R O C H E S T E R, N Y ** * **
***********@***.***
JOHN D. KRECKMAN
I AM INTERESTED IN A CAREER IN THE COMMUNICATIONS INDUSTRY
FULFILLING PERSONAL GROWTH AND SUCCESS WHILE ENHANCING YOUR
COMPANY’S SUCCESS THROUGH HARD WORK AND PRIOR KNOWLEDGE OF
COMMUNICATIONS.
SMART WATT ENERGY, INC. AUGUST 2012 TO PRESENT
INSTALLING ENERGY EFFICIENT LIGHT FIXTURES
LEADING EDGE TECHNOLOGY OWNER 2012 PRESENT
Working as a contractor for Tower16 on the General Dynamics AT&T
LTE project replacing batteries and power bays, running AC power feed
to the new power plants, updating power cables, replacing battery
disconnects, and rewiring equipment power as necessary.
STATEWIDE COMMUNICATIONS INSTALLER 2012 2012
Working on power plant swaps and battery replacement for AT&T’s LTE
project. Integration of Series II CDMA equipment, Carrier Ads on BTS
Mod Cells, integrated microwaves, Lucent and NEC, and introduced
Verizon’s fiber network.
365 ELECTRICIAN INSTALLER 2011 2012
I have worked for Stanley Security as a contractor installing card
readers, door contracts and motion sensors at Corning’s Glass
Research and Development Plant in Corning, NY.
STATEWIDE COMMUNICATIONS, INC CO OWNER 2005 2011
I was 50% owner responsible for site surveys, installation of power plants 24
and 48 back up battery systems. Nec and Alcatel microwave systems;
installation and optimization, new cell site builds from ac to t line facilities,
cable rack installation, grounding ac and dc wiring. I worked hand in hand
with Verizon Wireless construction engineers, equipment engineers, tower
crews and construction vendors. I am knowledgeable in installing fiber muxs,
ds3 muxs, T1’s, cross connect panels, Cat5 and Cat 6 router and data
systems. I also was responsible for managing employees.
YSC, INC. INSTALLER 2003 2 0 05
At YSC, Inc. I was responsible for installing Lucent Modcell, Modcell BTS
cabinets from1:0 through 4:0 B’s and HD’s 48 volt power systems with battery
back up, installation and optimization of Andrew’s MCPA’s, installing T1
facilities and testing them, insuring cell site alarms are properly connected to
facilities, etc.
GENERAL DYNAMICS INSTALLER 2002 2003
I was responsible for working with other vendors for microwave aligning for
Verizon Wireless, installing Modcell, Modcell BTS, cabinets, 24 48 volt power
systems with battery back up, insuring site alarms are properly connected to
facilities.
VERIZON WIRELESS INSTALLER 1992 2002
I was responsible for removing Lucent Series 1 equipment, installing Series 2
equipment and connecting to land line facilities and turning up and optimizing
to peak performance. Integration of Series II CDMA equipment Carrier Ads
on Lucent BTS Mod Cells, integrated microwaves, Lucent and NEC,
introduced Verizon’s fiber network.
REFERENCES:
Richard Foster, 1-585-***-****, retired from General Dynamics
Pete Wisely, 1-585-***-****, field technician for Verizon Wireless
Gary Delue, 1-315-***-****, owner of Delue Automotive
Mike Stocum, 1-585-***-****, owner of Rochester Custom Cycle
Kevin O’neil, 1-585-***-****, Equipment Manage for Verizon Wireless
Dave Morris, 1-585-***-****, Stanley Securities