Ali Moosavi
#**** **** **** ****,*********,Vancouver-v3b 7z6
TEL:604-***-****
Career Objective : I want to move into site superintendent position in construction
Employment History:
>8 years experience in site supervising in the Building Construction,Road project,Underground Execution project,Stone mine Extraction
>Site Supervising in the Building Construction (1 year,3 month)
>Site Supervising in the Heavy Road Project (1 year,6 month)
>Project Supervising in the Subway Station and 200 meter of main Tunnel (2 years, 2 month)
>Skilled in Soil Consolidation System such as Fore poling DTH,Nailing on top of the Tunnel
>Site Superintendent in renovation in the Residential & Commercial tower -Electric work shop for Oil Refinery ( 2 years)
>Site supervising in Stone Extraction and helding the material(1 year, 4 month)
>Managed and scheduling to(Technician,Foreman,Labours)
>Supervising and solving problem in : Pouring Concrete,Reinforcing,Forming,Tunnel (Excavation and Install the Frame)
>Prepared daily,weekly report for Head office
>Ensure Safety measurement at the job site
>Handling Road and Tunnel equipment on site
Soltani Construction Company Ltd
Site Supervisor:(Contract) 2011-2012
1652 Marlowe Place-West Vancouver
1021 Kennedy Ave-North Vancouver
Responsibilities:
>Responsible for planing construction method and procedures and coordinating the supply
of labours and materials.
>supervising site constructions and directing subcontractors to make sure standards of building performance,cost schedules and safety were maintained
>Overseeing contractors jobs and ensuring that all required materials and resources were
available
>Scheduling and line up the contractors
>Arrangement for all mandatory inspections(City inspection)
>Report preparation for material ordering,labours and sub traders time sheet
>Selecting potential contractors
>Apply safety regulation at the job site
Kayson Company
Site Supervisor (contract) 2009-2011
Al-khalidyyah to Al-khalidyeh Road Project-OMAN(Khasab)
Responsibilities:
>Supervised all construction job such as: Forming,reinforcing,Concrete Pouring,Curing,Cut of wall,Culvert,Gabions and Riprap
>Daily checking of baching plant to make sure all ingredient,Water,Cement are based on standard
>Daily /Weekly scheduling the job foreman, Technician and labours
>Scheduling contractors for following items(Reinforcement,Pouring Concrete,Cut of wall and Gabions
>Daily and Weekly report to head office about job progress
>Regularly job meeting with subcontractors
>Ensure the safety measurement
>Managed over 100 person at site
>Coordinated with Surveyor and Earth work Supervisor to benchmark and helding material
Arshad Sazeh Toos Company (IRAN-Tehran)
Underground Station for Subway and 200 meter main Tunnel (gholhak U1)
Project Manager (contract) 2007-2009
>Arranged for heavy underground excavation and hauling/damping all the material
>Coordinated with subcontractors:(Forming,Reinforcing,pouring concrete,Isolation group,
Tunnel(Drilling & Maintenance)
>Communicated with Geology manager and Surveyor to insure all job were accordingly performanced
>Checked and applied all safety measurement on site
>Checked all methods on top of tunnel such as: DTH,Nailing system(Tunnel Sustainable)
>Prepared daily report about project progressive and provide grafe about benefitial
>Implemented ventilation for personal and site operation
Asa Gostareh Company
Residential and Commercial Tower Building-Electric Work Shop in (Naft va pars Refinery)
Site Superintendent (Contract) 2005-2007
>Supervised the renovation of two Residential &Commercial Tower Building
>Performed field supervision,Time table,Line up the subcontractors and City regulation and code checking
>Prepared daily/weekly reports,Meeting data,obtaining drowing
>Supervised an office Building and electric work shop for refinery
>managed over 30 person
Phosphate Esfordy Mining Company (IRAN-Yazd-Bafgh)
(Volunteer Work) 2004-2005
>Specified Spacing & Burden
>Bored with Blast hole Drill
>Loaded the hole with Explosive material (Dynamite & Anfo)
>Blasted with Cortex
>Familiar with Mining equipment
Sadaf Stone Company (IRAN-Shiraz-Neiriz)
Production Engineer (Contract) 2003-2004
>Performed extraction of stone was performed in the method in the method of mechanized and Wire Cutter
>Preparing all daily reports of project progress,Heavy stone transportation,Site safety measurement and site procurement
>Applied time table for stone transportation based on stone extraction
>Pro activity identify potential problems in the field,Develop alternatives,Arrive at optimum solution
Education
>Bachelors Degree in Mining Engineering-Extraction(IRAN_YAZD University)
>IMQ International Certificate