Post Job Free
Sign in

Project Manager Engineer

Location:
Chicago, IL, 60605
Posted:
March 23, 2013

Contact this candidate

Resume:

Mikel Agirre

**** *. ******** **. *****. #**** Chicago, IL 60605 Phone: 331-***-**** abqvmk@r.postjobfree.com

ELECTRONIC ENGINEER / TECHNICAL ELECTRIC ENGINEER

Education Mr. Agirre has over 8 years of experience in design of Mechanical and

Electrical Engineering facilities. He has provided phase III, II & I

Engineering services; providing construction and design services and

project management (including LEED) for industrial and commercial

MS-Mater Energy

buildings and transportation facilities. He has successfully managed

Engineering,

complex projects gaining problem overview, experience and

(Currently)

knowledgement.

University of Illinois at

Chicago, Chicago,

Experience

IL

Techknow Engineering, Facilities Engineer, Project Manager

Chicago, IL, USA 2012-Present

BS-Electronic Idom, Facilities Engineer, Supervisor, Project Manager

Engineering,

Bilbao, Spain

University of Basque 2007-2012

country, Science Supsonik S.A., Power Electronic Engineer, Commissioner

Faculty. Leioa, Spain 2005-2007

Bilbao, Spain

GE Multilin Spain, Product Engineer

BS-Technical 2004-2005

Zamudio, Spain

Electric

Engineering,

University of Basque Electrical Experience

country, Technical

Mr. Agirre is capable of performing electrical engineering activities, having the

School of Industrial

ability to manage complex projects with strong background to perform short

Engineers. Bilbao,

circuit and voltage drops calculations, load study, relay coordination, sizing of

Spain

electrical equipment, lighting, telecommunications, security, and preparation of

technical specifications, scheduling and cost estimating and preparation of bid

documents.

Course of Vessel

Design, (960 h), Mechanical Experience

University of Basque Mr. Agirre is capable of performing heat load calculations to determine energy

country, College of efficient design, duct sizing and layout, pipe sizing and routing, making detailed

Nautical and Naval construction drawings, preparing plans and specifications, scheduling and cost

Machines. Santurce, estimating and preparation of bid documents.

Spain

Relevant projects

Mr. Agirre’s recent work includes the following projects:

Chicago Park District - Goudy Park

Mr. Agirre served as MEP Engineer for refurbishing all Goudy park facilities

according to the new architectural conception. The project consisted on the design

of the lighting installation (Energy efficient design based on LED luminaries /

Electronic light control and AGI32 simulations), the design of the sanitation facility

(adding catch basins and pipes) and the grading.

1212 S. Michigan Av. Apart. #1903 Chicago, IL 60605 Phone: 331-***-**** abqvmk@r.postjobfree.com

1

Illinois State Toll Highway Authority I-90 “Smart Corridor” Project

In this collaboration with “Transystems”, Mr. Agirre, as Electronic and technical

Electric Engineer, provided Electrical and ITS design for the complete renovation

and widening of the I-90 highway from milepost 17.3 to 53.4. The scope of work

includes an overall conceptual design for power distribution; HV / LV distribution

design and implementation, study of possible Green Energy Sources (wind-solar),

and the specific design for a 4 mile section (lighting and ITS).

IDOT Pump Station 24

Mr Agirre is performing an Electrical construction inspection for a new Pump

Station 24. The work comprises commissioning of the main switchboard (two

Comed service lines and a generator), MCC-s, Pumps, Scada, Fire Protection and

Intrusion systems. Mr Agirre is working as a testing commissioner supervisor for

the construction project manager.

Chicago Housing Authority

Mr Agirre served as Mechanical Engineer for MEP renovations at various buildings

to comply with the Chicago Building Code, including HVAC and Fire Protection

design. His work also included site assessments, recommendation for design

improvements, for energy conservation and the replacement of boiler rooftop

units and air conditioning units to maximize energy utilization.

Chicago Public Schools – Edison Park Elementary School Annex

Mr Agirre provided services for Electric Engineer; Including Electric design, Fire

Detection and Alarm system design, telecommunication design for this new

elementary school annex. The school annex was 34,000 square feet size. The

project consisted of the following components: Classroom, Science Laboratory,

kitchen, dining room, office spaces, parking lot and recreational lighted area. The

related work included coordination and interconnection with the existing building

facilities. This project was designed to comply with the LEED requirements.

Torre Iberdrola Skycraper (Bilbao, Spain)

Mr Agirre was involved in the design and construction of the Torre Iberdrola

skyscraper (565 ft, 42 Storey). He was part of the Prime Engineering work team

providing his services for MEP design and field supervision.

During the designing phase Mr Agirre was involved on the design and calculation

of the HVAC production and distribution. Mr Agirre’s duties also included Building

Management System architecture definition, design and implementation. The

scope of work included facilities specifications, cost estimation and executive

summaries.

During construction phase, Mr Agirre working on a three member team was

involved on the overall supervision of facilities (Electrical HV-LV, HVAC, BMS, Fire

Protection System, Plumbing and Communications). The scope of work included:

Surveying, Field & Design problem resolution, reviews and approvals of all

material and equipment alternatives, Negotiate with constructors, monthly

progress reports, RFI, Change orders, costs estimation, Project Management

Assistant and pursue Silver LEED requirements.

New Headquarters of IDOM-Bilbao (Bilbao, Spain)

Mr Agirre was involved in the design and construction of a $20 M building and car

park facilities for IDOM Bilbao. Mr Agirre, as an assistant of the MEP leader, was

involved on the concept design and development of the whole HVAC and Building

Management System. The scope of work included concept design, Engineering

design, plan development, revision and coordination with architecture and rest of

facilities, bidding, field supervision and commissioning.

1212 S. Michigan Av. Apart. #1903 Chicago, IL 60605 Phone: 331-***-**** abqvmk@r.postjobfree.com

2

Vigo’s New Hospital (Vigo, Spain)

Mr Agirre was involved in the design of a $130 M hospital in Vigo, Spain. As a

member of MEP Outsourced Engineering company, he was involved on the

definition, design and implementation of the Building Management System and

helped the client during the review of HVAC design project.

Misurata University (Misurata, Libya)

Mr Agirre provided services for Electrical Engineering to develop a University

campus in Libya. Idom as Impregilo’s outsourcing company was responsible to

develop a masterplan for a new university. Mr Agirre, as a part of a work team,

performed Electrical and ITS Engineering design for three university buildings

including HV / LV design, load estimation, Lighting, power data/communication.

The related work included plans, cost estimation and executive summary under

British Standards.

District Heating at Bolueta (Bilbao, Spain)

Mr. Agirre served as Technical Electric Engineer for developing a district Heating in

Bilbao. Mr Agirre provided services to specify the generator, to design the HV / LV

substation and to design electric equipment. In addition, he worked as assistant of

the project leader, to calculate thermal load balance and he studied the viability

and Return On Invest of the different design alternatives.

Red Electrica Española

Mr. Agirre served as Power Electronic Engineer to performance the commissioning

of different power electronics equipment (Rectifier, Ups, Battery Charger) on

Electric substations all along Spain. The work included testing at the place of

manufacture, field revision, commissioning and maintenance.

Computer Skills

MS Office

AutoCAD, Micro Station

Design Builder, Hap

Agi32, Dialux

1212 S. Michigan Av. Apart. #1903 Chicago, IL 60605 Phone: 331-***-**** abqvmk@r.postjobfree.com

3



Contact this candidate