JIM ROBINSON
**** ********* ***** ****. ***** Park, TX 78613
***/***-**** **********@******.**.***
PRODUCTION MANAGER
P & L Responsibility / Manufacturing and Marketing Leadership / Start-ups
Turnaround Management / Strategic Planning
Management Experience: President of two small companies, General Manager
for a medium-sized company and a "Director" for a division of two large
companies. Highly organized achiever with a proven ability to improve the
bottom line in both large and small companies.
Entrepreneurial Experience / Start-ups: Started my own electronics assembly
company in San Diego, a CA corporation which managed a "maquiladora" in
Tecate, Mexico to utilize inexpensive labor for assembly work.
Turnaround Experience: Joined a small company in Silicon Valley that was
losing over $1M annually. Lead the company to break even during my first
year and made a profit of $1M the second year. During my five years as the
President, the company had annual 25-35% growth in both revenue and
profits. It was then acquired by a very large British company for a large
profit to the owners.
WORK HISTORY:
JCR CONSULTING SERVICES, Inc. Austin, TX 2002
to Present
President
. Implemented LEAN MANUFACTURING at 2 Austin companies.
. Wrote a business plan for a start-up to raise "angel" funding.
. Implemented TQM (Total Quality Management) at 2 companies.
. Managed the "turnaround" of two companies who were going under.
CDS Leopold/Systems Austin, TX 1999 to
2001
General Manager
. Managed increasing shipments from $25M to $75M annually within 18
months.
. Managed the growth of plant capacity from 40Hours/week to 24/7 in 3
months.
. Increased the bookings from the #1 customer (Applied Materials) by
$60M/Yr.
. Reduced employee turnover by 50% in the first year.
JIM ROBINSON
512/918-1622 **********@******.**.***
Page 2 of 2
SILICON VALLEY GROUP (ASML-NV) San Jose, CA 1997 to
1998
Director of Advanced Operations
. Managed a group of engineers/technicians developing 300 mm systems.
. Established procedures to track new wafer handling equipment for 300
mm.
. Managed a job shop operation to keep small orders out of high volume
facility.
MATHESON SEMI-GAS SYSTEMS San Jose, CA 1996
to 1997
Director of Manufacturing
. Implemented Total Quality Management (TQM) system.
. Implemented Supply Chain Management (SCM) procedures.
. Implemented Just-In-Time (JIT) procedures.
. Reduced order turnaround time by 32%.
FLEXCON, Inc. San Diego, CA / Mexico
1988 to 1995
CEO/President
. Incorporated a CA corporation to do electronic assemblies and
prototypes.
. Located an empty building in Tecate, Mexico to use as a maquiladora.
. Grew the business from one employee (me) to 45 employees.
. Sold the corporation profitably after 7 years of successful operation.
EDUCATION:
BS Marketing---Drake University Des Moines, IA
MBA Courses---San Jose State University San Jose, CA