Professional Qualifications:
Mr. Klym has over 25 years experience that includes Quality
Assurance/Quality Control, Construction Quality Control Management, Records
Management, Quality Documentation Verification, Commercial Grade
Dedication, Testing verification including Civil, Mechanical, Electrical,
Commissioning, along with NQA-1 Receipt Inspection. Projects included
compliance with Nuclear Regulatory Commission (NRC), Environmental
Protection Agency (EPA), Department of Defense (DOD), Department of Energy
(DOE), Federal Bureau of Prisons (FBOP) regulations.
Experience:
Quality Control Receipt Inspector Level II: Bechtel National Inc. (BNI)
(May, 2011 to Nov. 2012.) Certified to Nuclear Quality Assurance-1 (NQA-1);
10CFR50 Appendix-B; ANSI-N45.2.6. River Protection Project/ Waste Treatment
Plant, Richland, Washington.
Quality Control Receipt Inspector Level II: NPS Engineering & Technical
Services ( 1989-1992) Certified to Nuclear Quality Assurance-1 (NQA-
1);10CFR-50 Appendix-B; ANSI-N45.2.6
Calvert Cliffs Nuclear Power Plant, Lusby, MD
Quality Control Receipt Inspector Level II: Brown & Root Inc. ( 1987-1989)
Certified to 10CFR-50 Appendix-B; ANSI-N45.2.6. Comanche Peak Steam
Electrical Station (Nuclear), Glen Rose, TX.
Quality Control Receipt Inspector Level II: United Engineers &
Constructors, Inc (1985-1986) Certified to 10CFR-50 Appendix-B; ANSI-
N45.2.6.
Seabrook Station Nuclear Power Plant, Seabrook, NH
Responsibilities Included:
. Perform receipt inspection of permanent plant material in accordance
with applicable Purchase Order (PO), Material Acceptance Plan,
Drawings, Codes and Standards. This includes as a minimum verifying
configuration, identification, dimensions, freedom from shipping
damage, cleanliness, and verifying quality documentation packages.
. Reporting results from inspections and tests performed in accordance
with applicable Material Acceptance Plan requirements.
. Reporting and documenting nonconforming material, assuring discrepant
material is appropriately identified, segregated and controlled.
. Reporting and documenting sampling results.
. Review of Quality Verification Documentation packages.
. Performing commercial grade dedication testing and inspection.
Quality Control Manager: DTC Engineers & Constructors LLC ( April 2010 to
Jan., 2011) 2321 Whitney Avenue, Suite 201, Hamden, CT 06518, National
Guards Training Center, Arkadelphia, AR ($21,000,000)
Quality Control Manager: Carothers Construction Inc. ( Oct.2009 to Jan.
2010 ) PO Box 189 Taylor, MS, National Guards Training Center, Fort
Benning, GA. ($19,000,000)
Quality Control Manager: Hensel Phelps Construction Company (May 1999 to
July 2009.) 4437 Brookfield Drive, Suit #207, Chantilly, Virginia. See
Projects below.
Responsibilities Included:
. Quality Control Department's overall direction.
. Directly involved in the receipt, installation, start-up, testing and
balancing along with commissioning of HVAC mechanical systems.
. Establishing, maintaining and updating the database relative to the
Three-Phase Inspection Process, Daily Reports, Discrepancy Reports,
Submittal Register Management, and monthly reports.
. Review all potential Discrepancy Reports, determine disposition, track
and verify that the issues have been fully corrected prior to closure.
. Direct the removal and replacement of non-conforming work and to stop
work that is not in compliance with the contract.
. Facilitating Preparatory Meetings, participate in Initial Inspections,
Follow-Up and Final Inspections.
. Ensure delivery of material and construction of work does not commence
until the Designer of Record has approved all associated submittals.
. Participate in the selection process for outside testing contractors
and verify adherence to testing standards, frequency, and
documentation.
. Perform material inspection to verify that the products are in
accordance with specifications, storage requirements, visual weld
inspections in accordance with AWS D1.1 and AWS D9.1, staging, and
material handling methods are implemented without compromising project
quality. Submit Request for Information (RFI) as required and review
answered RFI's to assure changes are implemented in the field.
. Actively participate in the Work Completion Tagging Process, In-House
Punch-List Process, and the Pre-Final Work List process to document
deficient items in the field.
Coordinate and schedule off site equipment Source Inspections.
. Actively participate in the Work Completion Tagging Process, In-House
Punch-List Process, and the Pre-Final Work List process to document
deficient items in the field.
Projects
River Protection Project/ Waste Treatment
Plant 12,000,000,000
Richland, WA
National Maritime Intelligence
Center 63,000,000
Suitland, MD
Social Security Administration Building
Renovation 100,000,000
Baltimore, MD
Washington Metro Area Transit
Authority 70,000,000
Parking Garages and Station, New Carrollton, MD
Williamsburg Medium Security
Prison 105,000,000
Williamsburg, SC
National Grounds Intelligence
Center 60,000,000
Charlottesville, VA
Certifications:
. Army Corp of Engineers: Construction Quality Management for Contractors
. AAS Degree: Mechanical Technology
Competent Person Training:
Excavation, Confined Space, Scaffolding, First Aid, Fall Protection, OSHA-
10
References:
Donald Whelan: Principal Subcontract Administrator Manager: Constellation
Energy (CEG)
Cell# 443-***-****
William Beem : Level III Receipt Inspector: Bechtel National Inc. Cell#
Gary Street: Procurement Supplier Quality Supervisor: Bechtel National Inc.
Cell# 509-***-****