Post Job Free
Sign in

Engineer Quality Control

Location:
Granite City, IL
Posted:
March 24, 2013

Contact this candidate

Resume:

Mason Wooldridge

*** **** ***** ******

ALTON, IL 62002

618-***-****

************@*****.***

QUALIFICATIONS SUMMARY

Established reputation as a highly motivated and productive professional in

the manufacturing industry. Able to quickly and thoroughly gain expertise

in a particular field and integrate new information with existing

knowledge. Adept at combining critical analysis with imagination and

creativity. Persuasive verbal and written communicator, team player or

self directed independent employee, forward thinker, able to use available

resources to achieve goals.

PROFESSIONAL EXPERIENCE

Kemco Aerospace Mfg. -- Kirkwood, Mo (

2008 to Present

Director of Manufacturing and Engineering

My position is responsible for leading the CNC manufacturing

operations, CNC programming, manufacturing engineering and related support

personnel of the company while at the same time supporting and advancing

the company's culture.

The company operates 24/7 and requires around the clock availability from

my position. I was responsible for managing 4 shifts and approximately 50

machinists, machine operators, programmers, engineers and finishers.

Corbitt Mfg. Division of American Rail Car - St. Charles, MO

October 2006 to December 2007

Product Engineer

. Pre-project plan reviewing, overall bid preparation, assists with

forecasting of equipment, labor, and materials. Etc. Secure blueprints

and other project specifications.

. Effective monitoring and relaying information on customer products in

production.

. Effectively communicate in oral and written forms presenting

information and responding to questions from groups of manager and

customers.

Position requires ability to

OWENS-ILLINOIS - Godfrey, Illinois

October 2001 to December 2006

Manufacturing Engineer II

. Performs function of industrial engineer routing new parts, quoting

potential sales, dealing with material and processing vendor on new

and existing product lines

. Continuously evaluating processes to reduce costs, reduce lead times,

and improve quality.

. Participates in major projects focusing on process standardization and

creating cell assembly work centers.

. Implemented company's first laser work center and trained hourly

employees to operate.

. Performed root cause analysis on defective products using engineering

principles and knowledge of manufacturing processes. Determine root

cause using statistical methods. Modifies existing products to resolve

quality problems, and coordinates activities of multiple disciplines

to implement a solution.

. Design tabbed castings which allowed the use of a single fixture for

12 similar parts.

. Interim department supervisor from 4/99 to 10/99 which involved

coordinating and assigning work to 8 programmers and 3 co-op students.

. Worked under own supervision from 10/99 to 2/01 providing technical

floor support to approximately 60 second shift hourly employees.

. Assisted in the training and professional development of new hires.

CNC Programmer

April 1998 to October 2001

. Programmed Mazak Mill Turns, Okuma Lathes, Fadal 3-4 axis machines,

Laser.

. Primary programming System Mastercam

. Designed, built and programmed holding fixtures for the 3, 4, 5 axis

CNC machines.

Sales Rep.

April 1996 to October 1998

. Maintained change orders from customers and managed all RMA's that

were issued.

. Reviewed and maintained current and changing shipping requirements to

domestic and international customers.

. Maintained dialog with customers and production on all open orders and

issues.

. Reviewed sales orders and managed order from placement until parts

were received by customer.

QA Machine Inspector

April 1995 to October 1997

. Plan, coordinate and direct quality control program for assembly

inspection of IS glass bottling machines after assembly.

. Prepare daily or weekly summaries of quality control issues.

. Perform detail inspection of outgoing and assembled IS machines with

Sokkia Theolite. Required traveling throughout South America and

Europe on machine installations.

Production Planner l 1995 June 1994to October 1995

. Review master production schedule and work orders.

. Establish priorities for specific customer orders.

. Plan and schedule workflow for each work center and operation

according to previously established manufacturing sequences and lead

times.

. Prepare production reports.

. Assist purchasing with monitoring the inventories of material and

parts needed to complete production.

EDUCATION

Norco High School - Norco, CA

Riverside Community College - Riverside, CA

SOFTWARE

Mastercam, AutoCAD LT, Mazatrol

Griffo Brothers Mazatrol Emulator

G-code programming, JD Edwards One World

Cimnet, and Fortran computer programming

NX, JobBoss, Unipoint



Contact this candidate