Post Job Free
Sign in

Power Plant Project

Location:
Rochester, NY, 14612
Salary:
38.00 an hour
Posted:
March 26, 2013

Contact this candidate

Resume:

*** ********* ****

R O C H E S T E R, N Y ** * **

1-585-***-****

***********@***.***

JOHN D. KRECKMAN

I AM INTERESTED IN A CAREER IN THE COMMUNICATIONS INDUSTRY

FULFILLING PERSONAL GROWTH AND SUCCESS WHILE ENHANCING YOUR

COMPANY’S SUCCESS THROUGH HARD WORK AND PRIOR KNOWLEDGE OF

COMMUNICATIONS.

SMART WATT ENERGY, INC. AUGUST 2012 TO PRESENT

INSTALLING ENERGY EFFICIENT LIGHT FIXTURES

LEADING EDGE TECHNOLOGY OWNER 2012 PRESENT

Working as a contractor for Tower16 on the General Dynamics AT&T

LTE project replacing batteries and power bays, running AC power feed

to the new power plants, updating power cables, replacing battery

disconnects, and rewiring equipment power as necessary.

STATEWIDE COMMUNICATIONS INSTALLER 2012 2012

Working on power plant swaps and battery replacement for AT&T’s LTE

project. Integration of Series II CDMA equipment, Carrier Ads on BTS

Mod Cells, integrated microwaves, Lucent and NEC, and introduced

Verizon’s fiber network.

365 ELECTRICIAN INSTALLER 2011 2012

I have worked for Stanley Security as a contractor installing card

readers, door contracts and motion sensors at Corning’s Glass

Research and Development Plant in Corning, NY.

STATEWIDE COMMUNICATIONS, INC CO OWNER 2005 2011

I was 50% owner responsible for site surveys, installation of power plants 24

and 48 back up battery systems. Nec and Alcatel microwave systems;

installation and optimization, new cell site builds from ac to t line facilities,

cable rack installation, grounding ac and dc wiring. I worked hand in hand

with Verizon Wireless construction engineers, equipment engineers, tower

crews and construction vendors. I am knowledgeable in installing fiber muxs,

ds3 muxs, T1’s, cross connect panels, Cat5 and Cat 6 router and data

systems. I also was responsible for managing employees.

YSC, INC. INSTALLER 2003 2 0 05

At YSC, Inc. I was responsible for installing Lucent Modcell, Modcell BTS

cabinets from1:0 through 4:0 B’s and HD’s 48 volt power systems with battery

back up, installation and optimization of Andrew’s MCPA’s, installing T1

facilities and testing them, insuring cell site alarms are properly connected to

facilities, etc.

GENERAL DYNAMICS INSTALLER 2002 2003

I was responsible for working with other vendors for microwave aligning for

Verizon Wireless, installing Modcell, Modcell BTS, cabinets, 24 48 volt power

systems with battery back up, insuring site alarms are properly connected to

facilities.

VERIZON WIRELESS INSTALLER 1992 2002

I was responsible for removing Lucent Series 1 equipment, installing Series 2

equipment and connecting to land line facilities and turning up and optimizing

to peak performance. Integration of Series II CDMA equipment Carrier Ads

on Lucent BTS Mod Cells, integrated microwaves, Lucent and NEC,

introduced Verizon’s fiber network.

REFERENCES:

Richard Foster, 1-585-***-****, retired from General Dynamics

Pete Wisely, 1-585-***-****, field technician for Verizon Wireless

Gary Delue, 1-315-***-****, owner of Delue Automotive

Mike Stocum, 1-585-***-****, owner of Rochester Custom Cycle

Kevin O’neil, 1-585-***-****, Equipment Manage for Verizon Wireless

Dave Morris, 1-585-***-****, Stanley Securities



Contact this candidate