M AN ISH KU MAR SHUKLA
J***, Sector-**, Gurgaon, India Ph: +91-965-***-**** E-mail:
****************@*****.***
Passport: F9059054 (Valid Till: Oct 11 2016)
P ROFESSIONAL SUM MARY
Professional work experience of 7 years in Static Equipment Design of Refineries and Petrochemical Plants.
Experience visiting vendor’s fabrication shops for fabrication drawing approval within project schedule.
Proficient in ASME Code Calculation and Finite Element packages PVElite, Compress, and FE Pipe.
Knowledge of ASME Sec VIII Div.1, Div.2, IS, IBC, UBC, ASCE and other supporting Codes.
Proficient in AutoCAD, MATHCAD, Microsoft Office Package, Smart Sketch.
EDUCAT ION
Bachelor in Mechanical Engineering – Uttar Pradesh Technical University, India
Marks -73.2% June’02 – June’ 06
PROFESSIONAL EXPER IENCE
Kellogg Brown and Root- Technology, Gurgaon, India Oct’10 – Present
Technical Professional Engineer – Vessel Mechanical Engineering
Key Responsibilities:
Mechanical designing for KBR proprietary equipments such as Secondary Reformer WHB, Secondary Reformer,
Ammonia Converter, Transfer Line, and other critical equipments.
Preparation and Reviewing of Technical Requisitions.
Evaluating Technical Bids submitted by vendors and communicating with them for timely execution of project.
Providing technical support to fresh graduates as required in project.
Review and Evaluation of Vendor Prints, calculations and quality documents such as WPS, PQR, ITP and other
technical documents submitted for KBR’s review within stipulated cycle.
Projects:
Worked on KBR’s proprietary Secondary Reformer WHB and drafted design manual for mechanical design step
involved for new engineers and upcoming projects.
Worked on KBR’s proprietary Ammonia Converter and drafted internals calculation sheet for quick design check
with vendor’s submitted calculation. Subsequent reduction in review cycle.
Worked on KBR’s proprietary FCC (revamp) by providing FE model analysis for spent catalyst standpipe’s
damaged arms and FE model analysis for rectangular tangential nozzle for fourth stage separator.
Larsen and Toubro (L&T)-Chiyoda, Vadodara, India Aug’06 – Oct’10
Senior Static Equipment Engineer – Static Equipment Department
Key Responsibilities:
Providing detail design calculation including WRC analysis, wind and earthquake calculation for Pressure vessels,
Process Columns and Reactors.
Preparing and providing engineering requisition for vendors, also evaluating technical bids for vendor selection.
Providing technical questionnaires to vendors for acceptance of compliances and deviations.
Review and approval of vendor fabrication drawings and visiting vendor shop for review of fabrication activity.
Page 1 of 2
Assisting and coordinating in inter-department 3D model review and minimizing clash check in PDS model.
P rojects:
Worked on detail engineering of Reactor – Regenerator (side-by-side) assembly of FCC unit based on ABB
Lummus Technology. – M/s Indian Oil Corp. Ltd. (IOCL) - India
Worked on detail engineering of pressure vessels, columns and reactors of following projects:
• Sulfur Recovery Unit – M/s Indian Oil Corp. Ltd. (IOCL). - India
• Lube Oil Based Stock Up-gradation – M/s Hindustan Petroleum (HPCL). - India
• Methanol and CO associated facility – M/s Saudi Formaldehyde (SFCCL).- Saudi Arabia
• Hydrogen Unit – M/s Mangalore Refinery (MRPL) - India
• Petrochemical and Aromatic Complex – M/s ONGC - India
R ELEVANT AREAS OF EXPERT ISE:
Thorough knowledge of Static/Fixed Equipment design based on ASME, ANSI, API.
Thorough knowledge of use of mechanical software such as PVElite, COMPRESS, FE Pipe.
Familiar with specifications / standards of renowned organizations such as KBR, EIL, UOP, Haldor Topsoe & other
reputed organizations.
Performed FE analysis of critical nozzles of FCC unit Nozzle Pro also, performed FE analysis of FCC spent
catalyst stand pipe (under revamp).
Performed FE analysis of rectangular tangential opening in Fourth stage separator for decision making of final
thickness and placement of stiffeners.
AutoCAD, MathCAD, MS Office and Smart Sketch.
DEPUTAT IONS:
Deputed to KBR Houston for FCC job (revamp) : Duration 3 months (Oct’11 – Jan’12)
Page 2 of 2