Mechanical Engineer - Static Equipment
Last updated: Feb. 2013
[pic]
Name: Lester Baptisma Dinoy
Current Location: Seoul City, South Korea
Citizenship: Filipino
Age: 29 yrs. Old
Date of Birth: May 29, 1983
Height: 167 cm
Weight: 68 kgs
Civil Status: Single
Email add: ********@*****.***, ***********@*****.***
Mobile no. in Korea : +82-10-289*-****
SUMMARY: With approximately 7 years and counting of relevant experience in
the field of Oil and Gas, Refineries, and Petrochemical Projects abroad. I
am exploring the possibilities for a Mechanical Engineer handling Static
Equipment position that will allow me to utilize my engineering expertise
along with incorporating my skills and knowledge.
- Capable of working and communicating with a multi-functional asset team
and understands customer focus.
- Demonstrates knowledge & understanding of applicable industry codes and
company standards and specifications related to the design, fabrication,
inspection and testing of static mechanical equipment; monitors and
evaluates mechanical equipment and facilities. -Able to design, and
construct systems containing multiple static equipment and accessories.
-Writes and handles equipment requisitions in accordance with project
requirements.
- Reviews drawings, documents, and inspection & test procedures from the
sellers.
-Play an active role in the integrated EPC work process as a member of the
project team, for engineering, selection, production, fabrication,
expediting, inspection, testing, delivery, shipment, installation and
(pre)commissioning of materials(communication only)
EMPLOYMENT HISTORY:
1. GS ENGINEERING & CONSTRUCTION CORP. (www.gsconst.co.kr)
Location: 19th Floor GS Tower, 679 Yeoksam-Dong, Gangnam-Gu, Seoul, 135-
985, South Korea
Position: Mechanical Engineer (Static)
Company Involvement Period: March, 2011 ~ Present
Department: Mechanical Engineering Team
Main Duties & Responsibilities:
* Preparation of Datasheet
* Checking & Development of Engineering Drawing
* Stress Calculation
* Preparation of Requisitions for Inquiry
* Preparations of T.B.E for Bidder's Quotation
* Technical Clarification with Bidders by Email, Phones & Table Meeting
* Preparation of Requisition for Purchase
* Kick-off Meeting with Vendors
* Vendor Print checking management
* BM Take-off
* Squad check for P&ID, Plot plan, Piping Drawing, Structural Drawing and
foundation drawing etc.
* Inspection support for Shop Inspection and Test
* Preparation of reports including work progress, Status & Risk
* Support work for Mechanical Engineer
* Preparation & Management of Correspondence for Project Execution
* Coordination for Project Execution
* Develop and maintain mechanical engineering strategies, procedures and
standards.
* Review/prepare technical evaluations of equipment and installation
contracts tenders
* Liaise with Project Engineers, EPC Contractors and vendors as appropriate
to:
* Technical support for Project Execution
* Document review for Project Execution
* General review for Project Execution
* Expediting Vendor for Project Execution
* Demonstrated project management skills.
* Check spare parts for 2 years and commissioning
* Prepare BOQ for insulation, fireproofing, etc.
* Check As-Built data sheets and Vendor Prints
* Check Shipping and Packing Details
* Check QC Documents such as:
- Hydrostatic Test Procedure
- Painting Specifications, etc.
PROJECT INVOLVEMENTS:
1.1 ERC Refinery Project
Client: Egyptian Refinery
Location: Mostorod, Egypt.
Project date involved: March 2012 ~ Present
Handled Equipment:
. S&T Heat Exchangers (Lethal Services, LTCS, etc.)
. Columns (LLI)
. Coke Drum (LLI)
. Deaerator
. Coalescers & Silencers
. Automated Valve Type Unheading System Package (for Coke
Drum)
. High Pressure High Temperature Heat Exchanger (DEU Type) -
LLI
1.2 RRE#2 Refinery Project
Owner: TAKREER Abu Dhabi Oil Refining Company
Location: Abu Dhabi
Project date involved: March 2011 ~ July 2012
Handled Equipment:
. S&T Heat Exchangers (Large Diameters, Lethal Services,
LTCS Services)
. Non-TEMA Special Type HE-Lethal Service
. Vaporizer-Special Type HE
. Multi-tube HE
. Package Equipment (Stationary Only)
. Static Mixers
. others
2. MES/MPE MITSUI ENGINEERING & SHIPBUILDING CO. LTD
(www.mes.co.jp/english/)
Position: QC Engineer/Mechanical Engineer (Static)
Tasks: Temporary Transfer Employee or TTE
Location: Nishikasai, Tokyo office, Japan
Company Involvement Period: (Sept. 2008 - Aug. 2009) Approx. 1 yr.
Duties & Responsibilities:
* Correspondence to Vendor and Owner including Technical clarifications &
confirmations
* Check & Review of inspection documents for approval
* Monitor, update & expedite vendor regarding QC documents
* Attend Witness inspection in vendor shops (within Japan)
* Check & Review QC Dossiers, and others
3. DASH ENGINEERING PHILIPPINES INC. (www.dash.com.ph)
A 100% subsidiary of Mitsui Engineering & Shipbuilding Co. Ltd. of Japan or
widely known as MES.
Location: i1 bldg. 8th flr. Asiatown IT-Park Lahug Cebu City, 6000
Philippines
Position: Mechanical Engineer (Static)
Company Involvement Period: Aug.2006- March 2011
Achievements:
Aug. 2006 - Feb. 2007: Probationary Period
March 2007 - Dec. 2009: Design Engineer 1
From Jan. 2010 : Promoted to Design Engineer 2
OVERALL COMPANY CONTRIBUTIONS
* Prepare various manual for the department advantage like calculation
sheet use
in preparation of Bill of Quantity (BOQ) for Painting, Fireproofing &
Insulation.
* Good coordination with MES equipment group through phones, emails or TV
Conference regarding Technical clarification, troubleshooting and
confirmations
arising during work execution
* Contribute in meeting deadlines on or before the schedule by helping in
the
review of technical specifications and output by equipment members
* Preparation of specification (Datasheet) and design basis
* Preparation of Loading Data for static equipment used for civil
department
* Provide technical deliverables for static equipments such as Drums,
Columns
S&T Heat Exchangers, etc.
* Review detailed drawings (Vendor Drawings) like General Assembly (GA),
Body
detail, Nozzle detail, platform and ladders, Insulation and fireproofing
supports,
General Plot Plan, equipment layout, Piping & Instrumentation Diagram
(P&ID),
etc.
* Prepare TBE technical Bid Evaluation and analysis for static equipments
* Lead a team for BPS or Best Practice Sharing within the department; a
team
assign to review technical errors during vendor drawing review on past
projects
making solutions to avoid and prevents reoccurrence of the same mistakes
in
the future.
* Review platform & ladder drawings (e.g. check platform and ladder
details, bill
of materials, and possible clashing).
* Experienced to train newly hired Equipment Engineer for a period of 3
months
PROJECT INVOLVEMENTS:
3.1. PC2 Project (Mono-Ethylene Glycol)- Rabigh, Saudi Arabia ; Oct. 2006-
March. 2007
* Review of Vendors drawing for static equipments ( Drums, S&T Heat
Exchangers, Columns)
*Checking of Strength calculations for static equipments ( Drums, S&T Heat
Exchangers, Columns)
* Prepare BOQ (Bill of Quantity) for static equipments ( Drums & Heat
Exchangers)
* Prepare BOQ for platforms and ladders
* Check commissioning spare parts for static equipment (Drums & Heat
Exchangers)
* Modification of equipment datasheets for static equipment ( Drums, S&T
Heat
Exchangers, Columns)
3.2. HDPE-4 Project (High Density Poly-Ethylene)- Rayong, Thailand; May
2007- Sept. 2007
* Prepare Equipment datasheets for static equipments ( Drums, S&T Heat
Exchangers, Columns, Tanks)
* Prepare Equipment Loading data ( Drums, S&T Heat Exchangers, Columns,Tanks)
*Checking of Vendors Drawing for static Equipments (Drums & Tanks)
3.3. VCX2 Project(High Density Poly-Ethylene) -Venezuela Nov. 2007- March
2008
*Prepare Equipment datasheets for static equipment ( Drums, S&T Heat
Exchangers, Columns,Tanks)
* Prepare Equipment Loading data ( Drums, S&T Heat Exchangers, Columns,Tanks)
*Prepare Technical Bid Evaluation and Analysis (TBE) for S&T Heat
Exchangers
3.4. SME (Singapore Metallocene Elastomer)-
Jurong Island, Singapore;April 2008- Aug. 2008
*Checking of Vendors Drawing for static Equipments (Drums & S&T Heat
Exchangers)
*Checking of Strength calculations for static equipments (Drums & S&T Heat
Exchangers)
3.5. HX & 3PZ Project-Poly-Propylene-MCI, Japan; (Lead Engineer) May 2008
July 2008
*Technical correspondence between MES and DASH office
* Coordinate and make sure to meet deadlines on or before schedule
* Conducts meeting and technical clarification to MES and TV conference for
Further information
* Prepare Equipment datasheets for static equipment (Drums & S&T Heat
Exchangers,Tanks)
* Prepare Equipment Loading data (Drums & S&T Heat Exchangers)
3.6. YANPET Project (FEED or Front End Engineering Design package)
(Metallocene Elastomer)- Saudi Arabia March ~Aug 2010
* Prepare Equipment Datasheet for Static Equipments for
* S&T Heat Exchangers, Vessels, Reactors, Columns & Tanks
*Prepare Loading Data, and Strength Calculation under FEED
(Front-End Engineering design)
3.7. DAP II Project (Di-ammonium Phosphate Fertilizer Plant)
Client: Vinachem Joint Stock Company - Sept. 2010 - Jan. 2011
Location: Xuan Giao Com Bao Thang Dist. Lao Cai Province; Vietnam
*Prepare Technical Bid Evaluation (TBE) for Heat Exchanger (Plate Coolers &
Heater, Shell & Tube)
*Prepare Technical Bid Evaluation (TBE) for Filter
3.8. PETKIM Ethylene Project (Revamping project of Naphtha Steam Cracking
Plant)
Location: Aliaga Izmir, Turkey Nov. 2010 - Jan. 2011
*Prepare Mechanical Datasheets for Propylene Splitter Tower 1 & 2 using
valve
Tray as internal
3.9. SBR (Styrene Butadiene Rubber) Jurong Island, Singapore; Oct. 2010 -
Feb.
2011 (Lead Engineer)
*Technical correspondence between MES and DASH office
* Coordinate and make sure to meet deadlines on or before schedule
* Conduct meeting and technical clarification to MES and TV conference for
Further information
* Prepare Equipment List for easy monitor and updating
* Prepare BOQ for static equipment (Vessels, Columns S&T Heat exchanger &
Tanks)
* Prepare Loading data for static Equipments
3.10. Skyford EO/EG project; Feb. 2011- March 2011
Owner: Skyford chemical co. (former Nimbo Heyuan Chemical Co.)
Process Licensor: Shell Chemicals
Location: China/Ningbo (south of Shanghai)
* Prepare mechanical datasheet for Shell & Tube Heat Exchanger
4. METROWEAR INCORPORATED
A competitive company in line with Garments industry and is well known to
export branded garments such as Nike, Adidas, Under Armour and more.
Location: MEPZ I Lapu-lapu City, Cebu Philippines
Position: Kaizen Member of LEAN Department under Research and Development
Division
Company involvement period: May - July 2006
* In charge of formulating ideas for growth & advancement for the benefit
of the company.
* Conduct LEAN management in line with continuous improvement activities
* Attend and conduct seminars concerning leadership movements.
SKILLS:
Knowledgeable in working with different computer packages such
COMPRESS build 7200 (Pressure vessel design principles) software,
High proficiency in AutoCAD 2007 and the later
Bentley Microstation, Familiar with PVElite software calcuation
MS Office (Word, Excel, Outlook, etc.)
Experienced to train newly hired Mechanical Engineer member for 3 months
Strong written and verbal communication skills
Team player, with Leadership & Coaching skills
With good communication skills, Experience with Clients and have good
Negotiating skills
REFERENCES: Conversant with:
ASME Sec. VIII Div. 1 & 2, ASME II parts A~D, ASME B16.5, B31.3, etc.
TEMA, EJMA
API 660, API 650, ANSI, ASTM, JIS
and other international std.
OTHER DATA:
Education: B.S Degree in Mechanical Engineering batch 2005 graduate
School: Eastern Visayas State University Tacloban City Leyte, Philippines
School year: 2000-2005
Registered Board Passer for Mechanical Engineering exam last Oct. 2005
PRC License No.: 0066499
Passport Number: Available upon request
Passport Expiry Date: Nov. 22, 2017
Passport Place of Issue: Seoul City, South Korea
CHARACTER REFERENCES: (Available Upon Request)
WORK SUMMARY:
Oversea Experience: 1 yr in Tokyo, Japan
1yr, 11 months and counting in Seoul, South
Korea
Domestic Experience: 3 yrs and 10 months in Cebu
Philippines
Total years of relevant experience: 6 yrs., 9 months and counting..
nothing follows
Motto: "Whatever worth having is worth the effort!"