Curriculum Vitae
*. Personal Data
Name: José Miguel Coelho Ribeiro
ADDRESS: Rua Elísio Meireles Ferreira de Sousa
Building Houses Hill Bl A3 3rd Esq.
B.I. 11510490
Contacts: Mobile 919734569
E-mail: **************@****.**
2. Academic
12th Year of Schooling
3rd. Professional Experience
1998 - 2002 - Door Company in Miras Topografys
Work developed:
- Assistance in implementation of Topographic Surveys
-Assistance in the implementation of housing developments, buildings, Sanitation
Networks.
2002 - 2006 - Company Surveyor in Topografys.
Work developed:
- Execution of Topographic Surveys
- Implementation Deployment buildings, housing developments, de Águas
Stormwater Drainage Networks, Networks Sanitation.
2006 - November 2012 - Surveyor in FFMELO Company Ltd
Work developed:
- Building Port-Magnum - Porto (Volume Measurement of Earthwork).
-Underground Car park in Bayonne, Spain (Volume Measurement of Earthwork).
-Civic Center Pragal - Pragal Setúbal (Volume Measurement of Earthwork).
-Ruben-Building A - Porto (Volume Measurement of Earthwork).
-FantastiqueCable - Ribeira de Pena (Implementation of Work, Total Volume
Measurement of Work).
-Expansion of Landfill Santo Tirso (Implementation General Work Measurement and
Total Volume of Work).
Substation-Pedralva - Braga (Volume Measurement of Earthwork).
-Substation Friars - Vieira do Minho (Implementation General Work at roadworks
infrastructure, Measuring Total volume of work).
Reservoirs Baguim-Mount and Moreira - Maia Maia (Volume Measurement of
Earthwork).
-Etar of Lordelo - Birds - Vila das Aves (Volume Measurement of Earthwork).
- Substation Macedo de Cavaleiros (Volume Measurement of Earthwork).
Buildings-RAR - Matosinhos (Volume Measurement of Earthwork).
-Boost Power Dam Alqueva (Volume Measurement of Earthwork).
Substation-Lagoaça (Volume Measurement of Earthwork).
Substation-Recarei (Implementation of Work, Measuring Total volume of work).
-Access to Ecocentro of Riba d'Ave (Implementation General Building, Measuring
Total volume of work).
Mall-Acqua Portimão (Volume Measurement of Earthwork).
PC 24-Basin Ride Alegre - Porto (Network Deployment Sanitation, Stormwater,
Screens Final de Obra)
Viaduct-Corgo - Vila Real (Volume Measurement of Earthwork).
Vigorous Star-Street Sport - Porto (Implementation General Building, Measuring Total
volume of work).
PC-80-Cycle via Boavista Porto (Deployment Work and Screens Finals the same).
Construction of Metal-Pavilion w / Industrial Scrap - Rans, Penafiel. (Implementation
of General Work and Measuring Total volume of work).
Line-Modernization of Alentejo between Bombel Station and White House - New
Sales (Implementation level of earthworks and Stormwater Infrastructure,)
SnapBacks-National Roads Line Modernization in the Alentejo between Bombel
Station and White House - New Sales (Implementation General Building, measuring total
volume of the work).
Substation-Tavira (Implementation level network Road, Earthwork Volume
Measurement).
Line-Corgo between Vila Real and Ruler (Performing Polygonal properly compensated
in part the stretch approximately 12 miles).
Allotment in-Santa-Marta Penafiel (Implementation General Building, Measuring
Volume general work).
-Access to Queimodrómo - Porto (Implementation General Building, Measuring Total
Work).
-Amendment of Road Infrastructure in Zone Asprela - Porto (Implementation General
Building, Measuring total work).
-Misuse of Ribeira da Granja - Porto (Implementation General Building, Measuring
Volume of total work).
-Connecting to Rua Diogo Macedo Street Azevedo - Porto (Implementation General
Building, Measuring Volume of total work).
-Construction of New Municipal Waste Cell in Lustosa - Ambisousa (Implementation
General Building, Measuring Volume of total work).
-School Centre Penafiel (Implementation of Work, measuring volumes of general
work).
- Deployment Center in Bituminous Pedrouços - Maia (general deployment of the
work).
B-PC-2008 - Porto - Surveys of several streets to run Screens Late Work.
- PC-G 2008 - Porto - Surveys of several streets to run Screens Late Work.
PC-40-2009 - Porto - Surveys of several streets to run Screens Late Work.
4th. Computer literacy
- AutoCad
-Microsoft Excel
- Microsoft Word
- Sierra Soft - Topko
5th. Knowledge of surveying instruments
- Estação Total Pentax.
- Estação Total Leica
- GPS Leica GS15
Total availability to work both nationally and internationally
Yours faithfully
José Ribeiro