.J. Institute of Technology, Chennai

Affiliated to

ANNA UNIVERSITY with an AGGREGATE OF 65%

- 2006

INTERMEDIATE from Secondary State board of A.P with an AGGREGATE OF 70.3%

- 2002

S.S.C Board of Secondary Education A.P with an AGGREGATE OF 70.3%

- 2000

I.T. SKILLS

. Microsoft Office (Word, Excel, PowerPoint).

. Internet Applications.

. AutoCAD 2000, SAP (ABAP), PEB Steel Detailing, MS Project.

PERSONAL PROFILE

Date of Birth 3rd May 1985

Linguistic Abilities English, Hindi, Tamil and Telugu.

Passport No. G4987661

Date of Issue 10.09.2007

Date of Expiry 09.09.2017



Contact this candidate