Marc L. Dunbar

**** ******** **.

Rocklin, CA ***65

Home # 916-***-****

Cellular: 916-***-****

E-mail: abs0kn@r.postjobfree.com

Dear Sir/Madam:

I am presently seeking a position in construction or development field as a

Superintendent or Construction Operation Manager. I have been involved in

the construction trades and management since 1979. I have worked in the

trades as a laborer, framing foreman, framing contractor, general

contractor, contractor, material acquisition, superintendent, general

superintendent and project manager.

I have supervised the construction of residential, multi-family,

commercial, industrial modernization projects. And have been supervising

public works projects since 1993.

With my extensive background in the construction industry, I would be a

great asset to your company.

Enclosed is my resume for your review. I am looking forward to meeting

with you to discuss employment with your company.

If you need further information or references, please contract me at (916)

435-2266 or by cellular 916-***-****.

Thank you for your time and consideration.

Sincerely,

Marc L Dunbar

Marc L. Dunbar

5353 Humboldt Dr.

Rocklin, CA 95765

E-mail:

l2rracin@rocketmail.c

om

916-***-**** hm,

916-***-**** cell

Marc L. Dunbar

Objective Seeking a position in the construction or development

field as a General Superintendent or Construction

Operations Manager

Experience

June 2012 / Present. Landmark Construction Inc 5048

King Road Loomis Ca.

916-***-****

Mill Valley School District Park Elementary, Strawberry

Point Elementary, Mill Valley Middle School and Tam

Valley. 4.4 million Summer mod consisting of site

Underground Utilities, Site Concrete & Paving New Mech,

Doors Hardware, New Restroom Addition, New Electrical,

Data and fire alarm, Interior renovations including wood

wainscot & trim. Complete interior and Exterior

Painting.

May 98-Oct 2001 / May 2003 - Present, Bobo Construction

Inc. 916-***-**** Elk Grove Ca. 95634

Current Project Superintendent

Current Project installing Doors and Hardware Nights at

King Hall w/ Bobo Const

Projects working as Carpenter and door & hardware

installer.

UCD King Hall

1.4 Million Telemed UCD Med Center installing doors &

hardware at the new facility.

Bulljan Middle School installing doors & hardware at new

buildings .

Superintendent

12.7 M Winters Police & Fire Facility. The Police

Building is a Structural Steel, Metal stud framing, The

Fire Dept is two story Structural steel and structural

wood framing.

8.8 Million. Columbia Child Development Center. The

scope of work for this project was to build 5 wood frame

buildings, one structural steel and wood frame covered

area called out to be the Learning Center, and one wood

frame open beam Gazebo, In a Forest around a Natural

Courtyard. The five buildings are the Infant Building w/

2,123 sq, the Toddler Building w/ 2,381 sq ft. The

Preschool building w/ 2,883 sq ft, The Adult Class room

w/ 2,395 sq ft. The Administration Building w/ 3,321 sq

ft. The project also included the site development, Tree

protection plan, all utilities, Civil, Structural,

Ecological Landscaping, Mechanical, Plumbing and

Electrical. The project was designed to qualify for LEED

Silver Rating.

$2.25M - Dublin Unified School District, Fredrickson

Kindergarten Project: New Playground, Courtyard, Site

Utilities and Landscaping: Dublin, CA.

$8.6M - Lodi Unified School District, Lawrence

Elementary School: Two New Classroom Buildings and New

parking Lot & Playground. New Fire Alarm, Communication

and Utility Systems. Lodi Ca.

$1.1M - Elk Grove Unified School District, 2007 Portable

Relocation Elk Grove: Relocation of foundations and

portables at multiple schools with site improvements and

ADA Compliance work. Elk Grove, CA.

$240K - Elk Grove Unified School District, Elk Grove

Portable Relocation: Installation of Foundations,

Portable Classrooms and Site Upgrades at four schools.

Elk Grove, CA.

$1.1M - Elk Grove Water District, Elk Grove Water

District Operations & Maintenance Bldg: New Building &

Site Work. Elk Grove, CA.

$9.8M - Elk Grove Unified School District, Prairie

Elementary School Classroom Replacement: Four New

Classroom Buildings & Two New Portable Classroom

Buildings. Relocation of Existing Portable Classroom

Buildings. New playground, Parking Lot, Recreation

field, Walking Path, Fire Alarm and Communications

Systems. Elk Grove, Ca.

$2.4M - Grant Unified School District, Rio Tierra School

Phase #2 Modernization: Abatement and Complete

Renovation. Replacement of slab floors, complete

classroom and office Buildings inside & out.

Refurbished gymnasium floor, equipment and installed new

bleachers. New Fire Alarm, electrical, low voltage, and

communication systems. Sacramento, CA.

$1.8M - San Juan Unified School District, Sky crest

Elementary School Modernization: Renovation of all

Classroom, Library, Office and Multipurpose Buildings.

Fair Oaks, CA.

$3M Lodi Unified School District, Woodbridge Elem School

Conversion: Complete Renovation of Existing Classroom &

Office Buildings, Library & Multipurpose Buildings.

Installation of Portable Classroom Buildings and Site

Work. Woodbridge, CA.

Project Manager / Bobo Construction Inc.

New Addition Consisting of five new wood frame Buildings

approx. 58,000 sq. ft. New parking lot, play ground &

underground utilities at Prairie Elementary School for

Elk Grove School District $7,800000

2001- May 2003 Aberdeen Burris Contractors

530-***-**** Lincoln, CA

General Superintendent / Project Manager

Child Development Center at UC Davis 1.8 M

Superintendent / Project Manager Mondovi Center of the

Arts stage & rigging and the administrative Building UC

Davis, Consisting of Structural Steel with steel studs

framing 14.5 M

Superintendent of Construction for Academic Surge

Science building at U.C. Davis

Superintendent / Project Manager for $13,000,000.

remodel at Rio Cosumnes Correctional Center

General Superintendent / Project Manager for

construction of International Arrival Terminal at

Sacramento International Airport $5,800.000.00

General Superintendent / Project Manager: CHP Remodel,

Mack Rd., Blue Anchor fire life safety, 10th & N St.,

Art Administration, U.C. Davis, U.C. Davis 1.6M

1996-1998 BRCO Constructors Inc. Loomis, CA

Superintendent

Superintendent for Satellite Wagering Facility for the

State of CA, Vacaville.

Superintendent for Renovation of the Gridley City Hall,

Gridley, CA.

1993-1996 Carothers Construction Inc. Roseville, CA

Superintendent

Superintendent on Public Works, Commercial Construction,

Industrial, Modernization program for San Juan, Grant

Union, Sac. City, & Elk Grove School District,

Government Buildings at McClellan and Beale A.F.B.

1981-Present (License still active) M.L. Dunbar

Construction. Rocklin, CA

Owner/Operator

Knowledgeable and skilled in all phases of construction

including residential and commercial bidding, contracts,

job cost analysis, scheduling, supervision and turn-key

operations. Framing contracts included 350 homes for

Pacific Scenes, 230 homes for Latham Lumber, 80 homes

for Alante Development and 45 homes for JMC Development

Framing Contracts: Point Pacific @ Laguna Creek by

Pacific Scenes, Elk Grove, CA. Mirada @ Stanford Ranch

by Pacific Scenes, Rocklin, CA., Orchard Lane by Pacific

Scenes, Orangevale, CA., Summerhill by Latham Lumber,

Citrus Heights, CA., Heather Glen by JMC Development,

North Highlands, CA. Auburn Ravine by Allante, Citrus

Heights, CA.

Fire Repairs/Insurance Jobs: DL Glaze, Roseville, CA,

Greenspan Company, San Francisco, CA. Jackson &

Associates, Roseville, CA

Turn-Key Contracts on Custom Homes: 1990 - Maria Cano,

Sacramento, CA.

1990 - Albert Woo, Fair Oaks, CA. 1991 - Art Stapleton,

Pine Grove, CA. 1992 - EJD Development, 10 Lot

Subdivision Rocklin, CA. 1994 - Jim Smith, Lake Almanor,

CA., 1995 - Mary Teeters Dutchflat CA., 1993 - Hilliary

Rolls Citrus Heights, CA., 1992 -Brenda Penn Rocklin,

CA., 1998 - Jim Harlen Loomis CA, and our personal

residence at 3460 Sherwood Ct. Loomis, CA

1994-1995 Ellis Roofing. Sacramento, CA

Foreman

Knowledge of all phases of roofing, residential and

commercial

Superintendent & Framing Contractor

Developed 10 - Lot subdivision,

1990-1994 EJD Development (Emerson/Jackson/Dunbar)

Rocklin, CA

Framing Contractor

1985 - 1987 Framing 860 houses and 2, 360 unit

apartments complexes for Lathem Lumber trough out the

Sacramento Area

1987 - 1991 Framing for Pacific Scenes 1375 single

family homes in Sacramento area

1979-1985 William Harrison Construction Roseville, CA

Framing Foreman

3,500 homes throughout the Sacramento area.

Education 1978 Bella Vista High School Fair Oaks, CA

California Contractors License # 462-434.

Computer literate with good understanding of Microsoft

Word, Microsoft Project, Suretract, Internet and other

misc., programs

1979 to 1980 Sierra College, Rocklin, CA.

Interests/Hobbie Auto Racing, Private Pilot, Scuba Diving, Water Skiing,

s Stock Market Day-Trading, Traveling, and Spending Time

with my Family.



Contact this candidate