JOSE GARY SEGUI, PE, MSMS
Villas de Paran, S-* #29 8th St., San Juan, PR 00926; Mobile #: 787-225-
8661; ****.*****@*********.***
PROFESSIONAL GOAL: A challenging leadership career position as a Manager,
Project & Facilities Engineering
WORK EXPERIENCE:
Jan 1995 - Jan 2013: Director, Aircraft Maintenance Operations (Full &
Part Time Status), 156th Airlift Wing, Mu iz Air National
Guard Base, Puerto Rico Air National Guard
Supervised approximately 200 specialists that perform on/off equipment
maintenance for C-130E transport and F-16C/D fighter aircraft valued at
over $85 million. Ensured timely execution of aircraft propulsion,
structural, avionic, guidance and control system modifications. Directed
sound operations through mission capable rates and system reliability
programs, and reported data analysis to Higher Headquarters. Formulated
plans and policies, and advised on capabilities, negative trends and
adherence to schedules. Developed and monitored maintenance metrics, and
validated Data Base Management and Deficiency Analysis. Managed
maintenance resources with a $17 million annual budget.
Oct 2010 - Jan 2012: Special Projects Manager, Infotech Aerospace
Services - A Pratt & Whitney Joint Venture, Isabela, Puerto
Rico
Quality Business Lead and Discipline Chief for the engineering
organization. Led quality and proficiency requirements, and instituted
business metrics and project execution processes. Ensured strict
realization of quality systems, customer satisfaction feedbacks, and
utilization rate objectives. Drove major special projects essential to
multiple engineering departments. Promoted and monitored on-time delivery
of project's Statements of Work products through EVMS, and decreased turn-
around times and continuous improvements initiatives. Guaranteed the
creation of effective Product Quality Criteria and Work Execution
Procedures. Developed and certified personnel qualifications.
Feb 2000 to Mar 2008: Senior Plant Maintenance Engineer and Supervisor,
AstraZeneca PLC at IPR Pharmaceuticals, Incorporated,
Can vanas, Puerto Rico
Supervised twenty-five technicians specialized as industrial planners,
mechanics, electricians, instrumentists, and facilities maintenance.
Managed Lean Six Sigma and 6S project initiatives, Corrective / Preventive
Actions (CAPAs), and outsourced services. Assured continuous operations of
production and support areas. Monitored commissioning and validation
processes. Managed spare parts specification, inventory, and technical
manuals library. Led annual budget, planning and scheduling activities.
Ensured adherence to OSHA, EPA and cGMP documentation standards.
Aug 1997 to Feb 2000: Senior Project Engineer, AstraZeneca PLC
Pharmaceutical, Carolina, Puerto Rico
Led major engineering projects to comply with time and budget allocations
and parameters. Responsible for manufacturing and utilities systems
modifications. Reviewed product designs for adherence to engineering
principles, company standards, and customer contract requirements. Defined
Scope of Work and commissioning specifications. Issued validations
acceptance criteria and coordinated their executions. Led bidding package
build-ups, pre-bid meeting presentations and selection processes. Ensured
company Safety, Health, and Environmental proceedings.
Jan 1995 to Aug 1997: Process Engineer, Mentor Caribe, Incorporated,
Cidra, Puerto Rico
Directed reliability and quality improvement programs for the manufacturing
of Intra-Ocular Lenses. Developed and implemented innovative product
programs through lean 6S techniques and cost comparison studies. Launched
product transfer and start-up qualifications, cost reductions and
improvement activities. Provided technical expertise for CAPAs and process
design issues. Developed area specifications, and performed design reviews
and bill of materials.
Feb 1994 to Oct 1994: Project Engineer, MOVA Pharmaceutical Corporation,
Caguas, Puerto Rico
Managed project activities for the construction of manufacturing areas, new
utilities equipment acquisitions and modifications. Performed cost
analysis and evaluated viable alternatives to ensure effective utilization
of resources. Ensured timely completions and manufacturing continuity
through sound coordination. Validated procedures assuring optimization and
compatibility with existent systems. Evaluated contractor quality and
performance for reliability and efficiency. Performed system design
reviews, and evaluated and certified construction design and system
schematics.
Nov 1991 to Dec 1993: Systems Integration Program Manager, MEl Technology
Corporation and Electronic Systems Center, Bedford,
Massachusetts
Directed planning, coordination, and support activities for the
construction and integration of five Caribbean Basin Radar Network sites in
Venezuela, Costa Rica, Honduras and Panama. Performed critical design
reviews, and directed start-up activities. Supervised test teams and
evaluated contractor technical engineering proposals and performance.
Coordinated logistical support with Host Nation Agencies for the timely
delivery of essential equipment, materials, and utilities. Acted as the
Technical Advisor for the Host Nation, U.S. Embassies, and Drug Enforcement
Agencies.
Nov 1989 to Nov 1991: Test Program Manager, USAF Development Test Center,
Eglin AFB, Florida
Led development, test, and evaluation for five major fighter weapons
programs. Designed, outlined, and validated procedures, scheduled
resources, analyzed data, and authored technical evaluation reports.
Trained and supervised test-teams of 90 engineers. Directed Test Readiness
Review boards and led critical design reviews. Discovered and corrected F-
16C software compatibility issues that enhanced flight / weapons control
system's efficiency and durability.
Jun 1985 to Nov 1989: Aircraft Maintenance Manager, 33rd Fighter Wing,
Eglin Air Force Base, Florida
Managed on-equipment maintenance of F-15C/D front line air power resources
valued at $1 billion. Supervised 270 personnel during combat flight
activities for a three-shift operation. Directed quality assurance
inspection section and ensured specified procedures compliance. Directed
maintenance planning, scheduling, analysis, and execution.
EDUCATIONAL BACKGROUND: M.S. Management Sciences, Troy State
University, Alabama, 1990
B.S. Mechanical Engineering, UPR Mayaguez,
Puerto Rico, 1985
MILITARY CREDENTIALS: USAF Lieutenant Colonel (Ret) and Program Director;
28 Years of Honorable Service; Senior Staff
Command Positions; Deputy Maintenance Group
Commander, Operations Enduring & Iraqi
Freedom, Kuwait (2008); Top Secret (Inactive)
and Secret (Active) Security Clearances;
Meritorious and Commendation Combat Service
Medals
ADDITIONAL SKILLS: Computer Literate; MS Office & Project, PowerPoint,
AutoCAD & SAP
Fully Bilingual, Spanish and English; Lean
Six Sigma Tools Courses,
Systems Acquisition and Project Management
Professional Courses,
TQM & ASQC, Green and LEED, and Environmental
Safety Courses
Purified and Waste Water, Air and Steam, and
Power Systems Courses
Aircraft Systems Safety, Testing, Propulsion
and Flight Controls Courses
CERTIFlCATIONS: Professional Engineer, PE License No. 17164; OSHA 30
hours, College of Engineers and Land
Surveyors of Puerto Rico, ASME & ISPE
REFERENCES: Available Upon Request