Post Job Free
Sign in

Project Manager

Location:
San Francisco, CA, 94404
Salary:
110,000.00
Posted:
April 15, 2013

Contact this candidate

Resume:

Steve Hegede

Foster City, CA

650-***-****

***********@*****.***

Education:

Bachelor of Science in Mathematics, California State University of Long Beach (CSULB) 1998.

* ***** ** ******** Science courses at CSULB.

Certificate – Primavera Scheduling Software (P6).

Certificate – Colorado School of Mines, Colorado, “Tunnel Management” short course.

Experience:

CPM Scheduler/Project Controls – URS, San Francisco, CA (June 2007 – Present)

Caltrans/Kiewit Devil’s Slide Tunnel Project (SEM/NATM Excavation Method), Pacifica, California

CPM Scheduler for Caltrans on the $430 Million Devil’s Slide Tunnel Project. Kiewit was

the Contractor.

Assigned to DST Project from the Excavation Phase to Project Completion.

Reviewed and responded to Kiewit’s Monthly CPM Schedule Updates.

Reviewed and responded to Kiewit’s Monthly Time Impact Analysis.

Created “What-if” schedule reports and graphs for Caltrans.

Updated Construction Manager daily on schedule and potential schedule issues.

During the Tunnel Excavation Phase, updated weekly Tunnel Excavation Status report for

Caltrans showing current excavation progress, delays, project issues, forecasts, and current

contractor productivity rate (S-curve graphs).

During the Tunnel Excavation Phase, updated daily Tunnel Excavation data and monitored

Tunnel Excavation based on 15-minute increment timesheets from field inspectors.

Worked with Owner on two (2) multi-million dollar contractor claims. The first claim was

related to “Tunnel Ventilation”, the second claim was a “Differing Site Condition/Change in

Character” claim during the Excavation phase of the project.

Worked with Caltrans in preparation for a DRB (Dispute Review Board) hearing related to

Contractor’s “Change in Character” claim.

Worked with a Senior Claims Analyst (URS) on a Negotiated Settlement with the Contractor.

Attended Quarterly DRB (Dispute Review Board) Meetings with the Owner to discuss

Schedule related issues.

Assisted Caltrans replying to various Contractor time impact letters.

Reviewed Contractor Cost Packages associated with Change Orders.

Visited project site daily to document project progress and impacts from Change Orders

(using photos/videos).

Worked on multi-media presentations for Caltrans Upper Management.

Attended weekly Project Progress meetings and verified contractor’s meeting minutes.

Updated “Lessons Learned” document for Caltrans.

Received 6 years of Caltrans/URS Field and Tunnel Safety training.

Reviewed other Caltrans schedule (101/Broadway Interchange Project) and provided

recommendations.

Project Controls Analyst – Strategic Management Solutions, Inc. (February 2005 – June 2007).

Los Alamos National Laboratory, Los Alamos, New Mexico (April 2005 – June 2007)

Project Controls Analyst for LANL’s “Facilities and Infrastructure Recapitalization Project”

(FIRP). Small to Mid-Sized Construction Projects.

Project Controls Analyst for LANL’s “Roof Assessment Management Project” (RAMP).

Analyzed cost data on a daily basis using LANL’s FMIS.

Created weekly and monthly reports using PRISM Cost Analysis software for various LANL

Project Managers.

Assisted the Group Team Leader with PRISM administration.

Updated schedules, using P5, tracking dozens of construction projects.

Analyzed risk associated with FIRP projects using Crystal Ball software.

Created and maintained schedules for several non-FIRP projects (IGPP, and Security

Division).

Updated monthly FIRP-related financial and project reports for the Department of Energy

(DOE).

Document Control Manager – A.P.S. (DBE Company) (October 1998 – January 2005)

Federal Bureau of Prisons (FBOP) Tucson, Arizona (November 2002 – January 2005).

• Document Control Manager on a $115 Million FBOP contract to build a Maximum Security

Prison on Wilmot Road.

• Modified Primavera’s Expedition to meet project requirements.

• Modified FBOP Expedition forms using Infomaker.

• Used Primavera’s Expedition to track project documents.

• Supervised and trained four (4) Administrative Assistants with Expedition.

• Passed an intensive Federal Bureau of Prisons (FBOP) audit of all Project Documents.

Bay Area Rapid Transit (BART) – San Francisco International Airport Extension Project (October 1998-October

2002).

• Document Control Manager for Washington Group (formerly MK Centennial) on a $2.2

Billion contract.

• Received Expedition training from a Primavera “Value Added Reseller” (VAR).

• Used Primavera’s Expedition to track project documents.

• Updated Project Progress reports for various Project Managers.

• Created, and maintained, Washington Group’s BART-SFIA Project intranet website.

• Assisted several Network Administrators with maintenance of the computer network.

• Visited Project Site to document progress.

Webmaster/Network Assistant - The Zahn Group ( WBE) (May – October 1998)

San Francisco Public Utilities Commission (May-October 1998).

References: Upon Request

Skills:

Computer Proficiencies:

Primavera v6.7

Primavera P3

Primavera’s SureTrak/Contractor

Microsoft Projects

Primavera’s Expedition/Document Control

PRISM Project Manager/Cost Analysis Software

Infomaker

Microsoft Office Suite

Adobe Photoshop

Microsoft Movie Maker (for Construction related video editing)

Apple and Android Apps

HTML

Intermediate Java Coding

Netbeans/mySQL

Reason 6.5



Contact this candidate