Post Job Free
Sign in

Project Manager

Location:
San Francisco, CA, 94404
Salary:
110,000.00
Posted:
April 15, 2013

Contact this candidate

Resume:

Steve Hegede

Foster City, CA

650-***-****

***********@*****.***

Education:

Bachelor of Science in Mathematics, California State University of Long Beach (CSULB) 1998.

•

* ***** ** ******** Science courses at CSULB.

•

Certificate – Primavera Scheduling Software (P6).

•

Certificate – Colorado School of Mines, Colorado, “Tunnel Management” short course.

•

Experience:

CPM Scheduler/Project Controls – URS, San Francisco, CA (June 2007 – Present)

Caltrans/Kiewit Devil’s Slide Tunnel Project (SEM/NATM Excavation Method), Pacifica, California

CPM Scheduler for Caltrans on the $430 Million Devil’s Slide Tunnel Project. Kiewit was

•

the Contractor.

Assigned to DST Project from the Excavation Phase to Project Completion.

•

Reviewed and responded to Kiewit’s Monthly CPM Schedule Updates.

•

Reviewed and responded to Kiewit’s Monthly Time Impact Analysis.

•

Created “What-if” schedule reports and graphs for Caltrans.

•

Updated Construction Manager daily on schedule and potential schedule issues.

•

During the Tunnel Excavation Phase, updated weekly Tunnel Excavation Status report for

•

Caltrans showing current excavation progress, delays, project issues, forecasts, and current

contractor productivity rate (S-curve graphs).

During the Tunnel Excavation Phase, updated daily Tunnel Excavation data and monitored

•

Tunnel Excavation based on 15-minute increment timesheets from field inspectors.

Worked with Owner on two (2) multi-million dollar contractor claims. The first claim was

•

related to “Tunnel Ventilation”, the second claim was a “Differing Site Condition/Change in

Character” claim during the Excavation phase of the project.

Worked with Caltrans in preparation for a DRB (Dispute Review Board) hearing related to

•

Contractor’s “Change in Character” claim.

Worked with a Senior Claims Analyst (URS) on a Negotiated Settlement with the Contractor.

•

Attended Quarterly DRB (Dispute Review Board) Meetings with the Owner to discuss

•

Schedule related issues.

Assisted Caltrans replying to various Contractor time impact letters.

•

Reviewed Contractor Cost Packages associated with Change Orders.

•

Visited project site daily to document project progress and impacts from Change Orders

•

(using photos/videos).

Worked on multi-media presentations for Caltrans Upper Management.

•

Attended weekly Project Progress meetings and verified contractor’s meeting minutes.

•

Updated “Lessons Learned” document for Caltrans.

•

Received 6 years of Caltrans/URS Field and Tunnel Safety training.

•

Reviewed other Caltrans schedule (101/Broadway Interchange Project) and provided

•

recommendations.

Project Controls Analyst – Strategic Management Solutions, Inc. (February 2005 – June 2007).

Los Alamos National Laboratory, Los Alamos, New Mexico (April 2005 – June 2007)

Project Controls Analyst for LANL’s “Facilities and Infrastructure Recapitalization Project”

•

(FIRP). Small to Mid-Sized Construction Projects.

Project Controls Analyst for LANL’s “Roof Assessment Management Project” (RAMP).

•

Analyzed cost data on a daily basis using LANL’s FMIS.

•

Created weekly and monthly reports using PRISM Cost Analysis software for various LANL

•

Project Managers.

Assisted the Group Team Leader with PRISM administration.

•

Updated schedules, using P5, tracking dozens of construction projects.

•

Analyzed risk associated with FIRP projects using Crystal Ball software.

•

Created and maintained schedules for several non-FIRP projects (IGPP, and Security

•

Division).

Updated monthly FIRP-related financial and project reports for the Department of Energy

•

(DOE).

Document Control Manager – A.P.S. (DBE Company) (October 1998 – January 2005)

Federal Bureau of Prisons (FBOP) Tucson, Arizona (November 2002 – January 2005).

• Document Control Manager on a $115 Million FBOP contract to build a Maximum Security

Prison on Wilmot Road.

• Modified Primavera’s Expedition to meet project requirements.

• Modified FBOP Expedition forms using Infomaker.

• Used Primavera’s Expedition to track project documents.

• Supervised and trained four (4) Administrative Assistants with Expedition.

• Passed an intensive Federal Bureau of Prisons (FBOP) audit of all Project Documents.

Bay Area Rapid Transit (BART) – San Francisco International Airport Extension Project (October 1998-October

2002).

• Document Control Manager for Washington Group (formerly MK Centennial) on a $2.2

Billion contract.

• Received Expedition training from a Primavera “Value Added Reseller” (VAR).

• Used Primavera’s Expedition to track project documents.

• Updated Project Progress reports for various Project Managers.

• Created, and maintained, Washington Group’s BART-SFIA Project intranet website.

• Assisted several Network Administrators with maintenance of the computer network.

• Visited Project Site to document progress.

Webmaster/Network Assistant - The Zahn Group ( WBE) (May – October 1998)

San Francisco Public Utilities Commission (May-October 1998).

References: Upon Request

Skills:

Computer Proficiencies:

Primavera v6.7

Primavera P3

Primavera’s SureTrak/Contractor

Microsoft Projects

Primavera’s Expedition/Document Control

PRISM Project Manager/Cost Analysis Software

Infomaker

Microsoft Office Suite

Adobe Photoshop

Microsoft Movie Maker (for Construction related video editing)

Apple and Android Apps

HTML

Intermediate Java Coding

Netbeans/mySQL

Reason 6.5



Contact this candidate