Edrick J. Greene
Andrews S.C *9510
******.*********@*****.***
PROFESSIONAL EXPERIENCE:
Flexi Installation and commission 09/12 – Present
• Assemble Nokia 3G Outdoor/Indoor Cabinets and H frames.
• Installed the FCOA cabinets
• Preformed the installation and cabling of RF jumpers to the cabinet.
• Loaded all software on new builds.
• Commission Flexi with RIC SCF file upload
• Installed and loaded the software to the FSMB system modules.
• Installed FRIA radio modules or the FRIB radio Modules.
• Insured proper connectivity between the FRIA radio modules and the FSMB core
modules.
• Integrated site to the RNC to bring up on air for live traffic.
• Called tested each sector to make sure that it was processing calls and checked for E911
services and land line calls.
Flexi Installation and commission 02/12 – 08/12
• Assemble Nokia 3G Outdoor/Indoor Cabinets and H frames.
• Installed the FCOA cabinets
• Preformed the installation and cabling of RF jumpers to the cabinet.
• Loaded all software on new builds.
• Commission Flexi with RIC SCF file upload
• Installed and loaded the software to the FSMB system modules.
• Installed FRIA radio modules or the FRIB radio Modules.
• Insured proper connectivity between the FRIA radio modules and the FSMB core
modules.
• Integrated site to the RNC to bring up on air for live traffic.
• Called tested each sector to make sure that it was processing calls and checked for E911
services and land line calls.
Flexi Installation 04/11 – 01/12
• Assemble Nokia 3G Outdoor/Indoor Cabinets and H frames.
• Installed the FCOA cabinets
• Preformed the installation and cabling of RF jumpers to the cabinet.
• Installed FSMB system modules.
• Installed FRIA radio modules or the FRIB radio Modules.
• Insured proper connectivity between the FRIA radio modules and the FSMB core
modules.
• Installed and connected the T1 between the system module and the Telco box.
TruPosition LMU System Commissioning Engineer 08/10 - 03/11
• I would perform onsite integration and commissioning of TruPosition LMU
• I would help to isolation trouble on the E911 system.
• Drive tested LMU equipment to check GPS positioning.
• I tested LMU system to check for satellites connection and beacons.
• I would connect system to BTS for call processing.
• I would test LMU connection to the switch and then to the SMLC.
• Tested and isolated LMU T-1 issues.
• This position was 100% travel.
Ericsson GSM OM and UMTS Commissioning 02/10 – 08/10
• I would commission Ericsson 3106 and 3206 Outdoor/Indoor Cabinets.
• I also did GSM OM on the RBS and also would support the T1
• Built UMTS cabinets at my assigned sites.
• I would at times load script files to the UMTS cabinet.
• Changed out CDU’s and DTRU’s when found to be faulty.
• I Connected and tested the T1’s to the OVP when required.
• I would Verified that the Hard Lines and the T-1’s were connected to the UMTS cabinets.
• Connected and commissioned the LMU services to the cabinets
• I would also change out various UMTS components such as FU’s and RU as they were found to
faulty.
• I did the installation and configuration of the FX11 card in the UMTS system.
• Also involved in the addition of a 2nd carrier to an existing 3G network
TRAINING
Horry Georgetown Technical College
Ericsson UMTS Integration and Installation trained
Ericsson LTE Installation and Integration field trained
Nokia Flexi Field trained on installation and Integration
Ericsson Smart Laptop USB
COMPUTER AND SOFTWARE APPLICATIONS
Operating Systems: Windows 95/98/00/XP/Windows Vista:
Software Applications: Microsoft Word, Works, Excel, PowerPoint, Word Perfect, Google Apps;
References
Available upon request.