Post Job Free
Sign in

Project Manager Maintenance

Location:
Jackson, MI, 48060
Salary:
60000.00
Posted:
April 18, 2013

Contact this candidate

Resume:

Ellery D. Burleigh

**** ********* ****

Port Huron, MI 48060

810-***-****

**********@*****.***

OBJECTIVE: To find a position I can utilize my skills as a Supervisor,

Maintenance or Production or Machine Builder, Maintenance Tech.

Also have worked as Project Manager on several projects over the years.

I work well with others and perform to the best of my abilities, any and all

tasks given me.

QUALIFICATIONS:

I have 25 years experience as a Machine Builder. I have worked as Maintenance

Tech or Machine Repairman in most of my positions. Also, can run most machine

shop equipment. Can, weld and fabricate details from prints. Build and

assemble parts/machines from prints and/or sketches.

Supervised up to 125 people of all skilled trades. Recently employed as a

Production Supervisor in a small machining shop.

Made sure staff was in place to operate efficiently, and safely

Coordinate with Shipping and Production to make sure shipments were in place

for “Just In Time” shipments.

Give precise details at Shift changes to keep production running smoothly.

Maintenance Supervisor over 3 shifts of skilled trades.

Maintain records of repairs and parts inventory

Keep appropriate parts and personnel in place to ensure production was met

Set up PM system for three plants

EMPLOYMENT HISTORY:

OTR Driver, 02/02/2012 – Present STARR Transport

Transport RV’s across USA and Canada

Maintenance, 9/15/09 - 06/2011, Safe Horizons, Port Huron, MI

Maintain 8 Houses, 3 Buildings yard work as well as plumbing, heating and

electrical, and do IT works as needed

OTR Driver, 7/2008 - 12/2008, Nations Express, Charlotte, NC

Driver, 02/2007 - 06/2008, Freight First LLC, Chesterfield, MI

Expedite freight across USA, and Canada

Maintenance Supervisor / Cont. Improvement, 02/2003 - 12/2006, SMW

Automotive, Port Huron, MI

Work with Engineering and production to optimize and ease production machines

and procedures. Set up PM system for 3 Plants based on min-max. Worked with

customers to reduce internal problems, based on issues to avoid delays of

product.

Machine Builder, 10-2001 - 02-2003, KUKA Flex Systems, Sterling Heights, Mi

Build Automated Welding lines for Auto Industry. Also was build leader of

afternoon shift to coordinate the trades and have personnel and parts were

available to keep on schedule.

Senior Automation Specialist, 03/2000 - 05/2001, Plastic Automation

Solutions, Port Huron, Mi

Build special parts handling systems for the Plastic Industry to unload and

pack parts by Robots to ensure operator safety. Coordinated with Plant and

Engineering to build best and safest way to handle parts

EDUCATION:

Diploma - General

Port Huron High School, MI

1965

Certification - Pnuedraulics

US Air Force



Contact this candidate