Trevor Root, P.E. Civil Engineer
abqssy@r.postjobfree.com
Skill Summary
Primary Software Secondary Software
Autocad Civil 3D ArcGIS
Bentley WaterCad Hec-HMS
Microsoft Office Suite
Design/Technical
Water Modeling Water Pump/Booster Station Design Land Surveying
Water Master Planning Pump Selection and Specification Construction Staking
Water Transmission Pipeline Design VFD and Multiple-Pump Analysis Land Development
Hydraulic Valve Specification Wastewater Lagoon Design Roadway Design
Water Storage Tank Design
Project Management
Scope Preparation Client Management Submittal Reviews
Contract Preparation Subconsultant Management Billings and Budget Review
Staff-Day Estimates Construction Contract Administration Design-Team Coordination
Education
Boise State University, 2003-2007 Pumptech Engineering Training, April 2011 JUB Project Manager Training
B..S. Civil Engineering Joe Evans PumpEd101.com Eighteen 1-Hour Sessions
Professional License
Professional Engineer in Idaho
Issued 12/16/2011 - License No. P-14918
Prior Employment
J-U-B Engineers, Inc. - Twin Falls, ID Sunrise Engineering Inc. - Boise, ID
October 2008 to April 2012 January 2007 to August 2008
- Multidisciplinary office - Land Development, Municipal Engineering
- Municipal Engineering, Water/Wastewater, Transportation - Residential Subdivisions, Commercial Lots
City of Boise, Public Works - Boise, ID All Points Land Surveying - Twin Falls, ID
February 2006 to May 2006 Summers/Weekends 2000 to 2006
- Surveying Internship - Property surveys, Legal Descriptions, Research
- GIS Data Entry from Sewer Record Drawings - Subdivision Design and Construction Staking
Experience Summary
Civil3D Core-Group Expert for company-wide standards, training, and template management;
CAD Management for multiple design projects, including plan set creation and specifications;
Project Management, Client Management, and Design for 75 MG condensate storage pond for industrial facility;
Pump Station Design and Specifications;
Water Transmission Main Design and Specifications;
Roadway Design and Corridor Modeling;
Recycled Water Permitting;
Water Master Planning;
Water distribution modeling;
Stormwater modeling and reports;
Lagoon sizing, design, and specifications.
Experience Detail
City of Twin Falls Eastland Drive Reconstruction Project (2008-2009)
Typical Role: Direct assistant to transportation engineer for various design tasks.
Primary CAD designer and as-needed trainer for drafting staff in Civil3D.
Project Summary: One mile of road widening from two-lane to four-lane
in developed residential area with intersection design.
Roadway corridor design and modeling in Civil3D
Plan set creation
Company's first large project in Civil3D
Scoped for deliverable of CAD drawings to client
Construction machine control based on corridor model
Trained City Staff in Civil3D
City of Twin Falls Arsenic Compliance Project (2008-2012)
Typical Role: Direct assistant to multiple engineers for various design and construction tasks.
Lead for management of drafting needs.
Project Summary: Design of over 40,000 feet of 30" and 24" water transmission main.
Design of a 10,200 gpm booster pumping station with four 250 HP vertical turbine pumps.
Divided into three pipeline phases and a pumping station phase for design and construction.
Multiple Phases:
Facilities Plan Update and EID (2008/2009)
Calibrated Water Model using Bentley WaterCAD Analyzed Well Production Data
Analyzed Fire Flow, Equalization, and Emergency Storage Analyzed System Water Demand
Analyzed Pumping Station Capacity Assisted in Report Preparation
Arsenic Compliance and Water Supply Preliminary Design (2009)
Route Evaluation for Transmission Mains Assisted with Blending Analysis
Pipe Sizing and Material Evaluation Preliminary Cost Estimates
Assisted with Preliminary Engineering Report creation
2010 Water System Improvement Project (2010)
CAD Design Manager for all phases Route Design and Valve Selection
Plan set creation in Civil 3D Assisted with Specification Creation
Bidding phase assistance Pump Analysis and Design
Construction observation Submittal Review and Contract Administration
Experience Detail Continued
City of Wendell Wastewater Facilities Improvement Project (2011-2012)
Typical Role: Direct assistant to project manager and lead for treatment plant related design and specifications.
Project Summary: Included upgrades to existing collection system and treatment facilities.
Design of piping, aeration, sludge removal, headworks upgrades, new storage lagoon, and a land application site.
Sludge removal research and alternatives analysis Collection system design and plan creation
Lagoon sizing and flow evaluation Lagoon design and quantity evaluation
CAD assistance and drafting management Permitting for Land Application Site
Conagra (Twin Falls Plant) Wastewater Discharge Line Replacement (2011)
Typical Role: Direct assistant to project manager, local contact, and
lead for drafting and on-site construction engineering.
Project Summary: Design/Build for replacement of a failed 16 inch
wastewater lineon side of Rock Creek canyon wall.
Included 150 feet of 16 HDPE in a steel casing with
75' elevation drop and energy dissipation structure.
Preliminary evaluation and alternatives analysis
Design of pipeline location and grade
Coordination with geotechnical subconsultant for micro-piles
Design of slope protection and BMP's
Field construction observation and testing coordination
Amalgamated Sugar Company (Paul, ID Plant) Condensate Storage Pond (2011)
Typical Role: Client Manager, Project Manager, and Lead Designer under the supervision of a senior engineer.
Project Summary: Design of a 75 MG HDPE lined storage pond and 2400 feet of
10 inch HDPE transmission piping.
Scoping, Staff-day Estimate, Contract Preparation
Design and Grading of storage pond
Coordination with geotechnical and structural engineers
Plan set creation and specifications
Bidding assistance and Construction contract administration
Construction Engineering
Amalgamated Sugar Company (Twin Falls, ID Plant) Condensate Storage Pond Preliminary Design (2012)
Typical Role: Primary engineer under the supervision of a project manager.
Project Summary: Preliminary design of an 80 Million Gallon storage pond.
Included design of 5 primary layout alternatives and 5 additional
variations based on selected alternative.
Grading design in Civil3D and Quantity Evaluation
Scoping, Staff-Day Estimate, Contract Preparation
Coordination with geotechnical engineer
Cost Estimates
Creation of a report summarizing options and other considerations
Meetings with Client
Experience Detail Continued
Hulen Meadows Homeowners Association Well House Upgrades (2009)
Typical Role: Direct assistant to engineer for design, plan set creation, and specification creation.
Project Summary: Replacement of well pump, piping, and building for increased capacity of an existing well house.
Well pump analysis, pump selection, and specification Design of hydraulic valves and piping
Hulen Meadows Homeowners Association Water Master Plan Update (2011)
Typical Role: Lead for preparation of a water master plan under the supervision of a project engineer.
Project Summary: Update to a previous Water Master Plan for a community north of Ketchum, ID.
Water model creation, Calibration, and Distribution analysis Storage and Supply analysis
Hulen Meadows Homeowners Association Water Storage Tank and Pipeline (2011-2012)
Typical Role: Lead designer of a water storage tank and pipeline under the supervision of a project engineer.
Project Summary: Design of a 120,000 gallon buried water storage tank on a hillside and 1500 feet of 10 inch transmission pipeline.
Plan Set creation and specifications Grading Design in Civil3D
City of Bliss Sewer Collection and Treatment Project (2009/2010)
Typical Role: Direct assistant to engineer for Civil3D lagoon grading design and as-needed assistance/training for drafting staff.
Project Summary: Design of four facultative wastewater lagoons in a location with basalt rock at or near natural ground elevation.
CAD Grading Design of Lagoons in Civil3D Cut/Fill and Rock Excavation Balance
Conagra (Twin Falls Plant) Stormwater Evaluation and Improvements (2011)
Typical Role: Local contact for engineers in Boise and Kennewick offices and as-needed support for calculations and technical memos.
Project Summary: Analysis of plant roof and parking lot stormwater volumes and flows.
Field verification of existing roof and parking lot slopes Analysis of expected flows using HEC-HMS
City of Ketchum Water Master Plan (2009)
Typical Role: Lead for preparation of a water master plan under the supervision of a project engineer.
Project Summary: Update to a previous water master plan.
Update and calibration of water model Storage, Supply, and Distribution Analysis
Meetings with client Alternatives Recommendations and Cost Analysis
Conagra (Twin Falls Plant) Stormwater Evaluation and Improvements (2011)
Typical Role: Local contact for engineers in Boise and Kennewick offices and as-needed support for calculations and technical memos.
Project Summary: Analysis of plant roof and parking lot stormwater volumes and flows.
Design of stormwater conveyance and pre-treatment facilities.
Field verification of existing roof and parking lot slopes Analysis of expected flows using HEC-HMS
Meetings with client Assistance with technical memos
City of Twin Falls On-Call Water Modeling (2008-2012)
Typical Role: Performed modeling and prepared technical memos under the supervision of a project engineer.
Project Summary: As-needed water modeling for impact of proposed subdivisions and major buildings to City's system.
Modeled City's system using Bentley WaterCAD Prepared technical report and figures
Performed fire flow analysis Recommended considerations for future growth
Trevor Root 208-***-**** abqssy@r.postjobfree.com www.trevorroot.com/resume/