Ali Moosavi

#**** **** **** ****,*********,Vancouver-v3b 7z6

TEL:604-***-****

Career Objective : I want to move into site superintendent position in construction

Employment History:

>8 years experience in site supervising in the Building Construction,Road project,Underground Execution project,Stone mine Extraction

>Site Supervising in the Building Construction (1 year,3 month)

>Site Supervising in the Heavy Road Project (1 year,6 month)

>Project Supervising in the Subway Station and 200 meter of main Tunnel (2 years, 2 month)

>Skilled in Soil Consolidation System such as Fore poling DTH,Nailing on top of the Tunnel

>Site Superintendent in renovation in the Residential & Commercial tower -Electric work shop for Oil Refinery ( 2 years)

>Site supervising in Stone Extraction and helding the material(1 year, 4 month)

>Managed and scheduling to(Technician,Foreman,Labours)

>Supervising and solving problem in : Pouring Concrete,Reinforcing,Forming,Tunnel (Excavation and Install the Frame)

>Prepared daily,weekly report for Head office

>Ensure Safety measurement at the job site

>Handling Road and Tunnel equipment on site

Soltani Construction Company Ltd

Site Supervisor:(Contract) 2011-2012

1652 Marlowe Place-West Vancouver

1021 Kennedy Ave-North Vancouver

Responsibilities:

>Responsible for planing construction method and procedures and coordinating the supply

of labours and materials.

>supervising site constructions and directing subcontractors to make sure standards of building performance,cost schedules and safety were maintained

>Overseeing contractors jobs and ensuring that all required materials and resources were

available

>Scheduling and line up the contractors

>Arrangement for all mandatory inspections(City inspection)

>Report preparation for material ordering,labours and sub traders time sheet

>Selecting potential contractors

>Apply safety regulation at the job site

Kayson Company

Site Supervisor (contract) 2009-2011

Al-khalidyyah to Al-khalidyeh Road Project-OMAN(Khasab)

Responsibilities:

>Supervised all construction job such as: Forming,reinforcing,Concrete Pouring,Curing,Cut of wall,Culvert,Gabions and Riprap

>Daily checking of baching plant to make sure all ingredient,Water,Cement are based on standard

>Daily /Weekly scheduling the job foreman, Technician and labours

>Scheduling contractors for following items(Reinforcement,Pouring Concrete,Cut of wall and Gabions

>Daily and Weekly report to head office about job progress

>Regularly job meeting with subcontractors

>Ensure the safety measurement

>Managed over 100 person at site

>Coordinated with Surveyor and Earth work Supervisor to benchmark and helding material

Arshad Sazeh Toos Company (IRAN-Tehran)

Underground Station for Subway and 200 meter main Tunnel (gholhak U1)

Project Manager (contract) 2007-2009

>Arranged for heavy underground excavation and hauling/damping all the material

>Coordinated with subcontractors:(Forming,Reinforcing,pouring concrete,Isolation group,

Tunnel(Drilling & Maintenance)

>Communicated with Geology manager and Surveyor to insure all job were accordingly performanced

>Checked and applied all safety measurement on site

>Checked all methods on top of tunnel such as: DTH,Nailing system(Tunnel Sustainable)

>Prepared daily report about project progressive and provide grafe about benefitial

>Implemented ventilation for personal and site operation

Asa Gostareh Company

Residential and Commercial Tower Building-Electric Work Shop in (Naft va pars Refinery)

Site Superintendent (Contract) 2005-2007

>Supervised the renovation of two Residential &Commercial Tower Building

>Performed field supervision,Time table,Line up the subcontractors and City regulation and code checking

>Prepared daily/weekly reports,Meeting data,obtaining drowing

>Supervised an office Building and electric work shop for refinery

>managed over 30 person

Phosphate Esfordy Mining Company (IRAN-Yazd-Bafgh)

(Volunteer Work) 2004-2005

>Specified Spacing & Burden

>Bored with Blast hole Drill

>Loaded the hole with Explosive material (Dynamite & Anfo)

>Blasted with Cortex

>Familiar with Mining equipment

Sadaf Stone Company (IRAN-Shiraz-Neiriz)

Production Engineer (Contract) 2003-2004

>Performed extraction of stone was performed in the method in the method of mechanized and Wire Cutter

>Preparing all daily reports of project progress,Heavy stone transportation,Site safety measurement and site procurement

>Applied time table for stone transportation based on stone extraction

>Pro activity identify potential problems in the field,Develop alternatives,Arrive at optimum solution

Education

>Bachelors Degree in Mining Engineering-Extraction(IRAN_YAZD University)

>IMQ International Certificate