Christopher Bonner
Email: abqfy6@r.postjobfree.com
Address: **** ****** ***** *****
City: YPSILANTI
State: MI
Zip: 48197
Country: USA
Phone: 734-***-****
Skill Level: Management
Salary Range: $98,000
Primary Skills/Experience:
See Resume
Educational Background:
See Resume
Job History / Details:
Christopher L Bonner
7294 WILLOW CREEK DRIVE
YPSILANTI, MI 48197
Phone: 734-***-****
CELL: 734-***-****
E-mail: abqfy6@r.postjobfree.com
Professional Profile:
I am an engineer with 18 years` experience in the Automotive industry, specifically injection and insert molding. I am looking to utilize my leadership and problem solving skills in a manufacturing atmosphere that will challenge me and allow me to continue to grow as a leader. My leadership background in Operations, Engineering, Production and Materials allows me to adapt easily in most manufacturing environments. My diverse history as a manager in each of these disciplines facilitates teamwork and provides a unique well rounded perspective when faced with the challenges that occur in a fast paced production world.
Experience:
Materials Manager/Production Manager April 2004-Dec 2012
Lear Corporation 26575 Northline Road, Taylor, MI 48180
Responsibilities:
* Supervise and support production and shipping staff.
* Coordinate daily production activities with production staff to maintain adherence to customer release requirements.
* Schedule and prioritize daily mold change activity.
* Maintain and review on an ongoing basis plant capacity and labor requirements.
* Plan tooling corrections and Engineering changes with tooling Manager and local tool houses.
* Work with production staff to improve through put, and OEE.
* Maintain 100% delivery with OEMS.
* Provide adequate stock levels to meet customer requirements.
* Minimize premium freight and increase inventory turns.
* Support quality staff through 8D problem resolution process.
* Develop and maintain processes/procedures for TS16949 compliance.
Achievements:
2012
* Implemented 2 material substitution opportunities on 12 production tools as cost savings opportunity, resulting in annual savings of $50k
2011
* Spearheaded launch of 15 new production tools for Ford U502, and P473 programs
* Assisted in one piece flow process improvements for GM and Peterbilt assembly process
* Initiated material substitution on all talc-filled polypropylene tools to an alternate source as cost savings opportunity for plant
2010
* Championed the launch of new business with Volkswagen
* Achieved A rating on VW Logistics Audit
* Reestablished 3rd shift operation to increase production capacity, and decrease overtime
* Developed working knowledge of VW LISON/Container Management system
2009
* Reduced from 3 shift operation to 2 shift operation with little disruption to delivery.
2008
* Introduced Skip lot system for incoming receiving inspection
* Implemented freight savings reduction with Lear internal plants resulting in annual savings of $150k.
* Demonstrated working knowledge of GM Power Supply system to begin direct shipments to GM Wentzville
2007
* Instituted cycle counting process
* Established returnable packaging for internal Lear Customers resulting in cost savings for the plant
* Developed working knowledge of Chrysler SMART, and Ford DDL system for pulling releases and submitting ASNs for direct shipments to Ford and Chrysler facilities
2006
* Spearheaded and created blending operation for utilization of excess regrind
* Implemented cost savings opportunities through material substitution opportunities, championed each opportunity through the sampling process to final PPAP approval at customer
2005
* Introduced production monitoring and scheduling system through the use of MATTEC production reporting system
Operations Manager April-2003- April-2004
Lear Corporation 26575 Northline Road, Taylor, MI 48180
Responsibilities:
* Provide scheduling and daily production activities for all shifts.
* Prioritize tool and press repair, scheduled preventative maintenance activities for presses.
* Maximize plant OEE through green belt projects and other plant efficiency projects.
* Reduce off-standard labor through process improvements and production poka-yokes.
* Provide development opportunities for process technicians, die-setters, and material handlers.
Achievements:
2004
* Re-deployed all die-setters through SMED (Single Minute Exchange of Die) program to improve mold change times and reduce press downtime
Engineering Manager/Operations Manager (dual role 2001-2003) May-2000- April-2003
Lear Corporation, 26575 Northline Road, Taylor, MI 48180
Responsibilities:
* Manage and support Engineering group on a daily basis.
* Quote new business opportunities for plant.
* Program manages new tool development from business award to PPAP.
* Implement process improvement initiatives on production floor to improve efficiency and reduction of scrap.
* Initiate engineering changes on timely basis.
* Maintain and update pfmea, control plans and process flows for all products.
* Support quality group in problem resolution and manufacturing process improvements.
* Gatekeeper for APQP process.
Achievements:
2003
* Managed seem-less transfer of 260 active production tools into plant. The process included the concurrent transfer and installation of 16 injection molding machines.
2002
* Championed transfer of insert molding tools and machines to other internal Lear Plants
2001
* Developed and established pad print operation on all 3 shifts
* Orchestrated plant in-sourcing of tools from El Paso plant with little disruption to plant delivery and quality
* Achieved Six Sigma Green Belt certification
* Developed plant capacity plan to track press capacity and labor requirements
Product Engineer Aug-1995-May-2000
United Technologies Automotive (Lear 1998) 26575 Northline Road, Taylor, MI 48180
Responsibilities:
* Program manages new tooling from prototype stage to production.
* Coordinate engineering changes on various straight injection and insert molded products.
* Compile and submit PPAP packages for new product launches and engineering changes.
* Perform root cause analysis on customer quality concerns through 8D format.
* Implement internal tooling corrections.
* Assist customer assembly plants during production validation builds.
Quality Control Engineer Dec-1994-Aug-1995
United Technologies Automotive St Matthews, SC
Responsibilities:
* Provide layouts for quality and engineering departments.
* Institute component rework and sort activities through off site support systems.
* Assist in new product line launches and prepared PPAP packages for various Ford, Chrysler, and GM product lines.
* Compile monthly supplier quality and vendor rating reports for SQA Manager.
* Inspect incoming buyer sample submissions and issued supplier notification reports.
* Assist in Materials Review Board issues. Utilize courses taken in SPC and GD&T.
On-site Technical Representative at Eaton`s Cutler Hammer Plant (Sumter, SC). 11/93-7/94
Arcon Fastener Corporation Augusta, GA
Responsibilities:
* Assist in fastener selection for new design and redesign.
* Maintain proper inventory levels for over 400 different types of hardware. Initiate consolidation program to lower on hand inventory and costs.
Education:
ARIZONA STATE UNIVERSITY Tempe, AZ
Bachelor of Science, Aerospace Engineering, December 1992
Computer Skills:
* Microsoft Word
* Microsoft Excel
* Microsoft PowerPoint
* Microsoft Access
Additional Information:
* Working knowledge of the following OEM web based delivery systems, VW Group Supply, GM Supply Power, Chrysler Smart, Ford DDL, Delphi I-supply
* MMOG
* Certified Six Sigma Green Belt June-2001
* EDI, MRP, QAD MFG PRO
* MDOT HAZ. MAT TRAINING Feb-2008
References:
Available upon request