Post Job Free

Resume

Sign in

Project Manager

Location:
West Chester, OH
Posted:
January 28, 2013

Contact this candidate

Resume:

Ken Bolt Resume **** ** **

KENNETH G. BOLT

**** ******* **. **** ******* OH 45069

Home: 513-***-**** Cell: 513-***-****

abqbt7@r.postjobfree.com

SUMMARY

Multi-disciplined professional highly successful in both Electrical Engineering and IT roles.

Excelled in adapting to and meeting diverse business challenges. Demonstrated strength in

developing and implementing new business processes and technologies. Reputation as a

strong leader; recognized for getting things done. Equally comfortable working independently or

on teams. Excellent communication and people skills and an outstanding work ethic.

Hands-on leadership, engineering, design, and operational experience with:

Nickel Alloys Chemicals Manufacturing Food Manufacturing

Manufacturing

Project Management Process Control Advanced Process

Control

DCS PLC LIMS

CMMS MRO Purchasing MRO Inventory Control

EPA VOC Systems EPA Deep Well Injection EPA Boiler Emissions

USDA NR Systems Food Pathogens Microbiology Sanitation

SOX Compliance SOX Monitoring Windows O/S

LAN WINTEL Servers Exchange/Outlook

Active Directory Admin Plant Power & Lighting Switchgear Coordination

High Voltage Maintenance Quality Assurance PLM

Other skills include:

Microsoft Office Microsoft Access Microsoft Visio

Microsoft Project Root Cause Analysis Fishbone Diagrams

Data Flow Diagrams Data Modeling Statistical Process Control

X-Bar /R Charts Pareto Diagrams 6-Sigma

@AGlance ISA SP72 ITIL V3 SQL Server

Crystal Reports Continuous Improvement

Additional strengths include:

Oral & Written Mentoring & Training Team Building

Communication

Conflict Resolution Interpersonal Relationships Problem Solving

PROFESSIONAL EXPERIENCE

PIERRE FOODS, Cincinnati, OH

Consultant 2010 Present

Consulted on project management and system administration of an overdue and under

designed PLM project using ORACLE Agile (Prodika) product.

Defined remaining deliverables and created a project plan to complete them

Developed system for tracking project status.

Designed queries and reports to support business requirements.

Designed queries to perform specification quality control

Lead effort to redesign interface to Prism ERP system.

KENNETH G. BOLT PAGE 2

Created Microsoft Access process to clean and transfer data from Prism to Agile.

Created new and standardized Agile specification record structures.

Re-engaged business groups to recognize and accommodate their business requirements

Developed specification change management process.

Promoted IT support system using internal and external resources.

SARA LEE FOODS, Cincinnati, OH

Manager Information Security 2006 2009

Managed team of 16 direct reports performing security access provisioning for all Sara Lee

North America users and performing SOX monitoring of Level-1 applications and databases.

Brought in to address business issues affecting the department. Responded to challenge to

bring the department under control, re-engineer and create new processes, improve

performance, initiate continuous improvement, and repair business relationships.

Corrected process problems and improved performance. Initiated budget controls saving

approximately $180M annually on a $1MM budget. Implemented statistical control

performance metrics for continuous improvement. Lowered average days to deliver from 5

to 3 days. Lowered daily SLA exceptions from 100 to 5. Increased percentage of on-time

delivery from 70% to 96%.

Revamped security administration processes for SOX compliance. Transitioned security

provisioning of Level-1 applications to eliminate SOD issues. Created new processes for

data owner approval of access requests for Level-1 applications.

Spearheaded implementation of new SOX monitoring process. Authored Sara Lee policy

and documented the procedures. Implemented tools to monitor databases and operating

systems. Designed and implemented SOX security incident tracking and resolution system.

QA Applications Manager 2003 2006

Provided technical leadership, project management, and budgetary control for development of

business application systems for QA, Food Safety, and Regulatory Compliance. Hired

specifically to get stalled LIMS project moving again. Achieved goal and much more by

designing new systems and processes to address regulatory, microbiology, and quality issues.

Engineered and implemented LIMS System at 15 meat-manufacturing facilities. Functioned

as the project manager and project owner. Designed process for maintaining manufacturing

specifications. Established SPC strategy and created SPC charts for quality control.

Trained plant users in SPC techniques and LIMS operation.

Influenced LIMS vendor to implement new modules of my design for microbiological control

and for management of USDA Non-compliance Records. Negotiated reduced cost in return

for marketing rights. Created database models, dataflow diagrams, and requirements.

Performed quality control, testing, and implementation. Trained plant microbiology and

quality assurance staff.

SUNOCO CHEMICALS, Haverhill, Ohio

Regional Manager Process Control & IT 1979 - 2002

Created and managed DCS/IT department of 13 direct reports responsible for process control

and automation, IT infrastructure, business systems, and networking at two chemical facilities.

Provided leadership, vision, strategy, and engineering for all phases of process control and IT.

Responsible for all life cycle phases including design, engineering, project management,

installation, startup, operations, and continuous improvement. Prepared and managed $700M

operating budget.

KENNETH G. BOLT PAGE 3

Lead the engineering to implement projects up to $1.5MM for 4 DCS green field projects

and to retrofit 3 DCS systems replacing old panel board controls.

Negotiated with vendor for major DCS revisions of my design at no cost in return for

marketing rights. Included continuous collection DCS Data Historian and read-only DCS

Enterprise Operator Console. Created design documents, data models and requirements.

Participated in design reviews and performed beta and acceptance testing.

Specified, installed and programmed $50M DCS to simulate packaged boiler and Phenol

plant operation. Trained 20 operators.

Installed and operated Honeywell Advanced Process Controller for a Phenol plant. Identified

independent and dependent variables and to collect data. Designed and configured control

strategy.

Designed and implemented interfaces between multiple DCS systems and between DCS

and LIMS.

Proposed, obtained agreement, and implemented a complete IT infrastructure for a

chemical plant. Included LAN, domain servers, application servers, file servers, email

servers, and PCs. Trained 200 users on Microsoft Office and Outlook.

Took technical lead and project management roles for a $250M LIMS project. Evaluated and

selected LIMS vendor. Developed business model, database model, and requirements.

Installed, tested, and configured system.

Modified LIMS system to perform customer order fulfillment process by integrating LIMS and

customer order systems. Performed process discovery and analysis. Designed process and

created requirements including data model and data flow diagrams. Participated in

development reviews, beta testing, and acceptance testing. Trained 5 order-processing

administrators.

Accepted challenge of implementing long desired but previously failed $2.4MM CMMS

project. Succeeded in implementing integrated modules for maintenance management,

MRO inventory management, and MRO purchasing management saving $3.4MM over 4

years. Lead team to customize CMMS to model business processes with end-to-end

responsibility for engineering, project management, coding, testing, and start-up. Authored

and conducted training program for 450 users.

Managed team of 5 people to consolidate 5 maintenance storerooms. Eliminated duplicate

and obsolete parts. Developed common part numbering system, categorization, and

descriptions. Performed usage analysis and set proper inventory levels and reorder points.

Initiated perpetual inventory counting process. Reduced inventory by 35% saving $3MM.

EDUCATION

BSEE, Electrical Engineering

University Of Cincinnati, Cincinnati, OH

HONORS

University of Cincinnati Honors graduate

ETA KAPPA NU National Electrical Engineering Honorary

TAU BETA PI National Engineering Honorary

KENNETH G. BOLT PAGE 4



Contact this candidate