JULIE TRAN
**** ****** ***** **, *** JOSE, CA *5131 HOME: (408) 926-
6229
***********@*********.*** CELL: (408) 318-
5445
OBJECTIVE: SEEKING Electronic Mechanical ASSEMBLY
EDUCATION: RECEIVED QUALITY ASSURANCE CERTIFICATION 1990
DE ANZA COLLEGE, CUPERTINO, CA
WORK EXPERIENCES: Electronic Mechanical ASSEMBLY
-07/26/2010 to 10/21/12 SPACE LORAL SYSTEM, PALO ALTO, CA
-Manufacture electronic circuit cards for Bus Electronic
Manufacturing.
-Assemble power and communication boards to SS/L standards.
-Rework and Maintenance Cables, Thermal Vacuum Ports and New Builds.
-Perform Kit Verification and Loading of the Matrix Trays.
-Marking of components
and CCA's
-Soldering and rework using the Hakko Pre Heat
and PCBRM Volcano soldering equipment.
-work from drawing and diagrams, using power tools and solder
equipment.
-Complete all Documentation related to work performed as required by
working struction MPI.
-Continuously monitoring assembly processes for potential
improvements.
-Read and adhere to procedures and policies with attention to detail.
-Willing to work occasional overtime.
-Maintain NASA Qualifications and Applicable Certifications.
Electronic Mechanical Assembly Test
-01/16/2009 to 07/23/2010 BELL MICRO PRODUCT, SAN JOSE
95131
-Follow wire diagrams and used wire strippers to build variety of
cables for
different products.
-Inspect and Rework failure cables.
-Electrical Mechanical Assembly using torque power tools and hand
tools.
-Install assemblies shown in explosion drawing for proper
orientation.
-Hint on assembly for component, screws.
- To hold the alignment- hand tight or torque in lbs.
-Complete inspection specification for units.
-Final unit level assembly.
-Unit testing including: pressure & vacuum test as well as leak test.
-Troubleshoot and Rework, Follow Build of Materials and Procedures.
Assembly Test
-06/15/2006- 03/07/2008 TRIMBLE, Sunnyvale, CA 94086
-Build units from BOM, schematic and drawings.
-Install assembly components.
-Electrical/Mechanical assembly using torque power tools and hand
tools.
-Follow the schematic drawings to install cables.
-Used DVM voltmeter to check cables continuity and isolation.
Assembly Test
-08/20/2003- 05/25/2006 IBM
-Reconfigure machine to customers order, installing CPU cards, Memory
cards, Fiber Optical cards and cabling machines.
-Worked with document control, receiving and transfer parts to
stockroom.
-Build units read procedures and install assemblies, used screws,
voltmeter, power tools, drill, tap, and other electro-mechanical
system assembly products, install assemble cable network cables.
E M Assembly Test
-12/02/1999- 05/10/2003 ADEPT TECHNOLOGY
-Flexible factor automation for telecom, electronics,
semiconductor, fiber optical.
-PCB test, Test Adept Robot's PCB
-Troubleshooting PCB, IC checking and testing
-Inspecting component and PCBs
Electronic Assembly
-08/12/1991-10/02/1999 SANMINA CORPORATION
-PCB board contractor for Cisco, Apply Material, Evan, HP, KLA-Tencor
-PCB assembler, inspecting PCB
-Hand solder, Jumper wire, Rework
-SMT assembly and test
-Working ECO from Engineers, Document control