PRASHANT GANDHI
**** ****** ****** ****, *** #W**03, Medford, MA 02155 Ph: 617-***-****
Email: ******.********.*@*****.***
WORK EXPERIENCE:
Axcelis Technologies Inc, Beverly, MA Dec 2011 - Present
Industrial Engineer – New Process Development & Optimization
Performed cost analysis to assess potential savings of $150K annually by in-sourcing an out-sourced product
Worked in a team to facilitate startup/introduction of new assembly line from project feasibility to
implementation
Drafted project’s budget requirements by estimating tooling, labor, material and capital equipment cost to fund
the development of the assembly line/new process
Formulated a detailed project plan in MS Project for timely project tracking and evaluation
Instrumental in building entire process design through application of Lean Manufacturing techniques to reduce
waste, optimize process flow and for efficient labor utilization
Partnered with Purchasing & Planning to implement 2 Bin KANBAN system for efficient material replenishment
Identified CTQ processes and incorporated in-process quality checks to increase product yield
Introduced an interactive, video enabled work instruction module as a training tool for current & future operator
Prepared 3 phased product qualification plan to gain overall Customer Acceptance
Industrial Engineer - Global Solutions Services July 2011 - Present
Utilized statistical analysis & problem solving techniques to identify and eliminate root cause of increase in
Supplier issues for company designed parts
Built deeper supplier relationship by promptly addressing fabrication issues to increase quality and reduce lead
time
Managed internal database to prioritize supplier issues and tracked progress to reduce response time
Evaluated cost out projects and generated robust solutions to increase profit margin and reduce inventory
Axcelis Technologies Inc, Beverly, MA May 2010 – May 2011
Industrial Engineer (Co-op) - Operations
Initiated a Kaizen event to plan a demand flow line by analyzing the existing process through Process mapping
Performed Time Study and process analysis to identify process wastes and implemented solutions to reduce
cycle time by 20%
Through Lean Line Balancing techniques, remodeled the process to meet the production rate
Redesigned facility floor layouts using AUTOCAD to improve floor efficiency
Successfully implemented 5S technique resulting in increase in operator efficiency
Demonstrated effective usage of Lean Six Sigma Methodologies to improve process quality by minimizing
variability to incur 20% cost benefit
Engineered a database layout to help ease the process of storing, retrieving and analyzing the information
received from various Supply Chain entities to speed up production and delivery process by 60%
Reduced variations in direct labor hours by building Standardized processes by documenting SOP’s, ECO’s and
Inspection procedures
Larsen & Toubro, Mumbai, India Nov 2008 –April 2009
Operations Engineer (Intern)
Introduced a Vendor Ownership Program to escalate purchased product quality by 35% by making necessary
improvements in their manufacturing process and production facility
Conducted root cause analysis using the concepts of Pareto Chart and Cause and Effect Di agram to identify main
cause of rejection of a product
Implemented process improvements resulting in reduction of rejection level from 75% to 8% using Statistical
Quality Control Tools like control charts
EDUCATION:
New York University, Brooklyn, NY Sept 2009 – May 2011
Master of Science in Industrial Engineering, GPA: 3.87/4.00
Relevant Courses: Lean Manufacturing, Six Sigma, Production Planning and Control, Supply Chain Management,
Operations Management, Project Management
University of Mumbai, India July 2005 – June 2009
Bachelor of Engineering in Production Engineering GPA: 3.6/4.00
Relevant Courses: Operations Research, Total Quality Management, Applied Probability & Statistics, Economics-
Finance & Costing
ACADEMIC PROJECTS:
Quality Control and Improvement: Sept 2009 – Dec 2009
Developed a process which helped to reduce the time of commute between any two given locations using
Statistical Quality Control techniques
Target Costing: Jan 2010 – May 2010
Analyzed different market constraints to find out optimum target cost of a product with the help of market
feature table, conjoint analysis, experience curve and sub system matrix.
Factory Simulation: Sept 2010 – Dec 2010
Utilized SIM Process software to develop an efficient business model of a computer manufacturing company and
analyzed results generated through various iterations by changing the parameters like number of resources,
arrival time, service time, utilization and throughput
Facility Planning and Design: Jan 2011 – May 2011
Developed a strategic master site plan for a facility by calculating complete capacity requirements, designing
facility layout & facility management system, providing smooth material and man movement by using Microsoft
Excel and Visio based models
TECHNICAL SKILLS & CERTIFICATIONS:
Six Sigma Green Belt Certified professional – PMI July 2012
Process Improvement & Optimization – Lean Manufacturing, Six Sigma, Kaizen, 5S, KANBAN, Value Stream
Mapping
Structured Problem Solving – Root cause analysis, 5Whys, PDCA cycle
AutoCAD, Solid Works, NX 5.0, Festo Fluid Simulation, SIM Process, Minitab, SmarTeam, Glovia, Microsoft Office,
C+, C++
ACHIEVEMENTS:
Awarded increment in Merit Based Scholarship at Polytechnic University consistently for all the semesters
Member of cricket team at Polytechnic University, represented university at Regional level
Organized Innovative Product Design Workshops for Indian Society of Mechanical Engineer (ISME)
Headed the sponsorship and publicity committee for Indian Institute of Industrial Engineers (IIIE)