SAM HU
Tel: 905-***-****
Cell: 416-***-****
Email: **********@*****.*** / ***.**@**********.***
OBJECTIVE
. Piping Designer / Drafter
PROFESSIONAL HIGHLIGHT
. 15+ years working experience on Chemical / Petrochemical projects
. Practical and in-depth knowledge in P&ID developing and pipeline
arrangements
. Proficient in SmartPlant 3D and PDS
. Proficient in Microstation and AutoCAD
. Analytical, practical, resourceful and detail-oriented
. Good team player and Quick-learner
WORK EXPERIENCE
Piping Designer SNC-Lavalin, Toronto, ON.
Dec. 2011 ~ Current
Major Accomplishments
. BHP Jansen 2.0 MTPA Potash Project - Definition Phase
. Agrium Potash Project - Detail Design
. Gordes 2.0 MPTA Nickel Project - Detail Design
Main Responsibilities
. Piping design and backdraft pipelines on Smart Plant 3D
. Model and modify Titanium piping, fitting and support
. Model and modify pumps, tanks, temporary steel and other equipments in
Equipment Model
. Coordinate with sub lead, checkers and other disciplines to fix piping
problems
. Select location and types of pipe supports
. Extract Stress Iso for stress reviewing
. Clear clash
. Extract and modify IFC Iso
. Being assigned to Romania office for one month to help them issue IFC
Iso
Piping Designer Shaw Energy & Chemical, Mississauga, ON.
May 2011 ~ Dec. 2011
Kirkuk Refinery Project Sep. 2011 ~
Current
It is a Feasibility study and Pre-Feed Project. It is a refinery plant in
Iraq and the capacity is 150,000 BPSD. There are more than 15 units in this
project.
. Review and comment Licensor's P&ID and equipment layout.
. Create, modify and re-arrange structures, building, equipments and pipe
rack layout in SP3D, based on Licensor's plot plan
. Piping design large bore ( >10")
. Coordinate with sub lead and other disciplines to fix piping and P&ID
problems
. Perform squad check
. Extract Iso of critical lines
SABIC-PK, 140 KTA ABS Project, Re-Feed May, 2011~Aug. 2011
ABS plant consists of Chemical Storage unit, PBL unit, HRG unit, SAN unit,
Compounding unit and BOP unit.
. Create, modify and re-arrange structures, building, equipments and pipe
rack layout of BOP unit
. Control master P&ID of BOP, and highlight each line after being modeled
. Piping design both large bore and small bore of BOP, HRG and PBL unit
using Smart Plant 3D
. Estimate line size and width of piperack
. Coordinate with sub lead and other disciplines to fix piping and P&ID
problems
. Backdrafting and design new pipeline on the tif file of previous drawing
in Microstation
. Perform squad check
. Extract Iso of critical lines
Piping Designer JNE Consulting, Hamilton, ON.
Dec. 2010 ~ March, 2011
ArcelorMittal DOFASCO - No.4 Galvanizing Line Conversion to Galvalume
Project
. Develop Flow Diagram and detail piping design of compressed air system,
recircle tempered water combination loops, steam system, condensate
lines using 2-D AutoCAD
. Design and locate pipe supports
. Site visit for measurement and field check
Piping Designer AMEC, Oakville, ON.
March. 2010 ~ Sep. 2010
Imperial Oil Resources Ventures Ltd - Kearl Oil Sand Project
. Piping design of pond area (On Module) using PDS
. Piping design of Water Treatment Plant (Off Module) using PDS
. Model and modify pumps, tanks, temporary steel and other equipments in
Equipment Model
. Coordinate with sub lead, checkers and other disciplines to fix piping
problems
. Select location and types of pipe supports
. Extract Stress Iso drawing for stress reviewing
. Run PDS data conflict reports and Equipment Nozzle reports before Iso
check print
. Clear clash
. Backdraft isometric drawings issued for construction
Piping Designer Shaw Energy & Chemical, Toronto, ON.
Dec. 2008 ~ Oct. 2009
Marathon, Catlettsburg Refining LLC
June, 2009 ~ Oct. 2009
MSAT II Sulfolane Revamp Project
. Modify Tie Points on Construction P&ID and Demolition P&ID based on
survey and clients' comments
. Coordinate with site staffs and clients to locate Tie Points
. Produce piping designs (large bore & small bore) using PDS
. Select location and types of pipe supports
. Work with other designers to resolve piping interferences
. Extract isometric drawings issued for checking, approval and
construction
. Review iso drawings and Model in SPR with clients to ensure standards of
quality and accuracy are met
YANSAB HDPE Project, site service Yanbu, Kingdom of Saudi Arabia
April, 2009~May, 2009
. Do field check and modify existing isometric drawings using PDS
. Extracted isometric drawings issued for construction
. Generate Bills of Materials
. Review and coordinate with other disciplines
SABIC-PK ABS Feed Project Dec.
2008 ~ Mar. 2009
. Piping design of HRG unit using Smart Plant 3D
. Piping design of Compounding area using Smart Plant 3D
. Modeling equipments using Smart Plant 3D
. Extract Iso for checking and issuing
. Work with other designers to resolve piping interferences
Piping Designer Shaw Energy & Chemical, Kingston, ON,
Oct., 2007 ~ Nov. 2008
Ajax site of DUPONT / INVISTA
. Modify & create as built P&ID in Microstation
. Do field check and modify existing isometric drawings or create new iso
. Compile documentation for project close
. Discuss with the clients about their requirements and recommend design
and changes for cost and schedule savings
. Determine piping layout and develop piping isometrics using best
practices
Piping Designer & Drafter Miley Company Ltd. Toronto, ON.
June, 2007~Sep. 2007
This is a small Chemical/ Petrochemical engineering company. I used
AutoFlow and AutoOrtho to perform the following jobs:
. Developed and generated P&ID.
. Generated mechanical equipment layout and process pipe routing layout
from P&ID
. Prepared and performed detail process piping design
. Reviewed and coordinated with other team members
. Prepared special supports as required
. Performed drafting work of other disciplines, such as Electrical, Civil
Structure and Control & Instrument
Piping Designer 1990-
2003
Oil Refining Division at JLPEC Design Institute, SINOPEC
Nanjing, China
. Performed P&ID, Plot plan and Equipment layouts developing and drafting
. Performed PDS piping modeling of detailed process piping design taking
into consideration its operability, maintainability, accessibility, cost-
effectiveness and other project specifications
. Extracted isometric drawings issued for construction
. Reviewed and coordinated with other disciplines
. Participated in project review meetings and site visit
. Provided engineering support to construction and plant start-up
MAJOR ACCOMPLISHMENTS
. Design of a 400Kt/y delayed coking plant with absorption and
stabilization 2002~2003
Ten million dollar new plant from grassroots
Using PDS 3D piping model to detailed piping design
. Revamp of a 150Kt/y hydrocarbon separation unit
2001
Million dollar revamp
Using PDS 3D piping model to detailed piping design
. Revamp of a 1,500Kt/y atmospheric and vacuum distillation plant
2000
Multi-million dollars revamping
. Design of a 200Kt/y desulfurization of gas and LPG plant
1998~1999
Million dollar new plant from grassroots
. Revamp of a 150Kt/y desulfurization of gas and LPG plant
1997
. Revamp of distillation system of 400Kt/y delayed coking plant
1996
Million dollar revamp
. Design of a 30Kt/y MTBE Plant
1995
. Revamp of a 1,500Kt/y atmospheric distillation plant
1993~ 1994
Process Engineer Jul 1987-
Jul. 1990
Jinling Petro-Chemical Company, SINOPEC
Nanjing, China
Worked in the following plants:
800Kt/y Residue cat-cracking Unit
Dec 1988~June 1990
2,500Kt/y Atmospheric and vacuum Distillation Unit Jul
1987~Nov 1988
EDUCATION & TRAINING
. Bachelor Degree (Petroleum Processing)
1983~1987
East China University of Science and Technology Shanghai, China
. PDS 3D training Shanghai, China
Aug. 2000
. Bachelor Degree Certified by University of Toronto
April, 2006
. Microstation V8 training Shaw Energy and Chemicals,
Kingston Mar. 2008
. Smart Plant 3D training Shaw Energy and Chemicals, Toronto
Dec. 2008
. Smart Plant P&ID training SNC-Lavalin Toronto
Mar. 2012
REFERENCE
. Available upon request